Hing Wah Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2003 to Jan 2022
- Last 24 months
- 0 permits filed
311 permits since 2000: 264 completed, 23 never finaled, 24 expired or cancelled.
Of the 23 never-finaled permits, 4 are 5 to 10 years old, 19 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 311.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 5, 2022 | Completed final sign-off Jan 2022 | 35 Hiliritas Av | revision to pa# 201908067977. remove laundry.Details
revision to pa# 201908067977. remove laundry. | |
| Nov 24, 2020 | Completed final sign-off Jul 2022 | 230 24th Av | new garage door in (e) opening. new entrydoor w/ new side lites w/ low-e, double glazing to replace failing (e) single glazed door and side lites. new doors will be the same size. add first floor fire barrier wall, door to create an elevator lobby.Details
new garage door in (e) opening. new entrydoor w/ new side lites w/ low-e, double glazing to replace failing (e) single glazed door and side lites. new doors will be the same size. add first floor fire barrier wall, door to create an elevator lobby. | $13,600 |
| Sep 4, 2020 | Completed final sign-off Jul 2021 | 565 Alvarado St | basement: convert storage space into den & add 1 full bath. 2nd fl: remodel 1 full bath & add 1 full bath.Details
basement: convert storage space into den & add 1 full bath. 2nd fl: remodel 1 full bath & add 1 full bath. | $30,000 |
| Aug 31, 2020 | Completed final sign-off Dec 2020 | 200 Brannan St | unit 308: remodel kitchen & 2 bathrooms. replace kitchen cabinets & countertop, replace laminate floors with new. no wall change.Details
unit 308: remodel kitchen & 2 bathrooms. replace kitchen cabinets & countertop, replace laminate floors with new. no wall change. | $40,000 |
| Jul 15, 2020 | Completed final sign-off Oct 2020 | 508 29th Av | rev to pa# 202001091542; interior modification and add half bathDetails
rev to pa# 202001091542; interior modification and add half bath | $2,000 |
| Feb 20, 2020 | Completed final sign-off Oct 2020 | 508 29th Av | revise pa# 202001091542; revise structural framing to previous permitDetails
revise pa# 202001091542; revise structural framing to previous permit | |
| Feb 7, 2020 | Completed final sign-off Sep 2020 | 1851 Divisadero St | revision to pa 2019-0806-8088 remove non-applicable assesible entrance door detailsDetails
revision to pa 2019-0806-8088 remove non-applicable assesible entrance door details | |
| Feb 6, 2020 | Completed final sign-off Feb 2021 | 539 05th Av | structural revision 202001232639Details
structural revision 202001232639 | |
| Jan 23, 2020 | Completed final sign-off Feb 2021 | 539 05th Av | provide temporary shoring system to faciliate excavation & construction of the proposed new sfd per approved pa 2018-0827-9397 s1Details
provide temporary shoring system to faciliate excavation & construction of the proposed new sfd per approved pa 2018-0827-9397 s1 | $5,000 |
| Jan 9, 2020 | Completed final sign-off Oct 2020 | 508 29th Av | 2nd fl - unit 508 remodel bedrooms, kitchen and bathroom. add 1 bedroomDetails
2nd fl - unit 508 remodel bedrooms, kitchen and bathroom. add 1 bedroom | $50,000 |
| Dec 20, 2019 | Completed final sign-off May 2020 | 194 Guerrero St | comply w/ his nov #201993081 & 201927064. general maintenanceDetails
comply w/ his nov #201993081 & 201927064. general maintenance | $1,000 |
| Dec 5, 2019 | Completed final sign-off Aug 2020 | 651 04th Av | administrative permit to correct error in bpa 201801168737 as listed which listed 3 stories proposed instead of 4 stories proposed.Details
administrative permit to correct error in bpa 201801168737 as listed which listed 3 stories proposed instead of 4 stories proposed. | |
| Nov 14, 2019 | Expired or cancelled withdrawn Jan 2020 | 194 Guerrero St | rev to pa# 201904178185; to comply with complaint 20993361; crating a means of egress rebuilding (e) stairDetails
rev to pa# 201904178185; to comply with complaint 20993361; crating a means of egress rebuilding (e) stair | |
| Oct 31, 2019 | Completed final sign-off Sep 2020 | 1851 Divisadero St | revision to pa 2019-0806-8088 (soft story) new wall footing @ rear wall for plywood wallDetails
revision to pa 2019-0806-8088 (soft story) new wall footing @ rear wall for plywood wall | |
