Permit GraphShortlistSan Francisco building permits since 2000

Block 3534, lot 014

194 Guerrero St

City’s use
Multi-Family Residential
Built
1924
Stories
3
Units
4
Rooms
6 bathrooms
Building
4,674 sq ft
Lot
3,432 sq ft
Zoning
NC1
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

27 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 22, 2025In progress
issued Sep 2025
194 Guerrero Stupgrade (e) west wall to 1 hour fire rated construction. replace windows and doors on west well with 1 hr fr units
Details
Permit
202507221367
Permit issued
Sep 23, 2025

upgrade (e) west wall to 1 hour fire rated construction. replace windows and doors on west well with 1 hr fr units

Open the permit page

$16,222
May 29, 2025In progress
filed May 2025, not yet issued
502 14th Stdemolition of existing 1-story, type 5b storage/ garage accessory structure in the rear yard. site permit under pa# 202408158748.
Details
Permit
202504285329

demolition of existing 1-story, type 5b storage/ garage accessory structure in the rear yard. site permit under pa# 202408158748.

Open the permit page

$5,160
May 15, 2025In progress
filed May 2025, not yet issued
198 Guerrero Streplacement of sub standard exterior grease ducting per plan replace by 16" x 16" 16 gauge minimum galvanized steel ducting per cbc 11b-202.4 exemption 7 - exempt project from access compliance.
Details
Permit
202505156527

replacement of sub standard exterior grease ducting per plan replace by 16" x 16" 16 gauge minimum galvanized steel ducting per cbc 11b-202.4 exemption 7 - exempt project from access compliance.

Open the permit page

$10,000
Mar 26, 2025Completed
final sign-off Oct 2025
194 Guerrero Strelocated previously approved (p/a 2022-0912-2284) floor beam from a fully "dropped" to a flush at the top condition.
Details
Permit
202503263110
Permit issued
Apr 2, 2025
Final sign-off
Oct 7, 2025

relocated previously approved (p/a 2022-0912-2284) floor beam from a fully "dropped" to a flush at the top condition.

Open the permit page

Dec 3, 2024In progress
filed Dec 2024, not yet issued
502 14th Sterect 4-story, type v-a, 2-family residential bldg, r3, no basement
Details
Permit
202408158748

erect 4-story, type v-a, 2-family residential bldg, r3, no basement

Open the permit page

$725,000
Aug 18, 2023Completed
final sign-off Aug 2023
194 Guerrero StCbs Construction Inc.administrative process to document number of unit count for existing building resulting from records review and site verification for 3r report dispute. no proposed work under this permit.
Details
Permit
202308184793
Permit issued
Aug 22, 2023
Final sign-off
Aug 24, 2023

administrative process to document number of unit count for existing building resulting from records review and site verification for 3r report dispute. no proposed work under this permit.

Open the permit page

Feb 7, 2023Completed
final sign-off Sep 2023
502 14th StAutomatic Door Systems,In, Cbs Construction Inc.to comply with accessible entrance program per ordinance 51-16, abe#201812313694
Details
Permit
202302071540
Permit issued
Mar 31, 2023
Final sign-off
Sep 29, 2023

to comply with accessible entrance program per ordinance 51-16, abe#201812313694

Open the permit page

$5,500
Oct 13, 2022Completed
final sign-off Aug 2025
198 Guerrero Stchange extg awning non electrical and non illuminated sign(mezze and mooore)
Details
Permit
202210134282
Permit issued
Oct 14, 2022
Final sign-off
Aug 25, 2025

change extg awning non electrical and non illuminated sign(mezze and mooore)

Open the permit page

$600
Sep 12, 2022Completed
final sign-off Oct 2025
194 Guerrero StCbs Construction Inc.unit 1: kitchen & bathroom remodel, revise floor plan, work in this unit only.replacement of (e) & (s) elevation windows @ 3rd floor with aluminum clad wood windows (total 12)
Details
Permit
202209122284
Permit issued
Jun 5, 2023
Final sign-off
Oct 7, 2025

unit 1: kitchen & bathroom remodel, revise floor plan, work in this unit only.replacement of (e) & (s) elevation windows @ 3rd floor with aluminum clad wood windows (total 12)

Open the permit page

$35,000
Dec 20, 2019Completed
final sign-off May 2020
194 Guerrero StHing Wah Construction Inccomply w/ his nov #201993081 & 201927064. general maintenance
Details
Permit
201912200179
Permit issued
Dec 20, 2019
Final sign-off
May 12, 2020

comply w/ his nov #201993081 & 201927064. general maintenance

Open the permit page

$1,000
Dec 17, 2019Never finaled
issued Dec 2019, no final
198 Guerrero Ststreet space
Details
Permit
M1176507
Permit issued
Dec 17, 2019

street space

Open the permit page

Dec 12, 2019Never finaled
issued Dec 2019, no final
194 Guerrero Ststreet space
Details
Permit
M1175128
Permit issued
Dec 12, 2019

street space

Open the permit page

Nov 14, 2019Expired or cancelled
withdrawn Jan 2020
194 Guerrero StHing Wah Construction Increv to pa# 201904178185; to comply with complaint 20993361; crating a means of egress rebuilding (e) stair
Details
Permit
201911147363

rev to pa# 201904178185; to comply with complaint 20993361; crating a means of egress rebuilding (e) stair

Open the permit page

Sep 18, 2019Completed
final sign-off May 2020
194 Guerrero StHing Wah Construction Increvision to bpa #201904178185. administrative permit to correct address: unit 1 =196. unit 2 = 194.
Details
Permit
201909181979
Permit issued
Sep 18, 2019
Final sign-off
May 12, 2020

revision to bpa #201904178185. administrative permit to correct address: unit 1 =196. unit 2 = 194.

