Block 7049, lot 024
230 Lakeview Ave
- City’s use
- Single Family Residential
- Built
- 1908
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,396 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 10, 2018 | Completed final sign-off Dec 2018 | 230 Lakeview Av | Anthony Sachelli Remodeling | remodel kitchen. no change of (e) floor plan.Details
remodel kitchen. no change of (e) floor plan. | $61,516 |
| Jun 13, 2016 | Completed final sign-off Apr 2017 | 230 Lakeview Av | Anthony Sachelli Remodeling | replace (e) exterior rear yard deck with (n) balcony & spiral stair to grade with (n) concrete patio at grade. add 2 new skylights.Details
replace (e) exterior rear yard deck with (n) balcony & spiral stair to grade with (n) concrete patio at grade. add 2 new skylights. | $45,000 |
| Jun 10, 2016 | Never finaled issued Jun 2016, no final | 230 Lakeview Av | street space & sidewalkDetails
street space & sidewalk | ||
| Jun 23, 2015 | Completed final sign-off Jul 2016 | 230 Lakeview Av | Anthony Sachelli Remodeling | repair dryrot sheathing and studs. replace in-kind stucco, aprox 650sf. area of work is at rear of house.Details
repair dryrot sheathing and studs. replace in-kind stucco, aprox 650sf. area of work is at rear of house. | $12,500 |
| Apr 16, 2015 | Completed final sign-off Jun 2015 | 230 Lakeview Av | Excelsior Roofing Company | reroofingDetails
reroofing | $14,350 |
| Mar 26, 2015 | Completed final sign-off Jul 2015 | 230 Lakeview Av | Anthony Sachelli Remodeling | interior remodle of (e) ground floor bathroom & bathroom. replace (e) plumbing fixtures & lighting in bathroom. replace rear sliding glass door with (n) patio doors. replace rear bathroom window. max u factor 0.32Details
interior remodle of (e) ground floor bathroom & bathroom. replace (e) plumbing fixtures & lighting in bathroom. replace rear sliding glass door with (n) patio doors. replace rear bathroom window. max u factor 0.32 | $21,500 |
| Jun 26, 2014 | Completed final sign-off Aug 2014 | 230 Lakeview Av | Brady Construction Inc | site retaining wall. replace failing retaining wall with new concrete retaining wall along west pl at rear yardDetails
site retaining wall. replace failing retaining wall with new concrete retaining wall along west pl at rear yard | $10,000 |
| Jan 7, 2013 | Completed final sign-off Apr 2013 | 230 Lakeview Av | Mulhall Construction Inc. | voluntary seismic strengthening new concrete stem wall extension voluntary frame strengthening.Details
voluntary seismic strengthening new concrete stem wall extension voluntary frame strengthening. | $12,000 |
| Sep 21, 2012 | Completed final sign-off Apr 2013 | 230 Lakeview Av | Brady Construction Inc | demo sheetrock on ground level wall in kind. replace with 5/8 type x walls & ceiling.Details
demo sheetrock on ground level wall in kind. replace with 5/8 type x walls & ceiling. | $6,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Anthony Sachelli Remodeling (4), Brady Construction Inc (2), Excelsior Roofing Company, Mulhall Construction Inc.
- Architects
- Carl Scheidenhelm, Carl Scheldenhelm
- Authorized agent-otherss
- Stephen Medina
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.