| Oct 24, 2019 | Never finaled issued Oct 2019, no final | 539 05th Av | street spaceDetails
street space | |
| Oct 11, 2019 | Completed final sign-off Jan 2021 | 230 24th Av | new brick facade on ground floor (west elevation) to include framed openings for the garage & front door entry in response to enforcement action 2019-01451enf. related to pa# 2019/04/30/9351. ** maher: n/a **Details
new brick facade on ground floor (west elevation) to include framed openings for the garage & front door entry in response to enforcement action 2019-01451enf. related to pa# 2019/04/30/9351. ** maher: n/a ** | $13,000 |
| Oct 10, 2019 | Completed final sign-off Sep 2020 | 831 Brussels St | revisiont to pa 201909161762. 1st floor - add 1 bedroom, 1 full bath and family roomDetails
revisiont to pa 201909161762. 1st floor - add 1 bedroom, 1 full bath and family room | $60,000 |
| Sep 18, 2019 | Completed final sign-off May 2020 | 194 Guerrero St | revision to bpa #201904178185. administrative permit to correct address: unit 1 =196. unit 2 = 194.Details
revision to bpa #201904178185. administrative permit to correct address: unit 1 =196. unit 2 = 194. | |
| Sep 16, 2019 | Completed final sign-off Sep 2020 | 831 Brussels St | 2nd fl: remodel kitchen & bath. add 1 full bath. to comply with complaint #201984132.Details
2nd fl: remodel kitchen & bath. add 1 full bath. to comply with complaint #201984132. | $35,000 |
| Aug 30, 2019 | Completed final sign-off Sep 2019 | 750 Florida St | title 24 compliance: lighting for pa#201902082485. to comply to complaint 201969702.Details
title 24 compliance: lighting for pa#201902082485. to comply to complaint 201969702. | $100 |
| Aug 6, 2019 | Completed final sign-off Sep 2020 | 1853 Divisadero St | residential - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4. commercial soft story under pa 201908068088Details
residential - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4. commercial soft story under pa 201908068088 | $5,000 |
| Aug 6, 2019 | Completed final sign-off Jan 2022 | 35 Hiliritas Av | vertical addition. add 3/fl master complete interior remodel, reconfigure space, suite & deck & add 1 bedroom, 1 bath on ground floor.Details
vertical addition. add 3/fl master complete interior remodel, reconfigure space, suite & deck & add 1 bedroom, 1 bath on ground floor. | $230,000 |
| Aug 6, 2019 | Completed final sign-off Sep 2020 | 1851 Divisadero St | commercial - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4. residential soft story under pa 201908068087. install new entry door with powered door operator.Details
commercial - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4. residential soft story under pa 201908068087. install new entry door with powered door operator. | $25,000 |
| Aug 6, 2019 | Completed final sign-off Jan 2022 | 35 Hiliritas Av | add units per ord 95-17. coverting a portion of lower level into adu by closing off a wall, changing entrance to unit, adding kitchen & laundry.Details
add units per ord 95-17. coverting a portion of lower level into adu by closing off a wall, changing entrance to unit, adding kitchen & laundry. | $100,000 |
| Jun 27, 2019 | Completed final sign-off Sep 2019 | 750 Florida St | rev to pa# 201902082485; revise ada bathroom layout and remove skylights from building 'a' second floorDetails
rev to pa# 201902082485; revise ada bathroom layout and remove skylights from building 'a' second floor | |
| Jun 6, 2019 | Completed final sign-off Jun 2019 | 1770 Noe St | revise title 24 report to app#201703131328.Details
revise title 24 report to app#201703131328. | |
| May 28, 2019 | Completed final sign-off Nov 2019 | 2719 Franklin St | legalize front alterations: new windows, brick at ground floor and brick terra cotta @ roof line removedDetails
legalize front alterations: new windows, brick at ground floor and brick terra cotta @ roof line removed | $10,000 |
| May 9, 2019 | Never finaled issued May 2019, no final | 245 Scott St | street spaceDetails
street space | |
| Apr 30, 2019 | Completed final sign-off Jul 2022 | 230 24th Av | enclose an approved flat roofed exterior 4th level deck to include 1 new door & 1 new window. ** maher: n/a **Details
enclose an approved flat roofed exterior 4th level deck to include 1 new door & 1 new window. ** maher: n/a ** | $16,500 |
