Block 3619, lot 026
3548 22nd St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 4
- Rooms
- 4 bathrooms
- Building
- 3,000 sq ft
- Lot
- 1,725 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 22, 2023 | Completed final sign-off Jun 2023 | 3548 22nd St | Global Arch Construction Inc | tenant improvement for (e) commercial space (new hair salon). install (2)(n) shampoo chairs, add (n) laundry, install (n) electrical circuits & plumbing connection per code. no massage or body art.Details
tenant improvement for (e) commercial space (new hair salon). install (2)(n) shampoo chairs, add (n) laundry, install (n) electrical circuits & plumbing connection per code. no massage or body art. | $45,000 |
| Aug 1, 2022 | Completed final sign-off Dec 2022 | 3548 22nd St | revision to permit 202104239271. to remove (e) non-structural office partitions in commercial space and to repair (e) exterior rear stairs. all other work as indicated in the original permit scope.Details
revision to permit 202104239271. to remove (e) non-structural office partitions in commercial space and to repair (e) exterior rear stairs. all other work as indicated in the original permit scope. | ||
| Sep 3, 2021 | Completed final sign-off Nov 2021 | 3546 22nd St | dry rot repair at bay window extensions on exterior.Details
dry rot repair at bay window extensions on exterior. | $3,300 | |
| Apr 23, 2021 | Completed final sign-off Dec 2022 | 3548 22nd St | United Painting & Const | work includes the reconfiguration of the commercial entry and unisex restroom for accesibility and the in-kind replacement of the rear exterior stairs leading to the 2nd fl. and those from street level leading to the yard levelDetails
work includes the reconfiguration of the commercial entry and unisex restroom for accesibility and the in-kind replacement of the rear exterior stairs leading to the 2nd fl. and those from street level leading to the yard level | $20,000 |
| Dec 24, 2018 | Never finaled issued Dec 2018, no final | 91 Chattanooga St | Magnum Construction Group Inc | install new fire alarm for fire sprinkler monitory system. ref app#201703302829Details
install new fire alarm for fire sprinkler monitory system. ref app#201703302829 | $3,500 |
| Nov 30, 2018 | Never finaled issued Nov 2018, no final | 91 Chattanooga St | street spaceDetails
street space | ||
| Oct 16, 2018 | Completed final sign-off Jun 2019 | 91 Chattanooga St | Hing Wah Construction Inc | revision to bpa #201703302829. revise window size in living room & bedroom. rearrange kitchen layout per plan. change main entrance steps direction per plan.Details
revision to bpa #201703302829. revise window size in living room & bedroom. rearrange kitchen layout per plan. change main entrance steps direction per plan. | |
| Jun 19, 2018 | Never finaled issued Jun 2018, no final | 91 Chattanooga St | street spaceDetails
street space | ||
| Apr 25, 2018 | Completed final sign-off Feb 2019 | 91 Chattanooga St | Project Contractor Inc | installation of fire sprinklers at ground fl. new unit only.per nfpa 13 and underground per nfpa 24. according to app# 2017-03-30-2829 (total of 8 sprinkler heads)Details
installation of fire sprinklers at ground fl. new unit only.per nfpa 13 and underground per nfpa 24. according to app# 2017-03-30-2829 (total of 8 sprinkler heads) | $6,000 |
| Mar 1, 2018 | Never finaled issued Mar 2018, no final | 91 Chattanooga St | street spaceDetails
street space | ||
| Mar 30, 2017 | Completed final sign-off Jul 2019 | 91 Chattanooga St | legalize as-built unit w/ kitchen, dining room, living room, one full bath & one bedroom on 1st floor per plan. per ordinance no. 43-14. sprinkler to nfpa-13 on deferred submittal.Details
legalize as-built unit w/ kitchen, dining room, living room, one full bath & one bedroom on 1st floor per plan. per ordinance no. 43-14. sprinkler to nfpa-13 on deferred submittal. | $20,000 | |
| Sep 1, 2009 | Completed final sign-off Dec 2009 | 89 Chattanooga St | Andes General Construction | renovation of 2nd fl apt in a 2 story bldg w/commercial below. renovate kitchen and bath. remove 2 non bearing interior partition walls. remove dropped ceiling. add recessed cans.Details
renovation of 2nd fl apt in a 2 story bldg w/commercial below. renovate kitchen and bath. remove 2 non bearing interior partition walls. remove dropped ceiling. add recessed cans. | $23,000 |
| Dec 4, 2008 | Completed final sign-off Jan 2009 | 3546 22nd St | renew pa# 2007/05/18/1738 to obtain final inspection.Details
renew pa# 2007/05/18/1738 to obtain final inspection. | ||
| Dec 14, 2007 | Never finaled issued Dec 2007, no final | 3546 22nd St | street space & sidewalkDetails
street space & sidewalk | ||
| May 18, 2007 | Expired or cancelled expired Jan 2009 | 3546 22nd St | replace 18' of retaining wall per plan. work is done on residential side onlyDetails
replace 18' of retaining wall per plan. work is done on residential side only | $2,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Andes General Construction, Global Arch Construction Inc, Hing Wah Construction Inc, Magnum Construction Group Inc, Project Contractor Inc, United Painting & Const
- Architects
- Kieran Boughan, Mark J. Topetcher, Mark Topetcher
- Engineers
- Jeff Chow
- Designers
- Alexandru Colta
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.