Global Arch Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2018 to Mar 2026
- Last 24 months
- 3 permits filed
33 permits since 2000: 28 completed, 2 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2026 | In progress issued Apr 2026 | 1304 Lombard St | revise p/a 2020-0903-3398 to document a change in the scope of the ground floor remodel to eliminate the previously proposed changes to various columns and to document minor changes in the floor plans of all 3, ground floor adu's.Details
revise p/a 2020-0903-3398 to document a change in the scope of the ground floor remodel to eliminate the previously proposed changes to various columns and to document minor changes in the floor plans of all 3, ground floor adu's. | |
| Aug 26, 2025 | Completed final sign-off Jul 2026 | 258 Sussex St | demo (e) office and powder room at 1st fl. convert part of the existing garage into new bedroom and bath within an area of 253 sq ft. install 2 new doors to the backyard. excavate e slab to increase the ceiling. e laundy relocation, new tankless water heater pump. repair back yard slab.Details
demo (e) office and powder room at 1st fl. convert part of the existing garage into new bedroom and bath within an area of 253 sq ft. install 2 new doors to the backyard. excavate e slab to increase the ceiling. e laundy relocation, new tankless water heater pump. repair back yard slab. | $75,000 |
| Aug 26, 2025 | Completed final sign-off Jan 2026 | 6138 Fulton St | bathroom remodeling at the upper floor. demo existing shower, remove existing tub, toilet and vanity sink. demo existing tile. install new exhaust fan and gfci receptacle. new can lights andf switches bathroom only. new tub, toilet and vinity sink.Details
bathroom remodeling at the upper floor. demo existing shower, remove existing tub, toilet and vanity sink. demo existing tile. install new exhaust fan and gfci receptacle. new can lights andf switches bathroom only. new tub, toilet and vinity sink. | $20,000 |
| Sep 3, 2024 | Completed final sign-off Jan 2025 | 634 Clarendon Av | demo (e) kitchen cabinets install (n) ones. (n) can lights in the work areas. remodel (e) bathroom and master bath. (n) toilet, shower pan and vanity sink in the same location . no wall demo or new framing.Details
demo (e) kitchen cabinets install (n) ones. (n) can lights in the work areas. remodel (e) bathroom and master bath. (n) toilet, shower pan and vanity sink in the same location . no wall demo or new framing. | $45,000 |
| Dec 13, 2023 | Completed final sign-off Feb 2024 | 4140 Cesar Chavez St | apt# 62: demo existing partition walls per plan, to accomodate new laundry. demo extg kitchen, install cabinets per new layout. new appliances, range & sink, replace extg tubs, sinks, & toilet with new ones in the same location. new recessed can lights & circuits.Details
apt# 62: demo existing partition walls per plan, to accomodate new laundry. demo extg kitchen, install cabinets per new layout. new appliances, range & sink, replace extg tubs, sinks, & toilet with new ones in the same location. new recessed can lights & circuits. | $40,000 |
| Oct 24, 2023 | In progress issued Dec 2023 | 1214 Masonic Av | remodel (e) residence, interior addition of 85.5 sq ft to the lower fl to accommodate new office, laundry and walk in closet. relocate laundry from the garage, relocate water heaters. kitchen remodling at the middle fl. convert (e) bedroom into master bath and closet. (e) bath upper fl, newDetails
remodel (e) residence, interior addition of 85.5 sq ft to the lower fl to accommodate new office, laundry and walk in closet. relocate laundry from the garage, relocate water heaters. kitchen remodling at the middle fl. convert (e) bedroom into master bath and closet. (e) bath upper fl, new | $15,000 |
| Aug 18, 2023 | Completed final sign-off Nov 2023 | 4130 Cesar Chavez St | unit# 52: demo existing partition wall in bathroom, construct new walls per plan to accommodate new laundry. connect new plumbing, new kitchen appliances and cabinets, add new recessed lights and circuits.Details
unit# 52: demo existing partition wall in bathroom, construct new walls per plan to accommodate new laundry. connect new plumbing, new kitchen appliances and cabinets, add new recessed lights and circuits. | $43,000 |
| Jun 23, 2023 | Completed final sign-off Nov 2023 | 1876 Bush St | convert (e) storage space into (n) office & media room for lower unit 1876. no changes to (e) bath. no demo or new framing. new conditional area 611 sf is conditioned & ventilated mechanically (forced air)Details
convert (e) storage space into (n) office & media room for lower unit 1876. no changes to (e) bath. no demo or new framing. new conditional area 611 sf is conditioned & ventilated mechanically (forced air) | $2,000 |