| Apr 23, 2019 | Completed final sign-off May 2019 | 336 Avila St | revision to bpa #201902062239. roof deck: change roof deck railing from glass to metal.Details
revision to bpa #201902062239. roof deck: change roof deck railing from glass to metal. | |
| Apr 22, 2019 | Completed final sign-off Apr 2019 | 131 Randolph St | revision to pa #201902284098. close door at rear (deck removed).Details
revision to pa #201902284098. close door at rear (deck removed). | |
| Apr 17, 2019 | Completed final sign-off May 2020 | 198 Guerrero St | interior alt of 2 dwelling units in mixed-use building. 1st unit kitch & bath remodel, add 1 bath, (n)lndry, (n) hvac. 2nd unit kitch remodel, relocate bath, (n) wh. revise flr plans.replace revise(e) egress stair to minimum required code landings. no work to 3rd dwelling unit or 2 commercial units.Details
interior alt of 2 dwelling units in mixed-use building. 1st unit kitch & bath remodel, add 1 bath, (n)lndry, (n) hvac. 2nd unit kitch remodel, relocate bath, (n) wh. revise flr plans.replace revise(e) egress stair to minimum required code landings. no work to 3rd dwelling unit or 2 commercial units. | $100,000 |
| Mar 5, 2019 | Completed final sign-off Mar 2019 | 3807 24th St | comply w/ n.o.v 201394021. remove atm machine.Details
comply w/ n.o.v 201394021. remove atm machine. | $5,000 |
| Mar 4, 2019 | Completed final sign-off Mar 2023 | 1501 35th Av | comply w/nov#201403742,20151131,201568031,201579371,201779961,201921601. remove illegal addition on 3rd and 4th fl. 1st fl:remove 2 baths, office, excercise rm. 2nd fl:remodel kitchen & bath, half bath. 3rd fl:remodel 2 baths and laundry. rebuild deck at rear permitted under bpa#8708678.(n)skylightsDetails
comply w/nov#201403742,20151131,201568031,201579371,201779961,201921601. remove illegal addition on 3rd and 4th fl. 1st fl:remove 2 baths, office, excercise rm. 2nd fl:remodel kitchen & bath, half bath. 3rd fl:remodel 2 baths and laundry. rebuild deck at rear permitted under bpa#8708678.(n)skylights | $20,000 |
| Feb 28, 2019 | Completed final sign-off Apr 2019 | 131 Randolph St | comply with nov 201916821 . remove existing rear deckDetails
comply with nov 201916821 . remove existing rear deck | $10,000 |
| Jan 11, 2019 | Completed final sign-off Sep 2019 | 2300 39th Av | 1st floor: add 2 bedrooms and 2 full baths.Details
1st floor: add 2 bedrooms and 2 full baths. | $80,000 |
| Jan 8, 2019 | Never finaled issued Jan 2019, no final | 130 10th St | street spaceDetails
street space | |
| Dec 20, 2018 | Completed final sign-off Jul 2020 | 1910 Funston Av | one story rear addition with roof deck. 1st fl: add 1 bedroom,1 bath, family room and laundry. 2nd floor:new roof deckDetails
one story rear addition with roof deck. 1st fl: add 1 bedroom,1 bath, family room and laundry. 2nd floor:new roof deck | $40,000 |
| Dec 7, 2018 | Completed final sign-off Aug 2019 | 245 Scott St | remodel 4 kitchen & 4 bathrooms fixtures at same location. no change of (e) floor plans.Details
remodel 4 kitchen & 4 bathrooms fixtures at same location. no change of (e) floor plans. | $80,000 |
| Nov 8, 2018 | Completed final sign-off Jan 2019 | 423 Lombard St | dry rot repair- side sidings and window sills. about 600sfDetails
dry rot repair- side sidings and window sills. about 600sf | $8,000 |
| Oct 16, 2018 | Completed final sign-off Jun 2019 | 91 Chattanooga St | revision to bpa #201703302829. revise window size in living room & bedroom. rearrange kitchen layout per plan. change main entrance steps direction per plan.Details
revision to bpa #201703302829. revise window size in living room & bedroom. rearrange kitchen layout per plan. change main entrance steps direction per plan. | |
| Oct 10, 2018 | Completed final sign-off Mar 2019 | 1432 Lake St | voluntary soft story seismic upgrade 2016 cebc appx a4Details
voluntary soft story seismic upgrade 2016 cebc appx a4 | $50,000 |
| Oct 4, 2018 | Completed final sign-off Mar 2019 | 130 10th St | ti work add ada bathroom on 1st flr and remove non load bearing partition wallsDetails
ti work add ada bathroom on 1st flr and remove non load bearing partition walls | $20,000 |
