De Star Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Mar 2022
- Last 24 months
- 0 permits filed
33 permits since 2000: 33 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 1, 2022 | Completed final sign-off Jul 2022 | 3200 Judah St | revision to 202110180679. repair the stucco of the side wall. repair the siding on the backyard. not visible from street.Details
revision to 202110180679. repair the stucco of the side wall. repair the siding on the backyard. not visible from street. | $30,000 |
| Dec 3, 2021 | Completed final sign-off Jul 2022 | 3200 Judah St | interior remodel for duplex. both units, remove abandoned elevator. 2nd floor unit provide new bath, 2nd floor unit convert dinig to new bedroom. 2nd floor unit: convert living to nw living /dining. 2nd floor unit, remodel kitchen by removing bearing wall. 3rd floor unit: provide nw closet.Details
interior remodel for duplex. both units, remove abandoned elevator. 2nd floor unit provide new bath, 2nd floor unit convert dinig to new bedroom. 2nd floor unit: convert living to nw living /dining. 2nd floor unit, remodel kitchen by removing bearing wall. 3rd floor unit: provide nw closet. | $15,000 |
| Nov 8, 2021 | Completed final sign-off Jul 2022 | 3200 Judah St | replacement of 14 windows at the front facade. all windows to be alum. clad woood and casement. four existing glass blocks to remain.u+.30Details
replacement of 14 windows at the front facade. all windows to be alum. clad woood and casement. four existing glass blocks to remain.u+.30 | $8,000 |
| Oct 18, 2021 | Completed final sign-off Jul 2022 | 3200 Judah St | remodel one kitchen and one bathroom on the 2nd floor. no changes to windows. no moving walls or new walls. repair the stucco of the exterior wall at front in kind.Details
remodel one kitchen and one bathroom on the 2nd floor. no changes to windows. no moving walls or new walls. repair the stucco of the exterior wall at front in kind. | $15,000 |
| Nov 20, 2020 | Completed final sign-off Jan 2022 | 1231 30th Av | adding one adu at existing part of first floor area. existing space was approved per app # 201704244656.Details
adding one adu at existing part of first floor area. existing space was approved per app # 201704244656. | $10,000 |
| May 16, 2017 | Completed final sign-off Mar 2018 | 1427 Felton St | provide one story in fill 204 sqft below extg 2nd floor overhang at rear. provide 2 new bedrooms, one new family room and one new bath at ground floor. 720 sq ft mew conditioned space.Details
provide one story in fill 204 sqft below extg 2nd floor overhang at rear. provide 2 new bedrooms, one new family room and one new bath at ground floor. 720 sq ft mew conditioned space. | $60,000 |
| Apr 24, 2017 | Completed final sign-off Jan 2018 | 1231 30th Av | add 3 bedrooms, 1 family room, 2 full bathroom & laundry on existing g/f, add 1 full bathroom and remodel existing kitchen on 2/fDetails
add 3 bedrooms, 1 family room, 2 full bathroom & laundry on existing g/f, add 1 full bathroom and remodel existing kitchen on 2/f | $110,000 |
| Feb 17, 2017 | Completed final sign-off Apr 2017 | 1383 Church St | to comply with physical inspection reprot #cc - 8073Details
to comply with physical inspection reprot #cc - 8073 | $4,000 |
| Oct 6, 2016 | Completed final sign-off Apr 2017 | 138 Lower Tr | infill 2nd & 3rd flr south kitchen wall and new wall btwn dining rm & living rm to create new 4th bedrm remove f.p. remove kitchen west wall and create new peninsula counter. relocate w/d from garage into units. new stair from 3rd flr to roof. new roof deck via roof hatchDetails
infill 2nd & 3rd flr south kitchen wall and new wall btwn dining rm & living rm to create new 4th bedrm remove f.p. remove kitchen west wall and create new peninsula counter. relocate w/d from garage into units. new stair from 3rd flr to roof. new roof deck via roof hatch | $65,000 |
| Jul 18, 2016 | Completed final sign-off Apr 2017 | 138 Lower Tr | replace existing aluminum windows with new aluminum insulated windows (4) visible from street. re-frame four rear windows to sliding glass doors with 42-inch guard rails. remodel 2/3rd fl bath with expsansion into lightwell. replace kitchen cabinetsDetails