| May 5, 2023 | Completed final sign-off Oct 2023 | 1742 Bush St | remodel of (e) bathroom: demo vanity, water closet, tub and part of the non-load bearing wall. install new sink, toilet & shower, new electrical switches & receptacles.Details
remodel of (e) bathroom: demo vanity, water closet, tub and part of the non-load bearing wall. install new sink, toilet & shower, new electrical switches & receptacles. | $20,552 |
| Mar 22, 2023 | Completed final sign-off Jun 2023 | 3548 22nd St | tenant improvement for (e) commercial space (new hair salon). install (2)(n) shampoo chairs, add (n) laundry, install (n) electrical circuits & plumbing connection per code. no massage or body art.Details
tenant improvement for (e) commercial space (new hair salon). install (2)(n) shampoo chairs, add (n) laundry, install (n) electrical circuits & plumbing connection per code. no massage or body art. | $45,000 |
| Mar 22, 2023 | Completed final sign-off Jun 2023 | 1933 Jones St | demo (e) vanity sink in the (e) bathroom relocate it in the (e) bedroom closet demo part of the wall of the closet new walls for closet in the (e) bedroom new bathr receptacle and lightDetails
demo (e) vanity sink in the (e) bathroom relocate it in the (e) bedroom closet demo part of the wall of the closet new walls for closet in the (e) bedroom new bathr receptacle and light | $15,000 |
| Jan 23, 2023 | Completed final sign-off Apr 2023 | 1304 Lombard St | unit 11: remove (e) kitchen cabinets. install new kitchen cabinets and appliances. replace bath tub, water closet and sink in the same location. add new laundry units in (e) closet. new electrical receptacles and can lights. to comply with complaint 202302024.Details
unit 11: remove (e) kitchen cabinets. install new kitchen cabinets and appliances. replace bath tub, water closet and sink in the same location. add new laundry units in (e) closet. new electrical receptacles and can lights. to comply with complaint 202302024. | $45,000 |
| Dec 7, 2022 | Completed final sign-off Sep 2023 | 242 Romain St | convert 260sqft of exisitng garage into new bathroom and closet at the middle flr. construct new separation walls per plan. use existing plumbing and mechanical connections. add new electrical circuits per code.Details
convert 260sqft of exisitng garage into new bathroom and closet at the middle flr. construct new separation walls per plan. use existing plumbing and mechanical connections. add new electrical circuits per code. | $50,000 |
| Nov 8, 2022 | Never finaled issued Nov 2022, no final | 1414 Oakdale Av | convert 698 sq. ft. of (e) ground floor into living space. construct new separation walls per plan. add 1 play room with 2 bedrooms & 1 bath. new electrical circuits per code. use (e) plumbing. new mini split hvac units on separate permit.Details
convert 698 sq. ft. of (e) ground floor into living space. construct new separation walls per plan. add 1 play room with 2 bedrooms & 1 bath. new electrical circuits per code. use (e) plumbing. new mini split hvac units on separate permit. | $45,000 |
| Sep 23, 2022 | Completed final sign-off Jun 2023 | 1615 48th Av | revision to pa# 2022-0817-0770 to change the room name from (e) office back to (e) bedroom for both units.Details
revision to pa# 2022-0817-0770 to change the room name from (e) office back to (e) bedroom for both units. | |
| Aug 17, 2022 | Completed final sign-off Jun 2023 | 1615 48th Av | remove partition wall btw kitchen, dining room & living area for both units. (e) kitchens & bathrooms remodeling. new recessed lights, remove laundry from 1st fl, install laundrt in both units. new water heater & storage room.Details
remove partition wall btw kitchen, dining room & living area for both units. (e) kitchens & bathrooms remodeling. new recessed lights, remove laundry from 1st fl, install laundrt in both units. new water heater & storage room. | $100,000 |
| Jun 29, 2022 | Completed final sign-off Feb 2023 | 2138 26th Av | remodel extg kitchen cabinets and island. install new kitchen electrical circuits. demo extg seperation walls between kitchen and living room. install new support posts and beams per plans.Details
remodel extg kitchen cabinets and island. install new kitchen electrical circuits. demo extg seperation walls between kitchen and living room. install new support posts and beams per plans. | $45,000 |
| Jun 8, 2022 | Expired or cancelled suspend Aug 2022 | 225 Farallones St | 2nd fl renovation: relocate living room, dining room, and kitchen. add laundry, master bedroom with bathroom per plan. new water heater. back cottage renovation: relocate (e) bathroom in the (e) bedroom. add laundry, remodel kitchen.Details
2nd fl renovation: relocate living room, dining room, and kitchen. add laundry, master bedroom with bathroom per plan. new water heater. back cottage renovation: relocate (e) bathroom in the (e) bedroom. add laundry, remodel kitchen. | $350,000 |