| Sep 11, 2018 | Expired or cancelled withdrawn Jul 2019 | 563 Alvarado St | revision to 20180221174 & 201612285969 change access from garage to interior space. reconfigure 3rd floor layout: bedroom & bathroom count remain the sameDetails
revision to 20180221174 & 201612285969 change access from garage to interior space. reconfigure 3rd floor layout: bedroom & bathroom count remain the same | $4,000 |
| Aug 28, 2018 | Completed final sign-off Oct 2019 | 1442 Funston Av | revision to pa #201710121053. update to deck layout and interior. space reconfiguration at level 2 & 3.Details
revision to pa #201710121053. update to deck layout and interior. space reconfiguration at level 2 & 3. | |
| Aug 27, 2018 | Completed final sign-off Feb 2021 | 539 05th Av | vertical & horizontal addition. interior & exterior remodel. replace alum windows with alum clad wood. add 1 unit @ ground level. rear addition. add 1 story, excavate lower level, 2 kitchens, 4 1/2 baths, roof terrace over rear addition.Details
vertical & horizontal addition. interior & exterior remodel. replace alum windows with alum clad wood. add 1 unit @ ground level. rear addition. add 1 story, excavate lower level, 2 kitchens, 4 1/2 baths, roof terrace over rear addition. | $850,000 |
| Jul 6, 2018 | Completed final sign-off Aug 2019 | 871 Treat Av | interior remodel of sfd - expansion below (e) living space at rear, 3 new dormers, new garden shed at rearDetails
interior remodel of sfd - expansion below (e) living space at rear, 3 new dormers, new garden shed at rear | $400,000 |
| Jun 8, 2018 | Never finaled issued May 2019, no final | 1358 12th Av | vertical addition. revision to 201505015177. reconfigure 3rd fl plan. convert attic at 3rd fl to (n) bedroom. replace gable roof @ front with hip roof.Details
vertical addition. revision to 201505015177. reconfigure 3rd fl plan. convert attic at 3rd fl to (n) bedroom. replace gable roof @ front with hip roof. | $20,000 |
| Jun 5, 2018 | Completed final sign-off Apr 2020 | 336 Avila St | revision to 201510260755; 2nd flr - reconfigure kitchen layout. 3rd flr - reconfigure bathroom, 4th flr - add new roof deck maher naDetails
revision to 201510260755; 2nd flr - reconfigure kitchen layout. 3rd flr - reconfigure bathroom, 4th flr - add new roof deck maher na | $5,000 |
| May 29, 2018 | Completed final sign-off Dec 2018 | 655 04th Av | replace (e) ftg witn (n) ftg along north property line wallDetails
replace (e) ftg witn (n) ftg along north property line wall | $10,000 |
| Feb 21, 2018 | Completed final sign-off Sep 2019 | 563 Alvarado St | revision to pa #201612285969. reconfigure approved layout for first floor. expand living space into previously approved storage and crawl space. provide new bedroom, bathroom spaces, lightwell. all work below grade, not visible from street.Details
revision to pa #201612285969. reconfigure approved layout for first floor. expand living space into previously approved storage and crawl space. provide new bedroom, bathroom spaces, lightwell. all work below grade, not visible from street. | $35,000 |
| Feb 12, 2018 | Completed final sign-off Apr 2018 | 3839 Folsom St | in-kind repair front stairs - less than 50%. no structural work.Details
in-kind repair front stairs - less than 50%. no structural work. | $2,500 |
| Feb 1, 2018 | Completed final sign-off Jul 2022 | 230 24th Av | in-fill north light well & ktichens (2) and bathrooms, add 3 new bathrooms, replace windows in facade, (n) stucco @ ground floor. (n) mep work as needed. 2 (n) bedroom & 1.5 baths @ ground floorDetails
in-fill north light well & ktichens (2) and bathrooms, add 3 new bathrooms, replace windows in facade, (n) stucco @ ground floor. (n) mep work as needed. 2 (n) bedroom & 1.5 baths @ ground floor | $440,000 |
| Jan 29, 2018 | Completed final sign-off Jul 2022 | 230 24th Av | horizontal ext @rear (east) occupying (2) sides yards max allowable distance of 12ft beyond 45% rear yard setback for (1) story. 2nd flr deck & stair to backyard. revisions to 4th flr including remodeled bathroom, (n) kitchen, additional living space, (n) roofdeck, (n) windows & (n) doors.Details
horizontal ext @rear (east) occupying (2) sides yards max allowable distance of 12ft beyond 45% rear yard setback for (1) story. 2nd flr deck & stair to backyard. revisions to 4th flr including remodeled bathroom, (n) kitchen, additional living space, (n) roofdeck, (n) windows & (n) doors. | $190,000 |
