Cbs Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2011 to Oct 2026
- Last 24 months
- 27 permits filed
134 permits since 2000: 103 completed, 14 in progress, 12 never finaled, 5 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 134.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2026 | In progress issued Sep 2026 | 427 Precita Av | exterior only. new rear facing windows and doors and 2nd floor only. new skylights, and new parapets. in conjunction with interior work 202603248174Details
exterior only. new rear facing windows and doors and 2nd floor only. new skylights, and new parapets. in conjunction with interior work 202603248174 | $8,000 |
| Sep 18, 2026 | In progress issued Oct 2026 | 646 06th Av | consolidating (e) water closet and bathrooms on floors 1 and 2 to create 2 (n) primary ensuite bathrooms, 2 (n) primary walk in closets, (n) washer and ventless dryer on 2nd floor. (n) lighting in bathrooms and closets.Details
consolidating (e) water closet and bathrooms on floors 1 and 2 to create 2 (n) primary ensuite bathrooms, 2 (n) primary walk in closets, (n) washer and ventless dryer on 2nd floor. (n) lighting in bathrooms and closets. | $40,000 |
| Sep 17, 2026 | In progress issued Sep 2026 | 149 Buchanan St | remodel kitchen and bath. add 1 bathDetails
remodel kitchen and bath. add 1 bath | $60,000 |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 646 06th Av | interior remodel of duplex including: relocating (e) kitchen for each unit. creating 1 (n) full bathroom per uni. creating (n) office (n) sfpa 13d compliant sprinkler system throughout. (n) 400 amp electrical service & subDetails
interior remodel of duplex including: relocating (e) kitchen for each unit. creating 1 (n) full bathroom per uni. creating (n) office (n) sfpa 13d compliant sprinkler system throughout. (n) 400 amp electrical service & sub | $350,000 |
| Jul 31, 2026 | Completed final sign-off Sep 2026 | 39 Chenery St | install sheetrock and ceiling insulation in garage/ground floor.Details
install sheetrock and ceiling insulation in garage/ground floor. | $3,000 |
| Jul 15, 2026 | Completed final sign-off Sep 2026 | 39 Chenery St | (2) remodel bathrooms in kind at 2nd & 3rd floor. approximately 48sf each.Details
(2) remodel bathrooms in kind at 2nd & 3rd floor. approximately 48sf each. | $20,000 |
| Jul 14, 2026 | Completed final sign-off Sep 2026 | 39 Chenery St | 1st floor - add 1 media and 1 entertainment room. no exterior work.Details
1st floor - add 1 media and 1 entertainment room. no exterior work. | $12,000 |
| May 12, 2026 | In progress issued Sep 2026 | 427 Precita Av | Details
| $105,000 |
| Apr 8, 2026 | In progress filed Apr 2026, not yet issued | 2414 43rd Av | revision to pa# 201901170584 & 202511260566, adu sprinkler removal and occupancy change from r-2 to r-3, replacement gas utilities (furnace, water heater & range) with electric utilities).Details
revision to pa# 201901170584 & 202511260566, adu sprinkler removal and occupancy change from r-2 to r-3, replacement gas utilities (furnace, water heater & range) with electric utilities). | |
| Feb 20, 2026 | In progress issued Feb 2026 | 130 19th Av | 1st flr: relocate utilities. 2nd flr: reconfigure (e) kitchen, bedrooms and bathroom per layout. add (n)bedroom, laundry and powder room. 3rd flr: relocate kitchen, remodel (e) bedrooms and bathroom. and (h) office, laundry and bathroom.Details
1st flr: relocate utilities. 2nd flr: reconfigure (e) kitchen, bedrooms and bathroom per layout. add (n)bedroom, laundry and powder room. 3rd flr: relocate kitchen, remodel (e) bedrooms and bathroom. and (h) office, laundry and bathroom. | $125,000 |
| Feb 13, 2026 | In progress issued Jul 2026 | 843 14th St | remodel (e) full bath and add 1 full bath, close doorway between family and living room.Details
remodel (e) full bath and add 1 full bath, close doorway between family and living room. | $20,000 |