| May 9, 2022 | Completed final sign-off Mar 2023 | 1876 Bush St | ground floor garage & workshop modification. demo interior walls where necessary, create new window opening, remove/replace (e) posts/beam, construct new partition walls, add new bathroomDetails
ground floor garage & workshop modification. demo interior walls where necessary, create new window opening, remove/replace (e) posts/beam, construct new partition walls, add new bathroom | $45,000 |
| Mar 30, 2022 | Completed final sign-off Oct 2022 | 2146 Chestnut St | convert existing retail space into cafe shop. no wall demo or constructionDetails
convert existing retail space into cafe shop. no wall demo or construction | $20,000 |
| Feb 14, 2022 | Completed final sign-off Mar 2023 | 1876 Bush St | remodel units 1876 & 1878 - relocate bathroom & kitchen; full electrical rewire work; adidng a laundry; convert (e) kitchen into (n) living rm, (e) bedrm to kitchen; demo walls per plans and add new walls where necessaryDetails
remodel units 1876 & 1878 - relocate bathroom & kitchen; full electrical rewire work; adidng a laundry; convert (e) kitchen into (n) living rm, (e) bedrm to kitchen; demo walls per plans and add new walls where necessary | $200,000 |
| Jan 10, 2022 | Completed final sign-off Apr 2022 | 4130 Cesar Chavez St | unit 40: remodel kitchen & bathroom, upgrade electrical. demo (e) partition wall between hallway and bedroom. add laundry @ kitchen wallDetails
unit 40: remodel kitchen & bathroom, upgrade electrical. demo (e) partition wall between hallway and bedroom. add laundry @ kitchen wall | $45,000 |
| Dec 20, 2021 | Completed final sign-off Apr 2022 | 191 Frederick St | unit 23. to comply with complaint #202185202. remodel kitchen and bathroom. electrical add recess lights, outlets.Details
unit 23. to comply with complaint #202185202. remodel kitchen and bathroom. electrical add recess lights, outlets. | $45,000 |
| Mar 25, 2021 | Completed final sign-off Aug 2021 | 777 Noriega St | new exercise room with bathroom at lower level floor.Details
new exercise room with bathroom at lower level floor. | $40,000 |
| Mar 25, 2021 | Completed final sign-off Aug 2021 | 9 Decatur St | existing exterior siding replacement on kate street side.Details
existing exterior siding replacement on kate street side. | $9,500 |
| Dec 10, 2020 | Expired or cancelled cancelled Jan 2026 | 816 Victoria St | existing patio conversion into new sunroom.Details
existing patio conversion into new sunroom. | $10,000 |
| Oct 31, 2020 | Completed final sign-off Mar 2021 | 2215 Market St | barrier removal only. adding new ada restroom. railings and striping at (e) stairs.Details
barrier removal only. adding new ada restroom. railings and striping at (e) stairs. | $25,000 |
| Feb 6, 2020 | Completed final sign-off May 2020 | 236 Sanchez St | kitchen and bathroom remodel. ref pa# 201912058809Details
kitchen and bathroom remodel. ref pa# 201912058809 | $40,000 |
| Feb 3, 2020 | Completed final sign-off May 2020 | 4130 Cesar Chavez St | unit # 21: interior remodel to convert (e) storage into a half bath and (e) close into a laundry.Details
unit # 21: interior remodel to convert (e) storage into a half bath and (e) close into a laundry. | $20,000 |
| Dec 5, 2019 | Completed final sign-off Feb 2020 | 4130 Cesar Chavez St | unit #25: interior remodel to convert existing storage into a half bath and existing closet into a laundry roomDetails
unit #25: interior remodel to convert existing storage into a half bath and existing closet into a laundry room | $15,000 |
| Dec 5, 2019 | Completed final sign-off May 2020 | 236 Sanchez St | interior remodel to convert existing pantry into a toilet and existing closets into a laundry and bathroomDetails
interior remodel to convert existing pantry into a toilet and existing closets into a laundry and bathroom | $45,000 |
| Sep 12, 2018 | Completed final sign-off Dec 2021 | 230 Sanchez St | seismic retrofit per sf ordaniance no 66-13 seismic strengthening of soft story. wood fram building.no change to building footprint or exterior appearance (residential portion). share same plan set with pa 201809129921.Details
seismic retrofit per sf ordaniance no 66-13 seismic strengthening of soft story. wood fram building.no change to building footprint or exterior appearance (residential portion). share same plan set with pa 201809129921. | $10,000 |
| Sep 12, 2018 | Completed final sign-off Dec 2021 | 230 Sanchez St | seismic retrofit per sf ordaniance no 66-13 seismic strengthening of soft story. wood fram building.no change to building footprint or exterior appearance (commercial portion). share same plan set with pa 201809129917.Details
seismic retrofit per sf ordaniance no 66-13 seismic strengthening of soft story. wood fram building.no change to building footprint or exterior appearance (commercial portion). share same plan set with pa 201809129917. | $70,000 |