Block 1383, lot 038
230 24th Ave
- City’s use
- Multi-Family Residential
- Built
- 1920
- Stories
- 2
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 4,376 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 19, 2026 | In progress filed Mar 2026, not yet issued | 230 24th Av | Home Quality Remodeling | install adu unit at g/f.Details
install adu unit at g/f. | $300,000 |
| Jun 6, 2024 | Expired or cancelled cancelled Jul 2025 | 230 24th Av | Home Quality Remodeling | legalize remodel of (e) kitchen on 4th flDetails
legalize remodel of (e) kitchen on 4th fl | $40,000 |
| Nov 3, 2021 | Completed final sign-off Jul 2022 | 230 24th Av | Yefa Construction Inc | revision to pa# 201904309351. reconfigure 4th fl south elevation property line windows from 3 to 4.Details
revision to pa# 201904309351. reconfigure 4th fl south elevation property line windows from 3 to 4. | $7,800 |
| Nov 24, 2020 | Completed final sign-off Jul 2022 | 230 24th Av | Hing Wah Construction Inc | new garage door in (e) opening. new entrydoor w/ new side lites w/ low-e, double glazing to replace failing (e) single glazed door and side lites. new doors will be the same size. add first floor fire barrier wall, door to create an elevator lobby.Details
new garage door in (e) opening. new entrydoor w/ new side lites w/ low-e, double glazing to replace failing (e) single glazed door and side lites. new doors will be the same size. add first floor fire barrier wall, door to create an elevator lobby. | $13,600 |
| Mar 2, 2020 | Expired or cancelled withdrawn Mar 2020 | 230 24th Av | new non structural brick facade/veneer for ground floor front (west) elevation n/a maherDetails
new non structural brick facade/veneer for ground floor front (west) elevation n/a maher | $13,000 | |
| Nov 13, 2019 | Completed final sign-off Apr 2022 | 230 24th Av | Crime Watch Security Sys Llc | ref pa# 201903286459; installation of a new sprinkler monitoring systemDetails
ref pa# 201903286459; installation of a new sprinkler monitoring system | $4,000 |
| Oct 11, 2019 | Completed final sign-off Jan 2021 | 230 24th Av | Hing Wah Construction Inc | new brick facade on ground floor (west elevation) to include framed openings for the garage & front door entry in response to enforcement action 2019-01451enf. related to pa# 2019/04/30/9351. ** maher: n/a **Details
new brick facade on ground floor (west elevation) to include framed openings for the garage & front door entry in response to enforcement action 2019-01451enf. related to pa# 2019/04/30/9351. ** maher: n/a ** | $13,000 |
| Sep 23, 2019 | Expired or cancelled withdrawn Jun 2021 | 230 24th Av | new brick facade on ground floor, to include framed (non structural) garage and entry opening) in response to enforcement # 201901451enf.Details
new brick facade on ground floor, to include framed (non structural) garage and entry opening) in response to enforcement # 201901451enf. | $7,500 | |
| Jul 25, 2019 | Never finaled issued Jul 2019, no final | 230 24th Av | street space onlyDetails
street space only | ||
| Apr 30, 2019 | Completed final sign-off Jul 2022 | 230 24th Av | Hing Wah Construction Inc | enclose an approved flat roofed exterior 4th level deck to include 1 new door & 1 new window. ** maher: n/a **Details
enclose an approved flat roofed exterior 4th level deck to include 1 new door & 1 new window. ** maher: n/a ** | $16,500 |
| Mar 28, 2019 | Completed final sign-off Apr 2022 | 230 24th Av | Pro Plumbing & Fire Sprinkler Inc | install fire sprinkler system throuhg-out bldg per nfpa 13r with new 2-inch fire service off of 8-inch main on 24th ave. ref 201802010137Details
install fire sprinkler system throuhg-out bldg per nfpa 13r with new 2-inch fire service off of 8-inch main on 24th ave. ref 201802010137 | $28,000 |
| Feb 19, 2019 | Never finaled issued Feb 2019, no final | 230 24th Av | street spaceDetails
street space | ||
| Aug 7, 2018 | Never finaled issued Aug 2018, no final | 230 24th Av | street spaceDetails
street space | ||
| Feb 1, 2018 | Completed final sign-off Jul 2022 | 230 24th Av | Hing Wah Construction Inc | in-fill north light well & ktichens (2) and bathrooms, add 3 new bathrooms, replace windows in facade, (n) stucco @ ground floor. (n) mep work as needed. 2 (n) bedroom & 1.5 baths @ ground floorDetails
in-fill north light well & ktichens (2) and bathrooms, add 3 new bathrooms, replace windows in facade, (n) stucco @ ground floor. (n) mep work as needed. 2 (n) bedroom & 1.5 baths @ ground floor | $440,000 |
| Jan 29, 2018 | Completed final sign-off Jul 2022 | 230 24th Av | Hing Wah Construction Inc | horizontal ext @rear (east) occupying (2) sides yards max allowable distance of 12ft beyond 45% rear yard setback for (1) story. 2nd flr deck & stair to backyard. revisions to 4th flr including remodeled bathroom, (n) kitchen, additional living space, (n) roofdeck, (n) windows & (n) doors.Details
horizontal ext @rear (east) occupying (2) sides yards max allowable distance of 12ft beyond 45% rear yard setback for (1) story. 2nd flr deck & stair to backyard. revisions to 4th flr including remodeled bathroom, (n) kitchen, additional living space, (n) roofdeck, (n) windows & (n) doors. | $190,000 |
| Jun 23, 2011 | Never finaled issued Jun 2011, no final | 230 24th Av | street spaceDetails
street space |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.