Permit GraphShortlistSan Francisco building permits since 2000

Permit 201808278397

539 05th Av

vertical & horizontal addition. interior & exterior remodel. replace alum windows with alum clad wood. add 1 unit @ ground level. rear addition. add 1 story, excavate lower level, 2 kitchens, 4 1/2 baths, roof terrace over rear addition.

Outcome
Completed (city status: complete, Feb 5, 2021)
Filed
Aug 27, 2018
Permit issued
Jun 17, 2019
Final sign-off
Feb 5, 2021
Declared cost
$850,000
Building use
2 family dwelling
Neighborhood
Inner Richmond (how long permits take there)
Contractor
Hing Wah Construction Inc (license 662696)
Project type
Kitchen remodel, Bathroom remodel
Property
All permits at this address (block 1548, lot 010)

Everyone on the permit

The parties and license numbers written on the permit, as the city lists them; not a check with any state board. The person who paid the fee and the project contact are not shown.

Contractor
Hing Wah Construction Inc (license 662696)
Owner-builder
Owner
Engineer
Michael Hom, Hom & Pisano Engineering Inc. (license 71450)
Authorized agent
Kelly Condon, Kelly Condon Design (no license listed), applicant