| Jan 15, 2026 | In progress issued Jun 2026 | 37 Cook St | fire damage repairs. fix hole on roof. replace interior finishes as needed. reset plubming fixtures, rewire top floor at area of fire. replace one wall standing furnace. work to be perform at units 37,39 and 39a.lower unit to have all floor repalacement.Details
fire damage repairs. fix hole on roof. replace interior finishes as needed. reset plubming fixtures, rewire top floor at area of fire. replace one wall standing furnace. work to be perform at units 37,39 and 39a.lower unit to have all floor repalacement. | $45,000 |
| Dec 10, 2025 | In progress issued Jan 2026 | 427 Precita Av | exterior remodel: new windows, doors, siding. infill under existing 2nd floor overhung. finish and condition space behind garage. full interior remodel over both levels. 4 bedrooms, 3.5 bath house.Details
exterior remodel: new windows, doors, siding. infill under existing 2nd floor overhung. finish and condition space behind garage. full interior remodel over both levels. 4 bedrooms, 3.5 bath house. | $435,000 |
| Nov 26, 2025 | In progress issued Feb 2026 | 2414 43rd Av | recommencement and completion of work approved under pa 201901170584Details
recommencement and completion of work approved under pa 201901170584 | $60,000 |
| Nov 18, 2025 | Completed final sign-off Aug 2026 | 359 31st Av | in kind kitchen (1) and bathroom (2). replace finishes, cabinets, fixtures and lighting at (e) locations. no structural or layout changes.Details
in kind kitchen (1) and bathroom (2). replace finishes, cabinets, fixtures and lighting at (e) locations. no structural or layout changes. | $25,000 |
| Nov 14, 2025 | Completed final sign-off Apr 2026 | 843 14th St | kitchen remodel 1 bath remodel in kind.Details
kitchen remodel 1 bath remodel in kind. | $30,000 |
| Nov 10, 2025 | In progress issued Nov 2025 | 761 Pine St | relocate kitchen, add bathrooms, add lights & outlets, convert dining room to bedroom w/bathrooms in each unit (761. 763 & 765 pine st).Details
relocate kitchen, add bathrooms, add lights & outlets, convert dining room to bedroom w/bathrooms in each unit (761. 763 & 765 pine st). | $250,000 |
| Oct 3, 2025 | Completed final sign-off Dec 2025 | 2066 19th Av | replace front 2nd level windows, 3rd level windows with vinyl windows. total of 14 windows. street visible.Details
replace front 2nd level windows, 3rd level windows with vinyl windows. total of 14 windows. street visible. | $8,000 |
| Jun 9, 2025 | In progress issued Aug 2025 | 10 Skyview Wy | renovation to single family dwelling at 1st floor, convert existing uncondition space to new family room, bedroom, bathroom, storage, wetbar. no excavation required. at 2nd floor, renovate bathrooms and kitchen.Details
renovation to single family dwelling at 1st floor, convert existing uncondition space to new family room, bedroom, bathroom, storage, wetbar. no excavation required. at 2nd floor, renovate bathrooms and kitchen. | $130,000 |
| Apr 29, 2025 | Completed final sign-off Oct 2025 | 148 Blake St | unit #1 - 1 kitchen and (2) baths remodelDetails
unit #1 - 1 kitchen and (2) baths remodel | $45,000 |
| Apr 29, 2025 | Completed final sign-off Apr 2026 | 1773 15th St | 1 kitchen and 1 bath remodel.Details
1 kitchen and 1 bath remodel. | $35,000 |
| Apr 25, 2025 | Completed final sign-off Jun 2026 | 1747 Broadway | interior remodel of e) condo unit. total bedrooms changing from 4 to 2. add 1 bath. minor reconfiguration of inteior walls & doors. remodel 1 kitchen, 1 full bath, & 1 half bath. replace all non st facing windowsDetails
interior remodel of e) condo unit. total bedrooms changing from 4 to 2. add 1 bath. minor reconfiguration of inteior walls & doors. remodel 1 kitchen, 1 full bath, & 1 half bath. replace all non st facing windows | $40,000 |
