Block 6563, lot 043
4130 Cesar Chavez St
- City’s use
- Multi-Family Residential
- Built
- 1964
- Stories
- 3
- Units
- 40
- Rooms
- 43 bathrooms
- Building
- 41,576 sq ft
- Lot
- 19,824 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
61 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 24, 2025 | In progress issued Oct 2025 | 4130 Cesar Chavez St | Commercial Fire Protection Llc | as built to pa # 2025-0130-9362. the model number for the annunciator was changed. one annunciator was added next to the panel. module for waterflow switch removed the plan.Details
as built to pa # 2025-0130-9362. the model number for the annunciator was changed. one annunciator was added next to the panel. module for waterflow switch removed the plan. | |
| Oct 24, 2025 | Completed final sign-off Oct 2025 | 4140 Cesar Chavez St | Commercial Fire Protection Llc | as built to pa # 2025-0130-9368. the model number for the annunciator was changed. one module for waterflow switch removed from plan.Details
as built to pa # 2025-0130-9368. the model number for the annunciator was changed. one module for waterflow switch removed from plan. | |
| Jan 30, 2025 | Completed final sign-off Dec 2025 | 4140 Cesar Chavez St | Commercial Fire Protection Llc | upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1 ab#3.08, ab#2.01 and 2022 cfc, cbc and nfpa72-2022. cfp shall install fire alarm horn to comply with sffd section 1103.7.6.1. existing fire alarm devices to be replaced include manual pull stations, heat and smoke detectors. (e)Details
upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1 ab#3.08, ab#2.01 and 2022 cfc, cbc and nfpa72-2022. cfp shall install fire alarm horn to comply with sffd section 1103.7.6.1. existing fire alarm devices to be replaced include manual pull stations, heat and smoke detectors. (e) | $39,900 |
| Jan 30, 2025 | Completed final sign-off Dec 2025 | 4130 Cesar Chavez St | Commercial Fire Protection Llc | upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1 ab#3.08, ab#2.01 and 2022 cfc, cbc and nfpa72-2022. cfp shall install fire alarm horn to comply with sffd section 1103.7.6.1. existing fire alarm devices to be replaced include manual pull stations, heat and smoke. (e) bell to beDetails
upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1 ab#3.08, ab#2.01 and 2022 cfc, cbc and nfpa72-2022. cfp shall install fire alarm horn to comply with sffd section 1103.7.6.1. existing fire alarm devices to be replaced include manual pull stations, heat and smoke. (e) bell to be | $39,900 |
| Dec 13, 2023 | Completed final sign-off Feb 2024 | 4140 Cesar Chavez St | Global Arch Construction Inc | apt# 62: demo existing partition walls per plan, to accomodate new laundry. demo extg kitchen, install cabinets per new layout. new appliances, range & sink, replace extg tubs, sinks, & toilet with new ones in the same location. new recessed can lights & circuits.Details
apt# 62: demo existing partition walls per plan, to accomodate new laundry. demo extg kitchen, install cabinets per new layout. new appliances, range & sink, replace extg tubs, sinks, & toilet with new ones in the same location. new recessed can lights & circuits. | $40,000 |
| Aug 18, 2023 | Completed final sign-off Nov 2023 | 4130 Cesar Chavez St | Global Arch Construction Inc | unit# 52: demo existing partition wall in bathroom, construct new walls per plan to accommodate new laundry. connect new plumbing, new kitchen appliances and cabinets, add new recessed lights and circuits.Details
unit# 52: demo existing partition wall in bathroom, construct new walls per plan to accommodate new laundry. connect new plumbing, new kitchen appliances and cabinets, add new recessed lights and circuits. | $43,000 |
| Jan 10, 2022 | Completed final sign-off Apr 2022 | 4130 Cesar Chavez St | Global Arch Construction Inc | unit 40: remodel kitchen & bathroom, upgrade electrical. demo (e) partition wall between hallway and bedroom. add laundry @ kitchen wallDetails
unit 40: remodel kitchen & bathroom, upgrade electrical. demo (e) partition wall between hallway and bedroom. add laundry @ kitchen wall | $45,000 |
| Feb 3, 2020 | Completed final sign-off May 2020 | 4130 Cesar Chavez St | Global Arch Construction Inc | unit # 21: interior remodel to convert (e) storage into a half bath and (e) close into a laundry.Details
unit # 21: interior remodel to convert (e) storage into a half bath and (e) close into a laundry. | $20,000 |
