Back to bathroom remodel contractors
De Star Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Mar 2022
- Last 24 months
- 0 permits filed
33 permits since 2000: 33 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 20 completed. Typically 31 days from filing to permit and 257 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2021 | Completed final sign-off Jul 2022 | 3200 Judah St | interior remodel for duplex. both units, remove abandoned elevator. 2nd floor unit provide new bath, 2nd floor unit convert dinig to new bedroom. 2nd floor unit: convert living to nw living /dining. 2nd floor unit, remodel kitchen by removing bearing wall. 3rd floor unit: provide nw closet.Details
interior remodel for duplex. both units, remove abandoned elevator. 2nd floor unit provide new bath, 2nd floor unit convert dinig to new bedroom. 2nd floor unit: convert living to nw living /dining. 2nd floor unit, remodel kitchen by removing bearing wall. 3rd floor unit: provide nw closet. | $15,000 |
| Oct 18, 2021 | Completed final sign-off Jul 2022 | 3200 Judah St | remodel one kitchen and one bathroom on the 2nd floor. no changes to windows. no moving walls or new walls. repair the stucco of the exterior wall at front in kind.Details
remodel one kitchen and one bathroom on the 2nd floor. no changes to windows. no moving walls or new walls. repair the stucco of the exterior wall at front in kind. | $15,000 |
| May 16, 2017 | Completed final sign-off Mar 2018 | 1427 Felton St | provide one story in fill 204 sqft below extg 2nd floor overhang at rear. provide 2 new bedrooms, one new family room and one new bath at ground floor. 720 sq ft mew conditioned space.Details
provide one story in fill 204 sqft below extg 2nd floor overhang at rear. provide 2 new bedrooms, one new family room and one new bath at ground floor. 720 sq ft mew conditioned space. | $60,000 |
| Apr 24, 2017 | Completed final sign-off Jan 2018 | 1231 30th Av | add 3 bedrooms, 1 family room, 2 full bathroom & laundry on existing g/f, add 1 full bathroom and remodel existing kitchen on 2/fDetails
add 3 bedrooms, 1 family room, 2 full bathroom & laundry on existing g/f, add 1 full bathroom and remodel existing kitchen on 2/f | $110,000 |
| Jul 18, 2016 | Completed final sign-off Apr 2017 | 138 Lower Tr | replace existing aluminum windows with new aluminum insulated windows (4) visible from street. re-frame four rear windows to sliding glass doors with 42-inch guard rails. remodel 2/3rd fl bath with expsansion into lightwell. replace kitchen cabinetsDetails
replace existing aluminum windows with new aluminum insulated windows (4) visible from street. re-frame four rear windows to sliding glass doors with 42-inch guard rails. remodel 2/3rd fl bath with expsansion into lightwell. replace kitchen cabinets | $82,000 |
| Jun 8, 2016 | Completed final sign-off Apr 2017 | 1383 Church St | bathroom remodels on 2nd and 3rd floor. n/a for maher.Details
bathroom remodels on 2nd and 3rd floor. n/a for maher. | $60,000 |
| Nov 12, 2015 | Completed final sign-off May 2018 | 463 Sunrise Wy | legalize as-built unit (#1) on 1st floor per plan. (2) bedrooms, (1) bathroom, kitchen.Details
legalize as-built unit (#1) on 1st floor per plan. (2) bedrooms, (1) bathroom, kitchen. | $6,000 |
| Nov 6, 2015 | Completed final sign-off Mar 2017 | 2243 42nd Av | 1st floor: add 2 bedrooms and 2 bathrooms. 2nd floor:remodel kitchen and 1 bathroom, add 1 bathroom, and cover open stairs to create interior staircase. new patio and demolish shed at rear.Details
1st floor: add 2 bedrooms and 2 bathrooms. 2nd floor:remodel kitchen and 1 bathroom, add 1 bathroom, and cover open stairs to create interior staircase. new patio and demolish shed at rear. | $60,000 |
| Oct 14, 2015 | Completed final sign-off Mar 2017 | 463 Sunrise Wy | 1)relocate extg bedroom and living room in 2nd floor per plan. 2)kitchen remodel on 2nd floor per plan. 3)add one full bath on 2nd floor per plan. 4)add deck at rear per plan.Details
1)relocate extg bedroom and living room in 2nd floor per plan. 2)kitchen remodel on 2nd floor per plan. 3)add one full bath on 2nd floor per plan. 4)add deck at rear per plan. | $30,000 |
