Back to kitchen remodel contractors
De Star Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Mar 2022
- Last 24 months
- 0 permits filed
33 permits since 2000: 33 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 14 completed. Typically 18 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2021 | Completed final sign-off Jul 2022 | 3200 Judah St | interior remodel for duplex. both units, remove abandoned elevator. 2nd floor unit provide new bath, 2nd floor unit convert dinig to new bedroom. 2nd floor unit: convert living to nw living /dining. 2nd floor unit, remodel kitchen by removing bearing wall. 3rd floor unit: provide nw closet.Details
interior remodel for duplex. both units, remove abandoned elevator. 2nd floor unit provide new bath, 2nd floor unit convert dinig to new bedroom. 2nd floor unit: convert living to nw living /dining. 2nd floor unit, remodel kitchen by removing bearing wall. 3rd floor unit: provide nw closet. | $15,000 |
| Oct 18, 2021 | Completed final sign-off Jul 2022 | 3200 Judah St | remodel one kitchen and one bathroom on the 2nd floor. no changes to windows. no moving walls or new walls. repair the stucco of the exterior wall at front in kind.Details
remodel one kitchen and one bathroom on the 2nd floor. no changes to windows. no moving walls or new walls. repair the stucco of the exterior wall at front in kind. | $15,000 |
| Apr 24, 2017 | Completed final sign-off Jan 2018 | 1231 30th Av | add 3 bedrooms, 1 family room, 2 full bathroom & laundry on existing g/f, add 1 full bathroom and remodel existing kitchen on 2/fDetails
add 3 bedrooms, 1 family room, 2 full bathroom & laundry on existing g/f, add 1 full bathroom and remodel existing kitchen on 2/f | $110,000 |
| Oct 6, 2016 | Completed final sign-off Apr 2017 | 138 Lower Tr | infill 2nd & 3rd flr south kitchen wall and new wall btwn dining rm & living rm to create new 4th bedrm remove f.p. remove kitchen west wall and create new peninsula counter. relocate w/d from garage into units. new stair from 3rd flr to roof. new roof deck via roof hatchDetails
infill 2nd & 3rd flr south kitchen wall and new wall btwn dining rm & living rm to create new 4th bedrm remove f.p. remove kitchen west wall and create new peninsula counter. relocate w/d from garage into units. new stair from 3rd flr to roof. new roof deck via roof hatch | $65,000 |
| Jul 18, 2016 | Completed final sign-off Apr 2017 | 138 Lower Tr | replace existing aluminum windows with new aluminum insulated windows (4) visible from street. re-frame four rear windows to sliding glass doors with 42-inch guard rails. remodel 2/3rd fl bath with expsansion into lightwell. replace kitchen cabinetsDetails
replace existing aluminum windows with new aluminum insulated windows (4) visible from street. re-frame four rear windows to sliding glass doors with 42-inch guard rails. remodel 2/3rd fl bath with expsansion into lightwell. replace kitchen cabinets | $82,000 |
| Nov 12, 2015 | Completed final sign-off May 2018 | 463 Sunrise Wy | legalize as-built unit (#1) on 1st floor per plan. (2) bedrooms, (1) bathroom, kitchen.Details
legalize as-built unit (#1) on 1st floor per plan. (2) bedrooms, (1) bathroom, kitchen. | $6,000 |
| Nov 6, 2015 | Completed final sign-off Mar 2017 | 2243 42nd Av | 1st floor: add 2 bedrooms and 2 bathrooms. 2nd floor:remodel kitchen and 1 bathroom, add 1 bathroom, and cover open stairs to create interior staircase. new patio and demolish shed at rear.Details
1st floor: add 2 bedrooms and 2 bathrooms. 2nd floor:remodel kitchen and 1 bathroom, add 1 bathroom, and cover open stairs to create interior staircase. new patio and demolish shed at rear. | $60,000 |
| Oct 14, 2015 | Completed final sign-off Mar 2017 | 463 Sunrise Wy | 1)relocate extg bedroom and living room in 2nd floor per plan. 2)kitchen remodel on 2nd floor per plan. 3)add one full bath on 2nd floor per plan. 4)add deck at rear per plan.Details
1)relocate extg bedroom and living room in 2nd floor per plan. 2)kitchen remodel on 2nd floor per plan. 3)add one full bath on 2nd floor per plan. 4)add deck at rear per plan. | $30,000 |
| Feb 11, 2015 | Completed final sign-off Dec 2015 | 227 Farallones St | rear bldg - relocate powder room & kitchen on 1st floor & enlarge bedroom, add partition wall & bathroom remodel on 2nd floor in accessory bldg per plan.Details
rear bldg - relocate powder room & kitchen on 1st floor & enlarge bedroom, add partition wall & bathroom remodel on 2nd floor in accessory bldg per plan. | $40,000 |
| Nov 24, 2014 | Completed final sign-off Jul 2015 | 763 32nd Av | revision to approved p.a. #2014.0818.4031. revise kitchen remodel, layout, revise new bathroom layout on 2nd floor.Details
revision to approved p.a. #2014.0818.4031. revise kitchen remodel, layout, revise new bathroom layout on 2nd floor. | $1,000 |
| Oct 22, 2014 | Completed final sign-off Mar 2017 | 1059 Portola Dr | add 2 bedrooms, 2 baths & one mud room on 1st flr, add one bathroom, one powder, one skyline on 2nd floor per plan, (e) kitchen & (e) bathroom remodel on 2nd flr per plan.Details
add 2 bedrooms, 2 baths & one mud room on 1st flr, add one bathroom, one powder, one skyline on 2nd floor per plan, (e) kitchen & (e) bathroom remodel on 2nd flr per plan. | $50,000 |
| Aug 20, 2014 | Completed final sign-off Dec 2014 | 75 Valdez Av | replace 8 rear facade windows in-kind w/vinyl windows @ 2nd floor. remove side door & exterior wood steps at kitchen.Details
replace 8 rear facade windows in-kind w/vinyl windows @ 2nd floor. remove side door & exterior wood steps at kitchen. | $12,000 |
| Aug 18, 2014 | Completed final sign-off Jul 2015 | 763 32nd Av | to add two bedroom, one family room, two full bathrooms & laundry /hall on existing ground floor per plan. to add one full bathroom & remodel existing kitchen, bathroom on 2nd floor per plan.Details
to add two bedroom, one family room, two full bathrooms & laundry /hall on existing ground floor per plan. to add one full bathroom & remodel existing kitchen, bathroom on 2nd floor per plan. | $100,000 |
| Aug 13, 2014 | Completed final sign-off Dec 2014 | 75 Valdez Av | remodel kitchen on 2/f, repair drywall on 2/f for electrical work, patch back in-kind.Details
remodel kitchen on 2/f, repair drywall on 2/f for electrical work, patch back in-kind. | $15,000 |