| Dec 5, 2019 | Completed final sign-off Feb 2020 | 4130 Cesar Chavez St | Global Arch Construction Inc | unit #25: interior remodel to convert existing storage into a half bath and existing closet into a laundry roomDetails
unit #25: interior remodel to convert existing storage into a half bath and existing closet into a laundry room | $15,000 |
| May 2, 2019 | Completed final sign-off Aug 2019 | 4130 Cesar Chavez St | Euro Plumbing Inc, General Contractor | unit 23 - interior remodel to convert existing storage into a half bath and existing closet into a laundryDetails
unit 23 - interior remodel to convert existing storage into a half bath and existing closet into a laundry | $35,000 |
| Mar 21, 2016 | Never finaled issued Mar 2016, no final | 4140 Cesar Chavez St | Architectural Fenestration & Restoration | repair and replace damaged vinyl siding on west side, non street visable, due to water & wind damage. in same like & type 6" panel.Details
repair and replace damaged vinyl siding on west side, non street visable, due to water & wind damage. in same like & type 6" panel. | $12,500 |
| Jul 24, 2015 | Never finaled issued Jul 2015, no final | 4130 Cesar Chavez St | Strong Builders Construction Inc. | unit 41: remodel kitchen/bathroom, includes shower valve replacement, add laundry on entrance closet, ventless dryer.Details
unit 41: remodel kitchen/bathroom, includes shower valve replacement, add laundry on entrance closet, ventless dryer. | $15,000 |
| Jun 15, 2015 | Completed final sign-off Sep 2015 | 4130 Cesar Chavez St | Make Ready Maintenance Inc | work in unit #61: kitchen and bathroom remodel, no new wall and no existing wall relocation. no window changes. lighting in kitchen and bathroom remodel shall compoly with cec 150.0(k)3 & cec 150.0(k)5Details
work in unit #61: kitchen and bathroom remodel, no new wall and no existing wall relocation. no window changes. lighting in kitchen and bathroom remodel shall compoly with cec 150.0(k)3 & cec 150.0(k)5 | $22,000 |
| Jun 20, 2012 | Completed final sign-off Jun 2012 | 4130 Cesar Chavez St | to obtain final inspection for work approved under pa#201001255232. all work is complete.Details
to obtain final inspection for work approved under pa#201001255232. all work is complete. | ||
| Jun 20, 2012 | Completed final sign-off Jun 2012 | 4140 Cesar Chavez St | to obtain final inspection for work approved under pa#201001255233. all work is complete.Details
to obtain final inspection for work approved under pa#201001255233. all work is complete. | ||
| Feb 23, 2012 | Completed final sign-off Apr 2012 | 4140 Cesar Chavez St | Make Ready Maintenance Inc | kitchen cabinets remodel in unit 60 only.Details
kitchen cabinets remodel in unit 60 only. | $3,500 |
| Jun 15, 2010 | Completed final sign-off Aug 2010 | 4130 Cesar Chavez St | Trademark Roofing | reroofingDetails
reroofing | $40,000 |
| Mar 29, 2010 | Completed final sign-off Apr 2010 | 4140 Cesar Chavez St | Prosiding Inc. | fee increase per robert power; additional siding and trimDetails
fee increase per robert power; additional siding and trim | $2,500 |
| Mar 29, 2010 | Completed final sign-off Mar 2010 | 4130 Cesar Chavez St | Prosiding Inc. | fee increase per robert power; additional siding and trim.Details
fee increase per robert power; additional siding and trim. | $2,500 |
| Feb 18, 2010 | Completed final sign-off Mar 2010 | 4140 Cesar Chavez St | Prosiding Inc. | install new siding and trim on one wall plus ten foot return on another.Details
install new siding and trim on one wall plus ten foot return on another. | $2,500 |
| Feb 18, 2010 | Never finaled issued Feb 2010, no final | 4130 Cesar Chavez St | street space | ||
| Feb 18, 2010 | Completed final sign-off Apr 2010 | 4130 Cesar Chavez St | Prosiding Inc. | install new siding and trim on one wall plus ten foot return on another.Details
install new siding and trim on one wall plus ten foot return on another. | $2,500 |
| Feb 17, 2010 | Completed final sign-off Nov 2011 | 4130 Cesar Chavez St | Associated Materials / Dba: Alside Inc. | replace 7 hallway entry doors with same size, same location, same configuration & same fire-rating. remodel installation - no substrate change. "vista wall" storefront aluminum 1" dual temp. glass with low e. all doors meet egress.Details
replace 7 hallway entry doors with same size, same location, same configuration & same fire-rating. remodel installation - no substrate change. "vista wall" storefront aluminum 1" dual temp. glass with low e. all doors meet egress. | $12,000 |
