Block 3919, lot 004
192 Utah St
- City’s use
- Industrial
- Built
- 1928
- Stories
- 6
- Units
- 6
- Rooms
- 8 bathrooms
- Building
- 75,575 sq ft
- Lot
- 20,891 sq ft
- Zoning
- PDR1D
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 24, 2023 | In progress issued Feb 2024 | 192 Utah St | Rod Heisler Construction | revision for electrical review missed under pa # 202011048189 & 202011048183.Details
revision for electrical review missed under pa # 202011048189 & 202011048183. | |
| Aug 22, 2023 | Never finaled issued Oct 2023, no final | 192 Utah St | Rod Heisler Construction | revision to bpa#202209092150 for modifications to concrete drag beamsDetails
revision to bpa#202209092150 for modifications to concrete drag beams | |
| Dec 22, 2022 | Completed final sign-off May 2024 | 199 Potrero Av | Granite Excavation & Demolition Inc | temporary shoring along perimeter for new developmentDetails
temporary shoring along perimeter for new development | $100,000 |
| Dec 5, 2022 | Never finaled issued Aug 2023, no final | 192 Utah St | Rod Heisler Construction | deferred submittal for fiber reinforced polymer (frp) as shown on the approved seismic strengthening drawings (bpa# 202209092150)Details
deferred submittal for fiber reinforced polymer (frp) as shown on the approved seismic strengthening drawings (bpa# 202209092150) | $500,000 |
| Sep 29, 2022 | Never finaled issued Oct 2022, no final | 151 Potrero Av | Rod Heisler Construction | patrial demo of a one story plus mezzanine wood framed structure known as area b (199 potrero av) including roof, walls & supporting foundations. site preparation for expansion of (e) adjacent area a (151 potrero) and a new accessible entrance in area a.Details
patrial demo of a one story plus mezzanine wood framed structure known as area b (199 potrero av) including roof, walls & supporting foundations. site preparation for expansion of (e) adjacent area a (151 potrero) and a new accessible entrance in area a. | $50,000 |
| Sep 9, 2022 | Never finaled issued Oct 2022, no final | 192 Utah St | Rod Heisler Construction | building 2, interior structural strenthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert (e) freight elevator in area e to passenger elevator. application travel with pa#: 202011189185Details
building 2, interior structural strenthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert (e) freight elevator in area e to passenger elevator. application travel with pa#: 202011189185 | |
| Jan 31, 2022 | Never finaled issued Jan 2022, no final | 192 Utah St | Rod Heisler Construction | concrete chipping for scanning of existing columns and beams. removal of non-structural masonry to expose concrete for material scanning. no structural work.Details
concrete chipping for scanning of existing columns and beams. removal of non-structural masonry to expose concrete for material scanning. no structural work. | $10,000 |
| Nov 22, 2021 | Expired or cancelled cancelled Sep 2024 | 151 Potrero Av | Rod Heisler Construction | demolition of a portion of a non-historic loading dock in building b (199 potrero/648 15th st). install pg&e transform on concrete pad. elecrical drawings showing the bus duct & electrical room layout shall follow as separate submittalDetails
demolition of a portion of a non-historic loading dock in building b (199 potrero/648 15th st). install pg&e transform on concrete pad. elecrical drawings showing the bus duct & electrical room layout shall follow as separate submittal | $95,000 |
| Nov 18, 2020 | Never finaled issued Oct 2022, no final | 151 Potrero Av | Rod Heisler Construction | building 1: interior structural strengthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert (e) freight elevator in area e into a passenger elevator.Details
building 1: interior structural strengthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert (e) freight elevator in area e into a passenger elevator. | $2,405,793 |
| Nov 4, 2020 | In progress issued Oct 2023 | 151 Potrero Av | Rod Heisler Construction | renovation & expansion of existing building 2 (identified on plans as area c, e & lobb) on parcel 004.Details
renovation & expansion of existing building 2 (identified on plans as area c, e & lobb) on parcel 004. | $4,470,112 |
| Nov 4, 2020 | Expired or cancelled withdrawn Sep 2022 | 199 Potrero Av | Rod Heisler Construction | demolition of structure (area b - 199 potrero st/648 15th st) to accomodate expansion of adjacent area a (151 portero ave).Details