replace existing aluminum windows with new aluminum insulated windows (4) visible from street. re-frame four rear windows to sliding glass doors with 42-inch guard rails. remodel 2/3rd fl bath with expsansion into lightwell. replace kitchen cabinets | $82,000 |
| Jun 8, 2016 | Completed final sign-off Apr 2017 | 1383 Church St | bathroom remodels on 2nd and 3rd floor. n/a for maher.Details
bathroom remodels on 2nd and 3rd floor. n/a for maher. | $60,000 |
| Nov 12, 2015 | Completed final sign-off May 2018 | 463 Sunrise Wy | legalize as-built unit (#1) on 1st floor per plan. (2) bedrooms, (1) bathroom, kitchen.Details
legalize as-built unit (#1) on 1st floor per plan. (2) bedrooms, (1) bathroom, kitchen. | $6,000 |
| Nov 6, 2015 | Completed final sign-off Mar 2017 | 2243 42nd Av | 1st floor: add 2 bedrooms and 2 bathrooms. 2nd floor:remodel kitchen and 1 bathroom, add 1 bathroom, and cover open stairs to create interior staircase. new patio and demolish shed at rear.Details
1st floor: add 2 bedrooms and 2 bathrooms. 2nd floor:remodel kitchen and 1 bathroom, add 1 bathroom, and cover open stairs to create interior staircase. new patio and demolish shed at rear. | $60,000 |
| Oct 14, 2015 | Completed final sign-off Mar 2017 | 463 Sunrise Wy | 1)relocate extg bedroom and living room in 2nd floor per plan. 2)kitchen remodel on 2nd floor per plan. 3)add one full bath on 2nd floor per plan. 4)add deck at rear per plan.Details
1)relocate extg bedroom and living room in 2nd floor per plan. 2)kitchen remodel on 2nd floor per plan. 3)add one full bath on 2nd floor per plan. 4)add deck at rear per plan. | $30,000 |
| Aug 28, 2015 | Completed final sign-off Mar 2017 | 1059 Portola Dr | revision to pa 2014-1022-9645 ground floor: add 1 study room & wet bar; relocated (e) furnace & (e) water per plan; relocate m bath, enlarge ath with sauna & hot tub; resize storage, exterior stairs repair in kind; add 240 volt outlets at garage & bath; main floor: relocate fire place; relocateDetails
revision to pa 2014-1022-9645 ground floor: add 1 study room & wet bar; relocated (e) furnace & (e) water per plan; relocate m bath, enlarge ath with sauna & hot tub; resize storage, exterior stairs repair in kind; add 240 volt outlets at garage & bath; main floor: relocate fire place; relocate | $5,000 |
| Apr 23, 2015 | Completed final sign-off Jul 2015 | 3016 20th Av | repair front and rear wall stucco exterior leakage. repair in-kind, (56 sq. ft.)Details
repair front and rear wall stucco exterior leakage. repair in-kind, (56 sq. ft.) | $3,000 |
| Feb 25, 2015 | Completed final sign-off Mar 2017 | 1059 Portola Dr | relocate master bath, enlarge ground floor, turn bedroom into storage, add one study room & one wet bar, relocate fire place, fridge, add new recessed light, add new retaining wall, bpa 201410229645.Details
relocate master bath, enlarge ground floor, turn bedroom into storage, add one study room & one wet bar, relocate fire place, fridge, add new recessed light, add new retaining wall, bpa 201410229645. | $40,000 |
| Feb 11, 2015 | Completed final sign-off Dec 2015 | 227 Farallones St | rear bldg - relocate powder room & kitchen on 1st floor & enlarge bedroom, add partition wall & bathroom remodel on 2nd floor in accessory bldg per plan.Details
rear bldg - relocate powder room & kitchen on 1st floor & enlarge bedroom, add partition wall & bathroom remodel on 2nd floor in accessory bldg per plan. | $40,000 |
| Jan 13, 2015 | Completed final sign-off Jan 2015 | 2083 19th Av | repair water leakage place in front of 2nd floor common area only.Details
repair water leakage place in front of 2nd floor common area only. | $800 |
| Dec 22, 2014 | Completed final sign-off Aug 2015 | 634 43rd Av | interior remodel. add 1 bedroom, 1 sun room, 1 family room, 1 game room and 2 baths at garage level. no expansion to building envelope.Details
interior remodel. add 1 bedroom, 1 sun room, 1 family room, 1 game room and 2 baths at garage level. no expansion to building envelope. | $60,000 |