| Feb 9, 2010 | Never finaled issued Feb 2010, no final | 4130 Cesar Chavez St | street space | ||
| Feb 1, 2010 | Completed final sign-off Jun 2010 | 4130 Cesar Chavez St | Associated Materials / Dba: Alside Inc. | window replacement only-same size & location-same configuration. 150-windows total-50 visable from the street. new windows to be vinyl.no structural changes. replace in kind.Details
window replacement only-same size & location-same configuration. 150-windows total-50 visable from the street. new windows to be vinyl.no structural changes. replace in kind. | $89,000 |
| Jan 25, 2010 | Expired or cancelled expired Jun 2012 | 4130 Cesar Chavez St | Cornerstone Select Builders Inc | voluntary strengthening of building at tuck under parking (in rear) and shear walls in front.Details
voluntary strengthening of building at tuck under parking (in rear) and shear walls in front. | $30,000 |
| Jan 25, 2010 | Expired or cancelled expired Jun 2012 | 4140 Cesar Chavez St | Cornerstone Select Builders Inc | voluntary strengthening at tuck (in rear) under parking and shear walls in front, not visible from street.Details
voluntary strengthening at tuck (in rear) under parking and shear walls in front, not visible from street. | $25,000 |
| Jul 20, 2009 | Completed final sign-off Sep 2009 | 4140 Cesar Chavez St | Pankow Special Projects Lp | work @ unit#12,#22, & #20. revision to 200907021882, balcony repair and replacement at rear. change material from painted metal deck to painted wood deck (in kind)Details
work @ unit#12,#22, & #20. revision to 200907021882, balcony repair and replacement at rear. change material from painted metal deck to painted wood deck (in kind) | $21,000 |
| Jul 2, 2009 | Completed final sign-off Sep 2009 | 4140 Cesar Chavez St | Pankow Special Projects Lp | balcony repair & replacement @ units 12, 20 & 22, in kind.Details
balcony repair & replacement @ units 12, 20 & 22, in kind. | $42,700 |
| Feb 20, 2009 | Expired or cancelled expired Apr 2012 | 4140 Cesar Chavez St | On-Site Maintenance | work @ unit# 12 only. repair exterior deck & siding. less than 50%.Details
work @ unit# 12 only. repair exterior deck & siding. less than 50%. | $5,000 |
| Feb 20, 2009 | Expired or cancelled expired Apr 2012 | 4130 Cesar Chavez St | On-Site Maintenance | for administration purposes only. remove unit# 25 from pa# 2009/02/09/1650. work only in unit# 20.Details
for administration purposes only. remove unit# 25 from pa# 2009/02/09/1650. work only in unit# 20. | |
| Feb 17, 2009 | Completed final sign-off Mar 2009 | 4140 Cesar Chavez St | On-Site Maintenance | renew pa# 2007/08/23/0666 to obtain final inspection. all work has been completed.Details
renew pa# 2007/08/23/0666 to obtain final inspection. all work has been completed. | |
| Feb 17, 2009 | Completed final sign-off Mar 2009 | 4130 Cesar Chavez St | On-Site Maintenance | renew pa# 2007/08/23/0663 to obtain final inspection. all work has been completed.Details
renew pa# 2007/08/23/0663 to obtain final inspection. all work has been completed. | |
| Feb 17, 2009 | Completed final sign-off Mar 2009 | 4130 Cesar Chavez St | On-Site Maintenance | renew pa# 2008/02/14/4820 to obtain final inspection. all work has been completed.Details
renew pa# 2008/02/14/4820 to obtain final inspection. all work has been completed. | |
| Feb 9, 2009 | Expired or cancelled expired Apr 2012 | 4140 Cesar Chavez St | On-Site Maintenance | work @ unit# 22 only. repair exterior deck & siding. less than 50% replacement.Details
work @ unit# 22 only. repair exterior deck & siding. less than 50% replacement. | $5,000 |
| Feb 9, 2009 | Expired or cancelled expired Apr 2012 | 4130 Cesar Chavez St | On-Site Maintenance | work @ unit# 20 & # 25 only. repair exterior deck, less than 50% w/o drawings. & siding.Details
work @ unit# 20 & # 25 only. repair exterior deck, less than 50% w/o drawings. & siding. | $10,000 |
| Oct 21, 2008 | Completed final sign-off Jan 2009 | 4140 Cesar Chavez St | On-Site Maintenance | work @ unit# 12 & # 51 only. bathrooms. replace fixtures, faucets & retile. remove & replace finishes to complete new electrical work @ kitchen & bath. kitchen & bathroom remodel. no structural. cabinets, counter, tile.Details
work @ unit# 12 & # 51 only. bathrooms. replace fixtures, faucets & retile. remove & replace finishes to complete new electrical work @ kitchen & bath. kitchen & bathroom remodel. no structural. cabinets, counter, tile. | $50,000 |
| Jul 17, 2008 | Completed final sign-off Jul 2008 | 4130 Cesar Chavez St | On-Site Maintenance | comply with nov 200732436 vent dryers to outside.Details