| Jan 16, 2018 | Completed final sign-off Aug 2020 | 651 04th Av | site permit to remove 3-story west building wing, add 142 sq ft of ground flr living space + (n) 2nd flr deck @ west end (horizontal addition).Details
site permit to remove 3-story west building wing, add 142 sq ft of ground flr living space + (n) 2nd flr deck @ west end (horizontal addition). | $65,000 |
| Jan 4, 2018 | Expired or cancelled expired Oct 2024 | 3932 26th St | remove all lath and plaster. resheetrock property line walls with 5/8" type x and fire tape. to comply with nov #201828951, 201829000, 201829304.Details
remove all lath and plaster. resheetrock property line walls with 5/8" type x and fire tape. to comply with nov #201828951, 201829000, 201829304. | $1,000 |
| Dec 15, 2017 | Expired or cancelled cancelled Mar 2018 | 3932 26th St | replace 110' foundationDetails
replace 110' foundation | $65,000 |
| Dec 8, 2017 | Completed final sign-off Aug 2020 | 651 04th Av | cantilever (e) bay window, (n) garage door and person door at 1st floor, (n) facade windows & siding, interior remodel - (n) 1st floor stair, remodeled bathroom, remodel kitchen & baths on 2nd & 3rd floors.Details
cantilever (e) bay window, (n) garage door and person door at 1st floor, (n) facade windows & siding, interior remodel - (n) 1st floor stair, remodeled bathroom, remodel kitchen & baths on 2nd & 3rd floors. | $325,000 |
| Nov 15, 2017 | Completed final sign-off Apr 2018 | 3839 Folsom St | remodel kitchen and 2 bathrooms, fixtures to remain in same location.Details
remodel kitchen and 2 bathrooms, fixtures to remain in same location. | $30,000 |
| Oct 12, 2017 | Completed final sign-off Oct 2019 | 1442 Funston Av | renovation of existing 2 unit bldg. expand lower unit into gr fl storage space. behind garage unit 1442 to be reconfigured as 2 bedrm, 3 bath. unit 1444 to be reconfigured as 4 bedrm,3 bath. new deck to grade at rear yard. less than 10' above gradeDetails
renovation of existing 2 unit bldg. expand lower unit into gr fl storage space. behind garage unit 1442 to be reconfigured as 2 bedrm, 3 bath. unit 1444 to be reconfigured as 4 bedrm,3 bath. new deck to grade at rear yard. less than 10' above grade | $150,000 |
| Sep 15, 2017 | Completed final sign-off Nov 2019 | 2351 Filbert St | soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4 | $30,000 |
| Sep 14, 2017 | Completed final sign-off Feb 2019 | 1034 Divisadero St | proposed seismic strenghtening to comply w/ san francisco soft story ordinance sfbc ch. 34b. all work with (e) boundary of bldg. 2016 cebc appendix a-4.Details
proposed seismic strenghtening to comply w/ san francisco soft story ordinance sfbc ch. 34b. all work with (e) boundary of bldg. 2016 cebc appendix a-4. | $150,000 |
| Sep 6, 2017 | Completed final sign-off Jun 2018 | 1275 04th Av | soft story retrofit sfbc ch 4d 2016 sfbc appendix a4Details
soft story retrofit sfbc ch 4d 2016 sfbc appendix a4 | $30,000 |
| Aug 22, 2017 | Completed final sign-off May 2018 | 2288 Sutter St | revision to pa #201705045730: remove side walls under bay window at garage front.Details
revision to pa #201705045730: remove side walls under bay window at garage front. | $500 |
| Jun 29, 2017 | Completed final sign-off Jan 2019 | 177 08th Av | rev. to pa#201508134130. 1/f- interior reconfiguration to include 1 bedroom, 1 study, 1 laundry, 1 bath & 1 media. 2/f & 3/f- interior room reconfiguration. new stairs at front of building. 2 new skylgihts on 3/fDetails
rev. to pa#201508134130. 1/f- interior reconfiguration to include 1 bedroom, 1 study, 1 laundry, 1 bath & 1 media. 2/f & 3/f- interior room reconfiguration. new stairs at front of building. 2 new skylgihts on 3/f | $5,000 |
| Jun 26, 2017 | Completed final sign-off Jul 2019 | 4639 California St | horizontal extension @ 1st fl under 2nd deck to create habitable living space. add (n) bathroom, bedroom, laundry closet & family room. (n) interior stair connecting 2nd & 1st floors. convert (e) 2nd fl bath to powder room. infill lightwell @ 2nd flDetails
horizontal extension @ 1st fl under 2nd deck to create habitable living space. add (n) bathroom, bedroom, laundry closet & family room. (n) interior stair connecting 2nd & 1st floors. convert (e) 2nd fl bath to powder room. infill lightwell @ 2nd fl | $77,000 |