| Mar 25, 2025 | Completed final sign-off Oct 2025 | 527 Birch St | #529: kitchen remodel, add (n) full bath, office & great room #527: kitchen remodel, add (n) full bathDetails
#529: kitchen remodel, add (n) full bath, office & great room #527: kitchen remodel, add (n) full bath | $65,000 |
| Feb 28, 2025 | Completed final sign-off May 2025 | 156 Maddux Av | comply with nov #202431777 items 2 & 3. remove rear attached structure and legalize laundry. legalize adu under separate permitDetails
comply with nov #202431777 items 2 & 3. remove rear attached structure and legalize laundry. legalize adu under separate permit | $2,000 |
| Feb 21, 2025 | Completed final sign-off Feb 2026 | 355 Barneveld Av | comply w/ nov # 202432373, 202432372, 202432371: propose storage & restroom on mezzanine level. obtain electrical permit for new electrical conduit, junction box, and led lights per plan.Details
comply w/ nov # 202432373, 202432372, 202432371: propose storage & restroom on mezzanine level. obtain electrical permit for new electrical conduit, junction box, and led lights per plan. | $5,000 |
| Jan 17, 2025 | Completed final sign-off Aug 2026 | 507 29th Av | 1st floor (#507): remodel kitchen & bathroom. add 1 bedroom and 1 full bath. replace sheetrock and insultation throughout the unit.Details
1st floor (#507): remodel kitchen & bathroom. add 1 bedroom and 1 full bath. replace sheetrock and insultation throughout the unit. | $70,000 |
| Oct 24, 2024 | Completed final sign-off Jan 2025 | 837 Fillmore St | unit #1: remodel kitchen in-kind, ~70 sf.Details
unit #1: remodel kitchen in-kind, ~70 sf. | $18,000 |
| Aug 30, 2024 | Completed final sign-off Mar 2025 | 201 Holly Park Cr | revision to pa# 202303234301: 1/f - revise (2) windows. alum clad woodDetails
revision to pa# 202303234301: 1/f - revise (2) windows. alum clad wood | |
| Jul 9, 2024 | In progress issued Jan 2025 | 531 Bryant St | ste 150: first time t.i. cold shell commerical space convert use to limited restaurant. plumbing, electricals & hvac work. sink installation. acai bowl & smoothies use case. no cookingDetails
ste 150: first time t.i. cold shell commerical space convert use to limited restaurant. plumbing, electricals & hvac work. sink installation. acai bowl & smoothies use case. no cooking | $150,000 |
| Jun 11, 2024 | Completed final sign-off Oct 2024 | 88 King St | unit 1407: kitchen remodel - plumbing and electrical location remain. in kind.Details
unit 1407: kitchen remodel - plumbing and electrical location remain. in kind. | $20,000 |
| Jun 11, 2024 | Completed final sign-off Dec 2024 | 251 27th Av | unit 251: kitchen and 1 bathroom remodel in kind.Details
unit 251: kitchen and 1 bathroom remodel in kind. | $50,000 |
| Mar 22, 2024 | Completed final sign-off Apr 2025 | 505 29th Av | unit #505 remodel (e) kitchen & bathroom. add 1 bedroom, office & 1 full bath in (e) habitable spaceDetails
unit #505 remodel (e) kitchen & bathroom. add 1 bedroom, office & 1 full bath in (e) habitable space | $56,000 |
| Oct 20, 2023 | Completed final sign-off Aug 2024 | 3928 Cesar Chavez St | kitchen remodel on 2/f. new interior stair to connect 1/f and 2/f. convert storage room to family room on 1/f.Details
kitchen remodel on 2/f. new interior stair to connect 1/f and 2/f. convert storage room to family room on 1/f. | $28,000 |
| Sep 12, 2023 | Completed final sign-off Jul 2024 | 4039 19th Av | 1/f: add 1 bathroom, add w/d, 1-sink.Details
1/f: add 1 bathroom, add w/d, 1-sink. | $20,000 |
| Sep 7, 2023 | Completed final sign-off Mar 2024 | 2531 28th Av | revision to pa# 202102235175, structural revision to foundation to rear.Details
revision to pa# 202102235175, structural revision to foundation to rear. | $8,000 |
| Aug 18, 2023 | Completed final sign-off Aug 2023 | 194 Guerrero St | administrative process to document number of unit count for existing building resulting from records review and site verification for 3r report dispute. no proposed work under this permit.Details