Open the permit page

Apr 17, 2019Completed
final sign-off May 2020
198 Guerrero StHing Wah Construction Incinterior alt of 2 dwelling units in mixed-use building. 1st unit kitch & bath remodel, add 1 bath, (n)lndry, (n) hvac. 2nd unit kitch remodel, relocate bath, (n) wh. revise flr plans.replace revise(e) egress stair to minimum required code landings. no work to 3rd dwelling unit or 2 commercial units.
Details
Permit
201904178185
Permit issued
May 17, 2019
Final sign-off
May 15, 2020

interior alt of 2 dwelling units in mixed-use building. 1st unit kitch & bath remodel, add 1 bath, (n)lndry, (n) hvac. 2nd unit kitch remodel, relocate bath, (n) wh. revise flr plans.replace revise(e) egress stair to minimum required code landings. no work to 3rd dwelling unit or 2 commercial units.

Open the permit page

$100,000
Feb 14, 2019Never finaled
issued Feb 2019, no final
196 Guerrero StCoulthard Identity Group Inc Dba Amcoeinstall 1 illuminated double-faced projecting sing for "love shack"
Details
Permit
201902142969
Permit issued
Feb 22, 2019

install 1 illuminated double-faced projecting sing for "love shack"

Open the permit page

$4,750
Aug 31, 2018Completed
final sign-off Nov 2019
198 Guerrero Stto obtain a final inspection for work approved under pa# 201206203049
Details
Permit
201808318964
Permit issued
Aug 31, 2018
Final sign-off
Nov 14, 2019

to obtain a final inspection for work approved under pa# 201206203049

Open the permit page

Mar 28, 2018Completed
final sign-off Aug 2024
502 14th Stchange of use. change from medical cannabis dispensary to cannabis retail. ( no construction ) ref 2007-02-27-4993.
Details
Permit
201803284847
Permit issued
Aug 2, 2024
Final sign-off
Aug 21, 2024

change of use. change from medical cannabis dispensary to cannabis retail. ( no construction ) ref 2007-02-27-4993.

Open the permit page

Jun 20, 2012Expired or cancelled
expired Nov 2019
198 Guerrero StGreentree Design/Builddry-rot repair @ wall of kitchen by dishwasher 7ft. tall x 10ft. long. relocate plumbing line for 3-compartment sink/dishwasher. re-connected electrical for dishwasher @ (e) restaurant.
Details
Permit
201206203049
Permit issued
Jun 20, 2012

dry-rot repair @ wall of kitchen by dishwasher 7ft. tall x 10ft. long. relocate plumbing line for 3-compartment sink/dishwasher. re-connected electrical for dishwasher @ (e) restaurant.

Open the permit page

$1,000
Mar 29, 2007Completed
final sign-off Apr 2007
198 Guerrero StMazzy's Fire Specialists Sf Inchood & duct compression system as built
Details
Permit
200703297573
Permit issued
Mar 29, 2007
Final sign-off
Apr 2, 2007

hood & duct compression system as built

Open the permit page

Feb 27, 2007Completed
final sign-off Jun 2009
502 14th StSincere Construction Company Incchange in use to legalize medical cannobis dispensary. remodel rest room and front entrance to comly with title 24
Details
Permit
200702274993
Permit issued
Apr 1, 2009
Final sign-off
Jun 2, 2009

change in use to legalize medical cannobis dispensary. remodel rest room and front entrance to comly with title 24

Open the permit page

$14,000
Jan 4, 2007Never finaled
issued Jan 2007, no final
194 Guerrero StMazzy's Fire Specialists Sf Incupgrade (e) range guard, replace (e) nozzles, repipe if needed to comply with pipe rules for gal system.
Details
Permit
200701041001
Permit issued
Jan 4, 2007

upgrade (e) range guard, replace (e) nozzles, repipe if needed to comply with pipe rules for gal system.

Open the permit page

$3,500
Sep 18, 2006Never finaled
issued Sep 2006, no final
196 Guerrero Ststreet space and sidewalk permit
Details
Permit
M42211
Permit issued
Sep 18, 2006

street space and sidewalk permit

Open the permit page

Apr 26, 2006Never finaled
issued Apr 2006, no final
194 Guerrero Ststreetspace
Details
Permit
M37287
Permit issued
Apr 26, 2006

streetspace

Open the permit page

Mar 10, 2006Expired or cancelled
expired Mar 2010
194 Guerrero StCapron Constructionreplace in kind store front windows. correct dry rot posts between & provide positive connection to (e) post.
Details
Permit
200603106419
Permit issued
Mar 10, 2006

replace in kind store front windows. correct dry rot posts between & provide positive connection to (e) post.

Open the permit page

$4,500
Oct 25, 2005Expired or cancelled
cancelled Nov 2007
502 14th Strequesting anmorization for a change of use for the commercial space from a vacant retail space to a medical cannabis dispensary.new gate w/security grill in front of storefront.
Details
Permit
200510256517

requesting anmorization for a change of use for the commercial space from a vacant retail space to a medical cannabis dispensary.new gate w/security grill in front of storefront.

Open the permit page

Oct 6, 2005Never finaled
issued Oct 2005, no final
194 Guerrero Ststreet space & sidewalk.
Details
Permit
M34707
Permit issued
Oct 6, 2005

street space & sidewalk.

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Hing Wah Construction Inc (4), Cbs Construction Inc. (3), Mazzy's Fire Specialists Sf Inc (2), Automatic Door Systems,In, Capron Construction, Coulthard Identity Group Inc Dba Amcoe, Greentree Design/Build, Sincere Construction Company Inc
Architects
Tom Mcelroy (3), Harvey Hacker, Paul Haydu, Tom Mcelroy
Engineers
Jefferson Chen

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.