De Star Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Mar 2022
- Last 24 months
- 0 permits filed
33 permits since 2000: 33 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 13 days from filing to permit and 195 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2016 | Completed final sign-off Apr 2017 | 138 Lower Tr | infill 2nd & 3rd flr south kitchen wall and new wall btwn dining rm & living rm to create new 4th bedrm remove f.p. remove kitchen west wall and create new peninsula counter. relocate w/d from garage into units. new stair from 3rd flr to roof. new roof deck via roof hatchDetails
infill 2nd & 3rd flr south kitchen wall and new wall btwn dining rm & living rm to create new 4th bedrm remove f.p. remove kitchen west wall and create new peninsula counter. relocate w/d from garage into units. new stair from 3rd flr to roof. new roof deck via roof hatch | $65,000 |
| Nov 6, 2015 | Completed final sign-off Mar 2017 | 2243 42nd Av | 1st floor: add 2 bedrooms and 2 bathrooms. 2nd floor:remodel kitchen and 1 bathroom, add 1 bathroom, and cover open stairs to create interior staircase. new patio and demolish shed at rear.Details
1st floor: add 2 bedrooms and 2 bathrooms. 2nd floor:remodel kitchen and 1 bathroom, add 1 bathroom, and cover open stairs to create interior staircase. new patio and demolish shed at rear. | $60,000 |
| Aug 28, 2015 | Completed final sign-off Mar 2017 | 1059 Portola Dr | revision to pa 2014-1022-9645 ground floor: add 1 study room & wet bar; relocated (e) furnace & (e) water per plan; relocate m bath, enlarge ath with sauna & hot tub; resize storage, exterior stairs repair in kind; add 240 volt outlets at garage & bath; main floor: relocate fire place; relocateDetails
revision to pa 2014-1022-9645 ground floor: add 1 study room & wet bar; relocated (e) furnace & (e) water per plan; relocate m bath, enlarge ath with sauna & hot tub; resize storage, exterior stairs repair in kind; add 240 volt outlets at garage & bath; main floor: relocate fire place; relocate | $5,000 |
| Sep 4, 2013 | Completed final sign-off Apr 2014 | 31 Cuvier St | remodel rooms down for 33 cuvier, provide new interior stairs for open spatial connection. provide 2 new full bathrooms, new bedroom, new family room & storage.Details
remodel rooms down for 33 cuvier, provide new interior stairs for open spatial connection. provide 2 new full bathrooms, new bedroom, new family room & storage. | $50,000 |
| Aug 28, 2013 | Completed final sign-off Apr 2014 | 31 Cuvier St | rebuild entry dry rotted wood front staris, reduce width of stairs to have 3ft minimum or width. new stairs to have code complying risers & treadsDetails
rebuild entry dry rotted wood front staris, reduce width of stairs to have 3ft minimum or width. new stairs to have code complying risers & treads | $8,000 |