administrative process to document number of unit count for existing building resulting from records review and site verification for 3r report dispute. no proposed work under this permit. | |
| Jun 21, 2023 | Completed final sign-off Jan 2024 | 570 Arlington St | one kitchen remodel. new cabinet, counter top. one upstair bath remodel. new tile, new vanity/top. new plumbing fixtures. all non structural.Details
one kitchen remodel. new cabinet, counter top. one upstair bath remodel. new tile, new vanity/top. new plumbing fixtures. all non structural. | $25,000 |
| Jun 16, 2023 | Completed final sign-off Oct 2023 | 45 Dellbrook Av | remodel (2) upstairs bathrooms in-kind. new plumbing fixtures, replace tiles, replace tub. replace shower pan. no structural work. no change to floor layout. no change to wall layout.Details
remodel (2) upstairs bathrooms in-kind. new plumbing fixtures, replace tiles, replace tub. replace shower pan. no structural work. no change to floor layout. no change to wall layout. | $15,000 |
| Jun 14, 2023 | Completed final sign-off Mar 2024 | 99 Yerba Buena Ln | tenant improvement, no change to mep, update conuntertops & cabinets, new paint touch-up, update new floor.Details
tenant improvement, no change to mep, update conuntertops & cabinets, new paint touch-up, update new floor. | $7,000 |
| May 18, 2023 | Completed final sign-off Feb 2024 | 148 Blake St | replace front (12) windows in kind w/ fiberglass.Details
replace front (12) windows in kind w/ fiberglass. | $4,000 |
| Apr 28, 2023 | Completed final sign-off Feb 2024 | 148 Blake St | repair dryrot at 2nd and 3rd floor balconies - 280 sf. in kind repair less than 50%Details
repair dryrot at 2nd and 3rd floor balconies - 280 sf. in kind repair less than 50% | $500 |
| Apr 13, 2023 | Completed final sign-off Feb 2024 | 148 Blake St | repair stucco in kind less than 50% (front of building, left side, about 850 sf)Details
repair stucco in kind less than 50% (front of building, left side, about 850 sf) | $5,000 |
| Apr 6, 2023 | Completed final sign-off Sep 2023 | 1835 Franklin St | guest bath replace floor tile and vanity- no layout change. master bath replace shower pan, tile, vanity and floor tile. no layout change. install new washer and dryerDetails
guest bath replace floor tile and vanity- no layout change. master bath replace shower pan, tile, vanity and floor tile. no layout change. install new washer and dryer | $20,000 |
| Mar 23, 2023 | Completed final sign-off Mar 2025 | 201 Holly Park Cr | 1/f: convert storage room to bedroom @ ground floor. 1 new window with aluminum clad wood.Details
1/f: convert storage room to bedroom @ ground floor. 1 new window with aluminum clad wood. | $1,500 |
| Mar 17, 2023 | Completed final sign-off Feb 2024 | 148 Blake St | apt 3: remodel one kitchen & 2 bathroom remodels. fixture location remain unchanged. non structuralDetails
apt 3: remodel one kitchen & 2 bathroom remodels. fixture location remain unchanged. non structural | $30,000 |
| Feb 7, 2023 | Completed final sign-off Sep 2023 | 502 14th St | to comply with accessible entrance program per ordinance 51-16, abe#201812313694Details
to comply with accessible entrance program per ordinance 51-16, abe#201812313694 | $5,500 |
| Dec 29, 2022 | Completed final sign-off Oct 2023 | 425 01st St | kitchen remodel in kind. no layout change. new cabinets, countertop. (2) bath remodels in kind. no layout change. new tile. shower valve, shower base, new tub. no wall removal. no structural work. maintain all accessibility requirements/features required at the time of building construction.Details
kitchen remodel in kind. no layout change. new cabinets, countertop. (2) bath remodels in kind. no layout change. new tile. shower valve, shower base, new tub. no wall removal. no structural work. maintain all accessibility requirements/features required at the time of building construction. | $35,000 |
