Gregory P Luth
- Listed as
- engineer
- Firm
- Gegory P. Luth & Assoc. Inc
- Based in
- Santa Clara
- On San Francisco permits
- Aug 2020 to Nov 2020
5 permits since 2000 (engineer on 5 permits): 2 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 4, 2020 | In progress issued Oct 2023 | 151 Potrero Av | Rod Heisler Construction | renovation & expansion of existing building 1 (identified as area a and b) on parcel 004.Details
renovation & expansion of existing building 1 (identified as area a and b) on parcel 004. | $3,796,489 |
| Nov 4, 2020 | In progress issued Oct 2023 | 151 Potrero Av | Rod Heisler Construction | renovation & expansion of existing building 2 (identified on plans as area c, e & lobb) on parcel 004.Details
renovation & expansion of existing building 2 (identified on plans as area c, e & lobb) on parcel 004. | $4,470,112 |
| Oct 9, 2020 | Expired or cancelled withdrawn Jun 2021 | 151 Potrero Av | Rod Heisler Construction | demo of portion of non-historic loading dock in building b ( 199 potrero / 648 15th st ). installation of a pge transformer on a concrete pad. electrical drawings showing the bus duct and electrical room layout shall follow as a separate submittal.Details
demo of portion of non-historic loading dock in building b ( 199 potrero / 648 15th st ). installation of a pge transformer on a concrete pad. electrical drawings showing the bus duct and electrical room layout shall follow as a separate submittal. | $95,000 |
| Aug 26, 2020 | Completed final sign-off May 2022 | 198 Utah St | Rod Heisler Construction | core/shell improvements including: accessibility improvement including new accessible building entrey and toilet room. stair to mezznine and exit door, roof improvements, interior finishes.Details
core/shell improvements including: accessibility improvement including new accessible building entrey and toilet room. stair to mezznine and exit door, roof improvements, interior finishes. | $185,000 |
| Aug 17, 2020 | Completed final sign-off Apr 2022 | 198 Utah St | Rod Heisler Construction | seismic upgrade triggered by sfbc 403.12.1 & 2, removal of roofing and strengthening of roof deck, reconstruction and strengthening of the existing roof trusses, removal of existing mezzanines and replacement with new mezzanine, strengthening of existing masonry walls and associated foundation work.Details
seismic upgrade triggered by sfbc 403.12.1 & 2, removal of roofing and strengthening of roof deck, reconstruction and strengthening of the existing roof trusses, removal of existing mezzanines and replacement with new mezzanine, strengthening of existing masonry walls and associated foundation work. | $182,000 |