demolition of structure (area b - 199 potrero st/648 15th st) to accomodate expansion of adjacent area a (151 portero ave). | $50,000 |
| Nov 4, 2020 | In progress issued Oct 2023 | 151 Potrero Av | Rod Heisler Construction | renovation & expansion of existing building 1 (identified as area a and b) on parcel 004.Details
renovation & expansion of existing building 1 (identified as area a and b) on parcel 004. | $3,796,489 |
| Oct 9, 2020 | Expired or cancelled withdrawn Jun 2021 | 151 Potrero Av | Rod Heisler Construction | demo of portion of non-historic loading dock in building b ( 199 potrero / 648 15th st ). installation of a pge transformer on a concrete pad. electrical drawings showing the bus duct and electrical room layout shall follow as a separate submittal.Details
demo of portion of non-historic loading dock in building b ( 199 potrero / 648 15th st ). installation of a pge transformer on a concrete pad. electrical drawings showing the bus duct and electrical room layout shall follow as a separate submittal. | $95,000 |
| Sep 4, 2020 | Never finaled issued Sep 2020, no final | 151 Potrero Av | Bay Alarm Company | new dedicated function sprinker monitoring system. sprinkler pa# 201403281971Details
new dedicated function sprinker monitoring system. sprinkler pa# 201403281971 | $12,300 |
| Jan 18, 2019 | Expired or cancelled withdrawn Jun 2020 | 151 Potrero Av | change of use. change to arts activities, retail sales and services accessory use for gallery ar sales 576 sq ft and community facility privateDetails
change of use. change to arts activities, retail sales and services accessory use for gallery ar sales 576 sq ft and community facility private | ||
| Mar 28, 2014 | Never finaled issued Apr 2014, no final | 151 Potrero Av | Aura Fire Safety Inc | add (14) sprinklers to (e) sprinkler system. ref app#201402067956;Details
add (14) sprinklers to (e) sprinkler system. ref app#201402067956; | $5,800 |
| Feb 6, 2014 | Never finaled issued Feb 2014, no final | 151 Potrero Av | Michael Clarke Construction | construct new 5' wide mezzanine for artists and upgrade electrical and introdue heating into spaces. upgrade ada compliance with new front entry door, ada closing hardware and push button at exterior. n/a for maher ordinance ~kf21&~kf21&-133Details
construct new 5' wide mezzanine for artists and upgrade electrical and introdue heating into spaces. upgrade ada compliance with new front entry door, ada closing hardware and push button at exterior. n/a for maher ordinance ~kf21&~kf21&-133 | $30,000 |
| Jan 20, 2011 | Never finaled issued Jan 2011, no final | 199 Potrero Av | street space and sidewalk permitsDetails
street space and sidewalk permits | ||
| Jul 3, 2009 | Never finaled issued Jul 2009, no final | 199 Potrero Av | street spaceDetails
street space | ||
| Jul 1, 2009 | Never finaled issued Jul 2009, no final | 199 Potrero Av | street space onlyDetails
street space only | ||
| Nov 30, 2004 | Never finaled issued Feb 2005, no final | 151 Potrero Av | Nabi Construction & Engineering Inc | revision to app#200302147580/revision to path of travelDetails
revision to app#200302147580/revision to path of travel | |
| Feb 14, 2003 | Completed final sign-off May 2005 | 151 Potrero Av | submittal to clear umb bldg ord for umb section w/seismic upgrade (umb retrofit)Details
submittal to clear umb bldg ord for umb section w/seismic upgrade (umb retrofit) | $75,000 | |
| Feb 14, 2003 | Expired or cancelled expired Oct 2003 | 151 Potrero Av | Central Roofing Co. | reroofingDetails
reroofing | $16,050 |
| Oct 26, 2000 | Completed final sign-off Jan 2001 | 151 Potrero Av | replace currect sign with painted or self adhesive vinyl advertising exhibits a & bDetails
replace currect sign with painted or self adhesive vinyl advertising exhibits a & b | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Rod Heisler Construction (12), Aura Fire Safety Inc, Bay Alarm Company, Central Roofing Co., Granite Excavation & Demolition Inc, Michael Clarke Construction, Nabi Construction & Engineering Inc
- Architects
- Marcy Wong (8), Matthew Yurus (2)
- Engineers
- Ety Benichou (5), Gregory P Luth (3), Andrew Meckler (2), Erwin O'toole, Scott Arnold
- Designers
- Robert Gerson
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.