| Nov 29, 2022 | Completed final sign-off Feb 2024 | 148 Blake St | unit #2: kitchen, 2 baths remodel. fixture location remains unchanged.Details
unit #2: kitchen, 2 baths remodel. fixture location remains unchanged. | $15,000 |
| Oct 28, 2022 | Completed final sign-off Jan 2023 | 201 Holly Park Cr | 1st fl convert half bath to full bath. ref to permit 202102084258Details
1st fl convert half bath to full bath. ref to permit 202102084258 | $8,000 |
| Oct 5, 2022 | Never finaled issued Mar 2023, no final | 1519 03rd St | renovate (e) new, previously unused tenant space intended for restaurant use w/a new restaurant, install sinks, electrical, plumbing & mechanical, provide (n) flooring, cove bases, (n) ceiling, (n) ada bath, (n) counter, (n) walls, install freezers + refrigerator & shelves.Details
renovate (e) new, previously unused tenant space intended for restaurant use w/a new restaurant, install sinks, electrical, plumbing & mechanical, provide (n) flooring, cove bases, (n) ceiling, (n) ada bath, (n) counter, (n) walls, install freezers + refrigerator & shelves. | $105,000 |
| Sep 12, 2022 | Completed final sign-off Oct 2025 | 194 Guerrero St | unit 1: kitchen & bathroom remodel, revise floor plan, work in this unit only.replacement of (e) & (s) elevation windows @ 3rd floor with aluminum clad wood windows (total 12)Details
unit 1: kitchen & bathroom remodel, revise floor plan, work in this unit only.replacement of (e) & (s) elevation windows @ 3rd floor with aluminum clad wood windows (total 12) | $35,000 |
| Aug 24, 2022 | Completed final sign-off Feb 2024 | 1367 Gilman Av | revision to bpa#201905201134.1st fl: reconfigure bathroom and add 1 full bath.Details
revision to bpa#201905201134.1st fl: reconfigure bathroom and add 1 full bath. | $15,000 |
| Aug 19, 2022 | Completed final sign-off Apr 2023 | 555 Fulton St | apt 526: kitchen remodel, 2 bathroms rmeodel. no layout changes. new cabinets & countertop., new vanity & sink.Details
apt 526: kitchen remodel, 2 bathroms rmeodel. no layout changes. new cabinets & countertop., new vanity & sink. | $30,000 |
| Aug 19, 2022 | Completed final sign-off May 2023 | 276 12th Av | upper unit 278: kitchen and bath remodel, replace new furnace. lower unit 276: bath remodel, replace new furnace. no removal of wallsDetails
upper unit 278: kitchen and bath remodel, replace new furnace. lower unit 276: bath remodel, replace new furnace. no removal of walls | $60,000 |
| Jul 13, 2022 | Completed final sign-off Jul 2023 | 1680 Oakdale Av | 1st fl - add 1 unit, 1 bedroom, kitchen and 1 full bathDetails
1st fl - add 1 unit, 1 bedroom, kitchen and 1 full bath | $48,000 |
| Jun 29, 2022 | Completed final sign-off Aug 2022 | 68 Diamond St | to obtain final inspection for work approved under pa# 202001081500. all work is complete.Details
to obtain final inspection for work approved under pa# 202001081500. all work is complete. | |
| Jun 21, 2022 | Completed final sign-off May 2025 | 626 Natoma St | revision to pa# 201908209289. reduction of sq.sf of additional adu. remove lightwell infill.Details
revision to pa# 201908209289. reduction of sq.sf of additional adu. remove lightwell infill. | |
| Dec 14, 2021 | Completed final sign-off Sep 2023 | 1758 18th Av | 2nd floor: kitchen & bath remodelDetails
2nd floor: kitchen & bath remodel | $45,000 |
| Dec 9, 2021 | Completed final sign-off Oct 2022 | 350 Arleta Av | remodel kitchen and bath, add 1 bedroomDetails
remodel kitchen and bath, add 1 bedroom | $20,000 |
| Oct 28, 2021 | Completed final sign-off Mar 2022 | 4150 17th St | 1 kitchen remodel, 2 bath remodel in kind- no layout change.Details
1 kitchen remodel, 2 bath remodel in kind- no layout change. | $30,000 |
| Oct 26, 2021 | Completed final sign-off Nov 2022 | 95 Laidley St | remodel 2 existing bedrooms. install new bath, new exterior doorDetails