| Jun 12, 2017 | Completed final sign-off Jun 2018 | 354 27th Av | revision to pa #2015-0420-4070. interior layout revisions, radiant heating replaced with gas furnaces, 1st flr lowered 1 foot. no change to maximum excavation depth, minor window configuration revisions - rear facade only.Details
revision to pa #2015-0420-4070. interior layout revisions, radiant heating replaced with gas furnaces, 1st flr lowered 1 foot. no change to maximum excavation depth, minor window configuration revisions - rear facade only. | |
| Jun 1, 2017 | Completed final sign-off Feb 2018 | 50 Valmar Tr | 1st fl: add 2 bedrooms, 2 full baths, and laundry room. 2nd fl: new skylight and replace windows, new deck at rear. front 2 windows to be replaced in-kind with aluminum clad wood.Details
1st fl: add 2 bedrooms, 2 full baths, and laundry room. 2nd fl: new skylight and replace windows, new deck at rear. front 2 windows to be replaced in-kind with aluminum clad wood. | $50,000 |
| May 26, 2017 | Completed final sign-off Nov 2017 | 2719 Franklin St | revision to app#201605096898. 1st floor: reconfigure approved patio. 2nd floor & 3rd floor: reconfigure kitchen and add (2)1/2 baths. roof deck: remove retractible skylight.Details
revision to app#201605096898. 1st floor: reconfigure approved patio. 2nd floor & 3rd floor: reconfigure kitchen and add (2)1/2 baths. roof deck: remove retractible skylight. | $20,000 |
| May 4, 2017 | Completed final sign-off May 2018 | 2288 Sutter St | 1st flr: new 1 car parking garage add 2 bedrooms, 1 family, 1 bath, laundry and interior stairs to connect 2nd flr: 2nd flr: remodel kitchen and bath and add 1 bath. 3rd flr: remodel kitchen and bath and add 1 bath & laundry.(sep unit)Details
1st flr: new 1 car parking garage add 2 bedrooms, 1 family, 1 bath, laundry and interior stairs to connect 2nd flr: 2nd flr: remodel kitchen and bath and add 1 bath. 3rd flr: remodel kitchen and bath and add 1 bath & laundry.(sep unit) | $120,000 |
| Apr 19, 2017 | Completed final sign-off Jun 2018 | 1559 07th Av | 2/f: remodel complete total floor and add 1 bathroom, reconfigure interior stairs. 1/f: unit legalization sep permit (ref 201704184284).Details
2/f: remodel complete total floor and add 1 bathroom, reconfigure interior stairs. 1/f: unit legalization sep permit (ref 201704184284). | $60,000 |
| Apr 18, 2017 | Completed final sign-off Jun 2018 | 1561 07th Av | comply w/nov #201635593 - legalize unauthorized dwelling unit on ground floor: 1 kitchen, 1.5 bathrooms, 2 bedrooms, 1 living/dining.Details
comply w/nov #201635593 - legalize unauthorized dwelling unit on ground floor: 1 kitchen, 1.5 bathrooms, 2 bedrooms, 1 living/dining. | $105,000 |
| Apr 5, 2017 | Completed final sign-off Aug 2017 | 176 Banks St | 2nd floor: remodel kitchen and bath.Details
2nd floor: remodel kitchen and bath. | $20,000 |
| Mar 20, 2017 | Completed final sign-off Jun 2017 | 138 08th Av | rev pa#201604285948: reconfigure kitchen on 2/f and rooms on 3/f per plans.Details
rev pa#201604285948: reconfigure kitchen on 2/f and rooms on 3/f per plans. | |
| Mar 13, 2017 | Completed final sign-off Jun 2019 | 1770 Noe St | adu per ord #162-16. proposed accessory dwelling unit added to a portion of the (e) basement area. propose foundation improvements to accomodate the adu were approved under a separate permit. the proposed adu is a (1)bedroom unit, including kitchen & a living space & patio.Details
adu per ord #162-16. proposed accessory dwelling unit added to a portion of the (e) basement area. propose foundation improvements to accomodate the adu were approved under a separate permit. the proposed adu is a (1)bedroom unit, including kitchen & a living space & patio. | $75,000 |
| Mar 1, 2017 | Completed final sign-off Mar 2017 | 917 Florida St | administrative permit to correct number of bathrooms under permit #2015-09-03-6019 on ground floor. approved plans shows 3 bathrooms.Details
administrative permit to correct number of bathrooms under permit #2015-09-03-6019 on ground floor. approved plans shows 3 bathrooms. | |
| Feb 7, 2017 | Completed final sign-off May 2017 | 724 Noe St | revision to pa 2016-0127-8152 - new fireplace on 2nd floorDetails
revision to pa 2016-0127-8152 - new fireplace on 2nd floor | |