| Nov 24, 2014 | Completed final sign-off Jul 2015 | 763 32nd Av | revision to approved p.a. #2014.0818.4031. revise kitchen remodel, layout, revise new bathroom layout on 2nd floor.Details
revision to approved p.a. #2014.0818.4031. revise kitchen remodel, layout, revise new bathroom layout on 2nd floor. | $1,000 |
| Oct 22, 2014 | Completed final sign-off Mar 2017 | 1059 Portola Dr | add 2 bedrooms, 2 baths & one mud room on 1st flr, add one bathroom, one powder, one skyline on 2nd floor per plan, (e) kitchen & (e) bathroom remodel on 2nd flr per plan.Details
add 2 bedrooms, 2 baths & one mud room on 1st flr, add one bathroom, one powder, one skyline on 2nd floor per plan, (e) kitchen & (e) bathroom remodel on 2nd flr per plan. | $50,000 |
| Aug 20, 2014 | Completed final sign-off Dec 2014 | 75 Valdez Av | replace 8 rear facade windows in-kind w/vinyl windows @ 2nd floor. remove side door & exterior wood steps at kitchen.Details
replace 8 rear facade windows in-kind w/vinyl windows @ 2nd floor. remove side door & exterior wood steps at kitchen. | $12,000 |
| Aug 20, 2014 | Completed final sign-off Dec 2014 | 75 Valdez Av | remodel (e) bathroom. provide (n) half bath. all work to be on 2nd floor. no structural work.Details
remodel (e) bathroom. provide (n) half bath. all work to be on 2nd floor. no structural work. | $18,000 |
| Aug 18, 2014 | Completed final sign-off Jul 2015 | 763 32nd Av | to add two bedroom, one family room, two full bathrooms & laundry /hall on existing ground floor per plan. to add one full bathroom & remodel existing kitchen, bathroom on 2nd floor per plan.Details
to add two bedroom, one family room, two full bathrooms & laundry /hall on existing ground floor per plan. to add one full bathroom & remodel existing kitchen, bathroom on 2nd floor per plan. | $100,000 |
| Aug 13, 2014 | Completed final sign-off Dec 2014 | 75 Valdez Av | remodel kitchen on 2/f, repair drywall on 2/f for electrical work, patch back in-kind.Details
remodel kitchen on 2/f, repair drywall on 2/f for electrical work, patch back in-kind. | $15,000 |
| Jul 1, 2014 | Completed final sign-off Aug 2014 | 1879 14th Av | repair front deck less than 50%; repair front siding not to exceed 80 sq.ft.Details
repair front deck less than 50%; repair front siding not to exceed 80 sq.ft. | $3,500 |
| Jun 30, 2014 | Completed final sign-off Jul 2015 | 281 Oxford St | add new family room, bedroom, bath and storage room at ground floor. now work on second floor. no structural workDetails
add new family room, bedroom, bath and storage room at ground floor. now work on second floor. no structural work | $35,000 |
| May 5, 2014 | Completed final sign-off Aug 2014 | 1879 14th Av | remove unpermitted glass enclosure under extg rear deck. no change in extg bldg envelope. no structural work.Details
remove unpermitted glass enclosure under extg rear deck. no change in extg bldg envelope. no structural work. | $5,000 |
| Mar 19, 2014 | Completed final sign-off Aug 2014 | 1879 14th Av | provide closet, provide new gas insert fireplace on ground floor.Details
provide closet, provide new gas insert fireplace on ground floor. | $5,000 |
| Sep 4, 2013 | Completed final sign-off Apr 2014 | 31 Cuvier St | remodel rooms down for 33 cuvier, provide new interior stairs for open spatial connection. provide 2 new full bathrooms, new bedroom, new family room & storage.Details
remodel rooms down for 33 cuvier, provide new interior stairs for open spatial connection. provide 2 new full bathrooms, new bedroom, new family room & storage. | $50,000 |
| Sep 4, 2013 | Completed final sign-off Jan 2015 | 75 Valdez Av | provide rooms down. add 2 bedrooms, 2 baths, family room, storage room. no work on 2nd flDetails
provide rooms down. add 2 bedrooms, 2 baths, family room, storage room. no work on 2nd fl | $70,000 |
| Aug 28, 2013 | Completed final sign-off Apr 2014 | 31 Cuvier St | rebuild entry dry rotted wood front staris, reduce width of stairs to have 3ft minimum or width. new stairs to have code complying risers & treadsDetails
rebuild entry dry rotted wood front staris, reduce width of stairs to have 3ft minimum or width. new stairs to have code complying risers & treads | $8,000 |