| Aug 28, 2015 | Completed final sign-off Mar 2017 | 1059 Portola Dr | revision to pa 2014-1022-9645 ground floor: add 1 study room & wet bar; relocated (e) furnace & (e) water per plan; relocate m bath, enlarge ath with sauna & hot tub; resize storage, exterior stairs repair in kind; add 240 volt outlets at garage & bath; main floor: relocate fire place; relocateDetails
revision to pa 2014-1022-9645 ground floor: add 1 study room & wet bar; relocated (e) furnace & (e) water per plan; relocate m bath, enlarge ath with sauna & hot tub; resize storage, exterior stairs repair in kind; add 240 volt outlets at garage & bath; main floor: relocate fire place; relocate | $5,000 |
| Feb 25, 2015 | Completed final sign-off Mar 2017 | 1059 Portola Dr | relocate master bath, enlarge ground floor, turn bedroom into storage, add one study room & one wet bar, relocate fire place, fridge, add new recessed light, add new retaining wall, bpa 201410229645.Details
relocate master bath, enlarge ground floor, turn bedroom into storage, add one study room & one wet bar, relocate fire place, fridge, add new recessed light, add new retaining wall, bpa 201410229645. | $40,000 |
| Feb 11, 2015 | Completed final sign-off Dec 2015 | 227 Farallones St | rear bldg - relocate powder room & kitchen on 1st floor & enlarge bedroom, add partition wall & bathroom remodel on 2nd floor in accessory bldg per plan.Details
rear bldg - relocate powder room & kitchen on 1st floor & enlarge bedroom, add partition wall & bathroom remodel on 2nd floor in accessory bldg per plan. | $40,000 |
| Dec 22, 2014 | Completed final sign-off Aug 2015 | 634 43rd Av | interior remodel. add 1 bedroom, 1 sun room, 1 family room, 1 game room and 2 baths at garage level. no expansion to building envelope.Details
interior remodel. add 1 bedroom, 1 sun room, 1 family room, 1 game room and 2 baths at garage level. no expansion to building envelope. | $60,000 |
| Nov 24, 2014 | Completed final sign-off Jul 2015 | 763 32nd Av | revision to approved p.a. #2014.0818.4031. revise kitchen remodel, layout, revise new bathroom layout on 2nd floor.Details
revision to approved p.a. #2014.0818.4031. revise kitchen remodel, layout, revise new bathroom layout on 2nd floor. | $1,000 |
| Oct 22, 2014 | Completed final sign-off Mar 2017 | 1059 Portola Dr | add 2 bedrooms, 2 baths & one mud room on 1st flr, add one bathroom, one powder, one skyline on 2nd floor per plan, (e) kitchen & (e) bathroom remodel on 2nd flr per plan.Details
add 2 bedrooms, 2 baths & one mud room on 1st flr, add one bathroom, one powder, one skyline on 2nd floor per plan, (e) kitchen & (e) bathroom remodel on 2nd flr per plan. | $50,000 |
| Aug 20, 2014 | Completed final sign-off Dec 2014 | 75 Valdez Av | remodel (e) bathroom. provide (n) half bath. all work to be on 2nd floor. no structural work.Details
remodel (e) bathroom. provide (n) half bath. all work to be on 2nd floor. no structural work. | $18,000 |
| Aug 18, 2014 | Completed final sign-off Jul 2015 | 763 32nd Av | to add two bedroom, one family room, two full bathrooms & laundry /hall on existing ground floor per plan. to add one full bathroom & remodel existing kitchen, bathroom on 2nd floor per plan.Details
to add two bedroom, one family room, two full bathrooms & laundry /hall on existing ground floor per plan. to add one full bathroom & remodel existing kitchen, bathroom on 2nd floor per plan. | $100,000 |
| Jun 30, 2014 | Completed final sign-off Jul 2015 | 281 Oxford St | add new family room, bedroom, bath and storage room at ground floor. now work on second floor. no structural workDetails
add new family room, bedroom, bath and storage room at ground floor. now work on second floor. no structural work | $35,000 |
| Sep 4, 2013 | Completed final sign-off Apr 2014 | 31 Cuvier St | remodel rooms down for 33 cuvier, provide new interior stairs for open spatial connection. provide 2 new full bathrooms, new bedroom, new family room & storage.Details
remodel rooms down for 33 cuvier, provide new interior stairs for open spatial connection. provide 2 new full bathrooms, new bedroom, new family room & storage. | $50,000 |
| Sep 4, 2013 | Completed final sign-off Jan 2015 | 75 Valdez Av | provide rooms down. add 2 bedrooms, 2 baths, family room, storage room. no work on 2nd flDetails
provide rooms down. add 2 bedrooms, 2 baths, family room, storage room. no work on 2nd fl | $70,000 |