| Jan 25, 2017 | Completed final sign-off Apr 2017 | 198 Cresta Vista Dr | revision to 201607112021: 1st fl reconfigure garage, relocate laundry, change office into bedroomDetails
revision to 201607112021: 1st fl reconfigure garage, relocate laundry, change office into bedroom | |
| Dec 28, 2016 | Completed final sign-off Sep 2019 | 563 Alvarado St | renovation & expansion to (e) single family home, rear addition raise roof line at (e) attic for additional habitable space, convert portion of (e) crawl space to havitable space & garage space. sprinkler 13r throughoutDetails
renovation & expansion to (e) single family home, rear addition raise roof line at (e) attic for additional habitable space, convert portion of (e) crawl space to havitable space & garage space. sprinkler 13r throughout | $475,000 |
| Dec 28, 2016 | Completed final sign-off Mar 2019 | 95 Laidley St | upgrade extg concrete foundation. partial replacement of bldg footings and slab at extg basement and porch. new beams and posts at basement & 1st floor.Details
upgrade extg concrete foundation. partial replacement of bldg footings and slab at extg basement and porch. new beams and posts at basement & 1st floor. | $80,000 |
| Dec 8, 2016 | Completed final sign-off May 2017 | 724 Noe St | in kind repair of approx. 100 sf of dry rot damage/stucco repair at front right hand side of driveway. stud replacement shall be limited to no more than 3 studs replacement in-kind. provide min. 1/2" plywood w/10d@6"o.c. at all edges where shtg. is removed & replaced.Details
in kind repair of approx. 100 sf of dry rot damage/stucco repair at front right hand side of driveway. stud replacement shall be limited to no more than 3 studs replacement in-kind. provide min. 1/2" plywood w/10d@6"o.c. at all edges where shtg. is removed & replaced. | $500 |
| Dec 6, 2016 | Completed final sign-off Dec 2016 | 2339 Bryant St | revision to pa 2015-0910-6629. new wet bar on 3rd floorDetails
revision to pa 2015-0910-6629. new wet bar on 3rd floor | $200 |
| Nov 22, 2016 | Completed final sign-off Nov 2017 | 423 Lombard St | comply w/ nov #201637513, remove illegal 6' tall separation on roof deckDetails
comply w/ nov #201637513, remove illegal 6' tall separation on roof deck | $100 |
| Nov 15, 2016 | Completed final sign-off Nov 2017 | 2719 Franklin St | revision to 201605096898. use pipe lines and removal of posts in garageDetails
revision to 201605096898. use pipe lines and removal of posts in garage | |
| Sep 16, 2016 | Completed final sign-off Jul 2017 | 159 07th Av | 1st flr: add 1 bedroom, 1 den and 2 full baths, new interior stairs to 2nd 2nd flr: total remodel, new cantilevered deck at rear 3rd flr: total remodel, add 1bath and laundry, new spiral stairs to roof roof: new roof deck, more than 25% walls remainDetails
1st flr: add 1 bedroom, 1 den and 2 full baths, new interior stairs to 2nd 2nd flr: total remodel, new cantilevered deck at rear 3rd flr: total remodel, add 1bath and laundry, new spiral stairs to roof roof: new roof deck, more than 25% walls remain | $380,000 |
| Jul 28, 2016 | Completed final sign-off Jan 2017 | 2740 Union St | unit #1- remodel kitchen and bathroom per plans.Details
unit #1- remodel kitchen and bathroom per plans. | $20,000 |
| Jul 11, 2016 | Completed final sign-off Apr 2017 | 198 Cresta Vista Dr | 1st fl add 1 office. close 1 garage door and convert to window at frontDetails
1st fl add 1 office. close 1 garage door and convert to window at front | $10,000 |
| Jun 14, 2016 | Completed final sign-off Apr 2017 | 198 Cresta Vista Dr | 1st flr: reconfigure rooms. 2nd flr: remove wall at kitchen. repair decks at rearDetails
1st flr: reconfigure rooms. 2nd flr: remove wall at kitchen. repair decks at rear | $30,000 |
| May 27, 2016 | Completed final sign-off Jan 2017 | 917 Florida St | comply with 201617371 and 201581471. revision to 201509036019, replace existing non compliant wall construction at 1st fl, exterior property line walls per plan. new walls, 1 hr rated.Details
comply with 201617371 and 201581471. revision to 201509036019, replace existing non compliant wall construction at 1st fl, exterior property line walls per plan. new walls, 1 hr rated. | |
| May 27, 2016 | Completed final sign-off Mar 2018 | 1914 Funston Av | new retaining wall on south side of rear yardDetails