remodel 2 existing bedrooms. install new bath, new exterior door | $30,000 |
| Aug 17, 2021 | Completed final sign-off Mar 2022 | 1967 32nd Av | 2nd floor one kitchen (100sf) and one bath (40sf) remodel in-kind; no wall removal; no layout changeDetails
2nd floor one kitchen (100sf) and one bath (40sf) remodel in-kind; no wall removal; no layout change | $15,000 |
| Jul 23, 2021 | Never finaled issued Jul 2021, no final | 68 Diamond St | rev to pa# 2021-0625-3224 replace (4) front aluminum windows wit (4) fiberglass windows (facing the street) administrative permit to document change of window materialDetails
rev to pa# 2021-0625-3224 replace (4) front aluminum windows wit (4) fiberglass windows (facing the street) administrative permit to document change of window material | $2,000 |
| Jun 25, 2021 | Never finaled issued Jun 2021, no final | 68 Diamond St | replace 4 front alumimum windows in kind. (facing the street)Details
replace 4 front alumimum windows in kind. (facing the street) | $2,500 |
| Jun 10, 2021 | Completed final sign-off Jun 2021 | 200 Pine St | renew permit to finzlize inspection & sign off on completed work indicated on original permit 201702240126Details
renew permit to finzlize inspection & sign off on completed work indicated on original permit 201702240126 | |
| May 11, 2021 | Completed final sign-off Jul 2021 | 1330 41st Av | new cabinets and countertopDetails
new cabinets and countertop | $13,000 |
| Mar 25, 2021 | Completed final sign-off May 2022 | 416 Linden St | unit #416: 1st fl. interior reconfigure per plan. add 1 bedroom and half bath.Details
unit #416: 1st fl. interior reconfigure per plan. add 1 bedroom and half bath. | $50,000 |
| Feb 23, 2021 | Completed final sign-off Mar 2024 | 2531 28th Av | 1st floor: reconfigure office & playroom. first floor horizontal addition with only 47 sf at rear of building.Details
1st floor: reconfigure office & playroom. first floor horizontal addition with only 47 sf at rear of building. | $85,000 |
| Dec 30, 2020 | Never finaled issued Dec 2020, no final | 158 Sagamore St | bathroom remodel - replace vanity sink, repair leaking sink, and faucet, replace toilet, shower door, tiles, and paint at 2nd fl.Details
bathroom remodel - replace vanity sink, repair leaking sink, and faucet, replace toilet, shower door, tiles, and paint at 2nd fl. | $15,000 |
| Jun 13, 2020 | Never finaled issued Oct 2020, no final | 41 Rosemont Pl | fire only. add sprinkler heads at windows in lieu of rated windows, pg&e box for (e) gas meters, only sprinkler ground floor. reference to approved bpa# 2017/0306/0745 for adu at ground floor.Details
fire only. add sprinkler heads at windows in lieu of rated windows, pg&e box for (e) gas meters, only sprinkler ground floor. reference to approved bpa# 2017/0306/0745 for adu at ground floor. | $100 |
| Jan 8, 2020 | Never finaled issued Jan 2020, no final | 68 Diamond St | recommencement and completion of work approved under pa201705116390Details
recommencement and completion of work approved under pa201705116390 | $30,000 |
| Sep 26, 2019 | Completed final sign-off Jan 2020 | 627 Silliman St | bath (5'x8') remodel - new tub, sink/vanity. replace three front windows with aluminum-clad wood windows in-kind - fixed in center flanked by two casements w/in existing openings. replace 2 rear windows with vinyl. no other work under this permit. windows: 1 dining room, 2 bedroomDetails
bath (5'x8') remodel - new tub, sink/vanity. replace three front windows with aluminum-clad wood windows in-kind - fixed in center flanked by two casements w/in existing openings. replace 2 rear windows with vinyl. no other work under this permit. windows: 1 dining room, 2 bedroom | $13,000 |
| Aug 20, 2019 | Completed final sign-off May 2025 | 626 Natoma St | adu being added @ ground flr garage per ord# 162-16. (e) ground flr unit is remodeled w/ (n) bath & kitchen. lightwell @ ground flr is filled in. garage is not a housing service ord 162-16Details