new retaining wall on south side of rear yard | $10,000 |
| May 17, 2016 | Completed final sign-off May 2016 | 2695 22nd St | to obtain final inspection for work approved under pa#201501307143. all work is complete.Details
to obtain final inspection for work approved under pa#201501307143. all work is complete. | |
| May 9, 2016 | Completed final sign-off Nov 2017 | 2719 Franklin St | 1st flr: add 1bedroom, 1 bath, 1 family room , 1 laundry & new patio at rear. 2nd flr: remodel kitchen and bath. add 1 bath and 1 den. new interior stairs to 1st flr. 3rd flr: remodel kitchen and bath. add 1 bath, 1 office, 1 bedroom, 1 laundry and stair to new roof deck. more than 25% existingDetails
1st flr: add 1bedroom, 1 bath, 1 family room , 1 laundry & new patio at rear. 2nd flr: remodel kitchen and bath. add 1 bath and 1 den. new interior stairs to 1st flr. 3rd flr: remodel kitchen and bath. add 1 bath, 1 office, 1 bedroom, 1 laundry and stair to new roof deck. more than 25% existing | $160,000 |
| May 9, 2016 | Completed final sign-off Mar 2017 | 692 Page St | revision under construction for 201305217463; relocate hydronic system in all units and reconfigure kitchens.Details
revision under construction for 201305217463; relocate hydronic system in all units and reconfigure kitchens. | $5,500 |
| May 9, 2016 | Completed final sign-off Dec 2016 | 680 Page St | revision to app#201305217457. relocate hydronic system in hall closet and reconfigure kitchens in all units. 2/8x7/0. door in all bedroom #3Details
revision to app#201305217457. relocate hydronic system in hall closet and reconfigure kitchens in all units. 2/8x7/0. door in all bedroom #3 | $5,500 |
| May 9, 2016 | Completed final sign-off Dec 2016 | 686 Page St | revision to app#201305217462. relocate rear access. reconfigure kitchens, relocate hydronic units in closet.Details
revision to app#201305217462. relocate rear access. reconfigure kitchens, relocate hydronic units in closet. | $7,500 |
| May 9, 2016 | Completed final sign-off Mar 2017 | 698 Page St | revision to work under construction 201305217464, reconfigure bedroom, bathroom in unit #1 and 2 hr access to rear yard. relocate hydronic in all units to closet. concrete planter in rear yard.Details
revision to work under construction 201305217464, reconfigure bedroom, bathroom in unit #1 and 2 hr access to rear yard. relocate hydronic in all units to closet. concrete planter in rear yard. | $7,500 |
| Apr 28, 2016 | Completed final sign-off Jun 2017 | 138 08th Av | 1st flr: add one bedroom, 1 bath,1 family room,&laundry.new interior stairs to connect 2nd flr.enclose lightwell,2nd flr: remodel kitchen & bathrm, enclose lightwell.3rd flr: remodel kitchen & bathrm, add 2 baths,& laundry.new roof deck.more than 25% walls remain.Details
1st flr: add one bedroom, 1 bath,1 family room,&laundry.new interior stairs to connect 2nd flr.enclose lightwell,2nd flr: remodel kitchen & bathrm, enclose lightwell.3rd flr: remodel kitchen & bathrm, add 2 baths,& laundry.new roof deck.more than 25% walls remain. | $180,000 |
| Apr 18, 2016 | Completed final sign-off May 2016 | 159 Belvedere St | to comply with complaint #201569781: revision to app#201409045442. rebuild rear patio deck 15'x5' with planters, not to exceed 36".Details
to comply with complaint #201569781: revision to app#201409045442. rebuild rear patio deck 15'x5' with planters, not to exceed 36". | |
| Apr 5, 2016 | Expired or cancelled withdrawn Feb 2017 | 917 Florida St | revision to pa 2015-0903-6019, revise overall building depth & rear yard setbacks, reconfigure patio layout & revise interior wall demo calculations per revised floor plansDetails
revision to pa 2015-0903-6019, revise overall building depth & rear yard setbacks, reconfigure patio layout & revise interior wall demo calculations per revised floor plans | |
| Mar 22, 2016 | Completed final sign-off May 2017 | 724 Noe St | revision to pa# 2016/01/27/8152. 1st floor: enlarge deck & reconfigure stair @ rear. 2nd floor: infill lightwell @ south & north side. add cantilever deck @ rear.Details
revision to pa# 2016/01/27/8152. 1st floor: enlarge deck & reconfigure stair @ rear. 2nd floor: infill lightwell @ south & north side. add cantilever deck @ rear. | $10,000 |