adu being added @ ground flr garage per ord# 162-16. (e) ground flr unit is remodeled w/ (n) bath & kitchen. lightwell @ ground flr is filled in. garage is not a housing service ord 162-16 | $150,000 |
| May 20, 2019 | Completed final sign-off Feb 2024 | 1367 Gilman Av | comply with complaint#201935411. 1st fl: add adu per ordinance 95-17. add 1 kitchen, living,storage. 2 beds and 1.5 bathDetails
comply with complaint#201935411. 1st fl: add adu per ordinance 95-17. add 1 kitchen, living,storage. 2 beds and 1.5 bath | $65,000 |
| Feb 14, 2019 | Completed final sign-off Aug 2023 | 626 Natoma St | mandatory seismic soft story retrofit to comply with 2016 sfebc ch 4d and ab107Details
mandatory seismic soft story retrofit to comply with 2016 sfebc ch 4d and ab107 | $50,000 |
| Jan 17, 2019 | Never finaled issued Jun 2022, no final | 2414 43rd Av | unit legalization ord 43-14. 523 sq ft living/dining, kitchen, bedroom & bathroom on 1/fl in (e) (2) units residence. fire sprinkler system to be provided on 1/fl under separate permit.Details
unit legalization ord 43-14. 523 sq ft living/dining, kitchen, bedroom & bathroom on 1/fl in (e) (2) units residence. fire sprinkler system to be provided on 1/fl under separate permit. | $60,000 |
| Dec 20, 2018 | Completed final sign-off Nov 2019 | 157 Bernard St | remodel kitchen and 1 bath, knock down wall at top floor, create den at middle floor w/ (n) full bath, create fam rm at lower floor, add stairs to connect middle and lower floorsDetails
remodel kitchen and 1 bath, knock down wall at top floor, create den at middle floor w/ (n) full bath, create fam rm at lower floor, add stairs to connect middle and lower floors | $80,000 |
| Nov 19, 2018 | Completed final sign-off Feb 2020 | 894 Steiner St | revision to bpa # 201801108277 to remodel bathroom ( per inspectros note ) with same location, install fan with termination 3 way from opening & property line 42ftDetails
revision to bpa # 201801108277 to remodel bathroom ( per inspectros note ) with same location, install fan with termination 3 way from opening & property line 42ft | |
| Oct 30, 2018 | Completed final sign-off Sep 2019 | 1615 Church St | first floor removel to include (n) bedroom, (n) bathroom, (n) den and (n) staircase to downstairsDetails
first floor removel to include (n) bedroom, (n) bathroom, (n) den and (n) staircase to downstairs | $50,000 |
| Oct 10, 2018 | Completed final sign-off Jan 2023 | 68 Diamond St | adding (3) adu to 1st floor per ordinance #162-16Details
adding (3) adu to 1st floor per ordinance #162-16 | $50,000 |
| Oct 4, 2018 | Completed final sign-off Dec 2018 | 68 Diamond St | to comply with nov# 201882231, applicant states no dryer booster fan needed , otherwise electrical permit required.Details
to comply with nov# 201882231, applicant states no dryer booster fan needed , otherwise electrical permit required. | $3,000 |
| Sep 21, 2018 | Completed final sign-off Apr 2019 | 999 Green St | apt 2403: remodel kitchen. remove 2 closets, remove non-structural walls. maher n/a.Details
apt 2403: remodel kitchen. remove 2 closets, remove non-structural walls. maher n/a. | $30,000 |
| Sep 5, 2018 | Never finaled issued Mar 2019, no final | 91 Central Av | add two 1 bedroom adu's on 1st fl. per ordiance #162-16Details
add two 1 bedroom adu's on 1st fl. per ordiance #162-16 | $168,000 |
| Jun 27, 2018 | Completed final sign-off Feb 2019 | 45 Dellbrook Av | kitchen upgrade, new cabinets, new countertopsDetails
kitchen upgrade, new cabinets, new countertops | $8,000 |
| Apr 16, 2018 | Completed final sign-off Jun 2019 | 627 Jackson St | add four guestrooms at basement. no change of bldg envelope and facade. provide throughout with an approved automatic sprinkler system under separated permit.Details
add four guestrooms at basement. no change of bldg envelope and facade. provide throughout with an approved automatic sprinkler system under separated permit. | $42,000 |
| Oct 23, 2017 | Never finaled issued Apr 2018, no final | 142 Cortland Av | rebuild front entry stairs and add three new bike parking spaces for new adu in the rear building. see pa#2016-1216-5233 for plansDetails
rebuild front entry stairs and add three new bike parking spaces for new adu in the rear building. see pa#2016-1216-5233 for plans | $3,000 |
| Oct 19, 2017 | Completed final sign-off Jun 2019 | 1126 Taylor St | add 2 bedrooms & one bathroom @ ground floor . add new stairway connect to unit #2. n/a maher ordinanceDetails
add 2 bedrooms & one bathroom @ ground floor . add new stairway connect to unit #2. n/a maher ordinance | $28,000 |
| Sep 13, 2017 | Completed final sign-off Jul 2019 | 785 San Jose Av | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $50,000 |
| Jul 20, 2017 | Completed final sign-off Aug 2022 | 142 Cortland Av | (n) 2-story addition. (3)(n) bedrooms, (2) baths, (1)(n) laundry room. add garage.Details
(n) 2-story addition. (3)(n) bedrooms, (2) baths, (1)(n) laundry room. add garage. | $186,000 |
| Jun 15, 2017 | Completed final sign-off Sep 2017 | 1430 Sloat Bl | remodel bathroom. new vanity top, new plumbing.Details
remodel bathroom. new vanity top, new plumbing. | $7,800 |
| Jun 6, 2017 | Completed final sign-off Jun 2017 | 4616 03rd St | to obtain final inspection for work approved under pa 201303212727. all work is complete.Details
to obtain final inspection for work approved under pa 201303212727. all work is complete. | |
| Jun 6, 2017 | Completed final sign-off Jun 2017 | 4614 03rd St | to obtain final inspection for work approved under pa #201310169347 & 201512145105. all work is complete.Details
to obtain final inspection for work approved under pa #201310169347 & 201512145105. all work is complete. | |
| May 11, 2017 | Never finaled issued Aug 2018, no final | 68 Diamond St | soft story upgrade 2011 iebc appendix a4Details
soft story upgrade 2011 iebc appendix a4 | $50,000 |
| Mar 21, 2017 | Completed final sign-off May 2018 | 355 01st St | new cabinet, countertop, sink, lighting; n/a maherDetails
new cabinet, countertop, sink, lighting; n/a maher | $18,000 |
| Mar 6, 2017 | Completed final sign-off Sep 2021 | 41 Rosemont Pl | adu: (n) dwelling unit being added at ground level to rear building under the adu program. (3) bedroom, (2 1/2) bath, per ord #162-16. sprinklers to nfpa-13 on separate submittal.Details
adu: (n) dwelling unit being added at ground level to rear building under the adu program. (3) bedroom, (2 1/2) bath, per ord #162-16. sprinklers to nfpa-13 on separate submittal. | $150,000 |
| Feb 24, 2017 | Expired or cancelled expired May 2021 | 200 Pine St | barrier removal for restaurant. cut off extg refrigerated food display such that adjacent steam table has an accessible path. no changes to mep. n/a maher.Details
barrier removal for restaurant. cut off extg refrigerated food display such that adjacent steam table has an accessible path. no changes to mep. n/a maher. | $500 |
| Feb 9, 2017 | Completed final sign-off Jul 2017 | 455 29th St | #101 - replace cabinet, countertop , new sink & faucet.Details
#101 - replace cabinet, countertop , new sink & faucet. | $10,000 |
| Dec 16, 2016 | Completed final sign-off Jul 2019 | 141 Santa Marina St | rear bldg. add unit per ordinance no. 162-16.Details
rear bldg. add unit per ordinance no. 162-16. | $130,000 |
| Dec 16, 2016 | Completed final sign-off Dec 2017 | 142 Cortland Av | legalize (e) rear unit at ground floor per ordinance no. 43-14Details
legalize (e) rear unit at ground floor per ordinance no. 43-14 | $15,000 |
| Nov 3, 2016 | Completed final sign-off Jan 2018 | 2065 Oak St | to comply with nov 201642421 -seismic upgrade per arch plan. maher naDetails
to comply with nov 201642421 -seismic upgrade per arch plan. maher na | $50,000 |