comply with nov 200732436 vent dryers to outside. | $500 |
| May 22, 2008 | Completed final sign-off Sep 2008 | 4130 Cesar Chavez St | On-Site Maintenance | revision in app#200805202434. add unit#11 from app#200805202438.Details
revision in app#200805202434. add unit#11 from app#200805202438. | |
| May 22, 2008 | Expired or cancelled expired Apr 2012 | 4140 Cesar Chavez St | On-Site Maintenance | remove unit#11, only doing work in unit#30. revision in application#200805202438.Details
remove unit#11, only doing work in unit#30. revision in application#200805202438. | |
| May 20, 2008 | Completed final sign-off Sep 2008 | 4130 Cesar Chavez St | On-Site Maintenance | work @ unit# 60 only. kitchen & bathroom remodel. non structural. cabinets, counter, tile, florescent light.Details
work @ unit# 60 only. kitchen & bathroom remodel. non structural. cabinets, counter, tile, florescent light. | $25,050 |
| May 20, 2008 | Completed final sign-off Sep 2008 | 4140 Cesar Chavez St | On-Site Maintenance | work @ unit# 11 & # 30 only. kitchen & bathroom remodel. non structural. cabinets, counter, tile, florescent light.Details
work @ unit# 11 & # 30 only. kitchen & bathroom remodel. non structural. cabinets, counter, tile, florescent light. | $40,000 |
| Feb 14, 2008 | Expired or cancelled expired Mar 2009 | 4130 Cesar Chavez St | On-Site Maintenance | 4140 #61- kitchen and bath remodel, new cabinets, counter, tile, flourescent lights.Details
4140 #61- kitchen and bath remodel, new cabinets, counter, tile, flourescent lights. | $25,001 |
| Nov 29, 2007 | Never finaled issued Nov 2007, no final | 4130 Cesar Chavez St | street space permit | ||
| Oct 19, 2007 | Completed final sign-off Nov 2007 | 4130 Cesar Chavez St | On-Site Maintenance | unit #14-kitchen & bathroom remodel in kind. no structural changes, no windows, door or wall alterations. kitchen at least 50% of lighting wattage must be flourscent. bath flourscent or motion controlled sensor, exhaust termination 3'min from property line and bldg openingsDetails
unit #14-kitchen & bathroom remodel in kind. no structural changes, no windows, door or wall alterations. kitchen at least 50% of lighting wattage must be flourscent. bath flourscent or motion controlled sensor, exhaust termination 3'min from property line and bldg openings | $21,000 |
| Oct 18, 2007 | Completed final sign-off Feb 2008 | 4130 Cesar Chavez St | On-Site Maintenance | kichen, bathroom remodel in kind . no structural change.no window door as wall alterations. kitchen at least 50 % of lighting, wattage must be flourescent or motion controlled senser. exhaust termintation 3'min from property line and bldg openingDetails
kichen, bathroom remodel in kind . no structural change.no window door as wall alterations. kitchen at least 50 % of lighting, wattage must be flourescent or motion controlled senser. exhaust termintation 3'min from property line and bldg opening | $21,000 |
| Sep 28, 2007 | Completed final sign-off Feb 2008 | 4130 Cesar Chavez St | On-Site Maintenance | kitchen and bath remodel in kind no structural changes. no wndw, door or wall alterations. kitchen: atleast 50% at lighting wattage must be flourescent. bath: flourescent or motion controlled sensor exhaust termination 3 min from pl & bldg openingsDetails
kitchen and bath remodel in kind no structural changes. no wndw, door or wall alterations. kitchen: atleast 50% at lighting wattage must be flourescent. bath: flourescent or motion controlled sensor exhaust termination 3 min from pl & bldg openings | $30,000 |
| Aug 23, 2007 | Expired or cancelled expired Mar 2009 | 4140 Cesar Chavez St | On-Site Maintenance | unit#14. remodel kitchen & bathroom in kind. no structural changes,no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath flourescent or motion controlled sensor, exhaust terminatio 3' min from p.l. & bldg openings.Details
unit#14. remodel kitchen & bathroom in kind. no structural changes,no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath flourescent or motion controlled sensor, exhaust terminatio 3' min from p.l. & bldg openings. | $22,000 |
| Aug 23, 2007 | Completed final sign-off Feb 2008 | 4130 Cesar Chavez St | On-Site Maintenance | unit#22. remodel kitchen & bathroom in kind. no structural changes,no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath flourescent or motion controlled sensor, exhaust terminatio 3' min from p.l. & bldg openings.Details
unit#22. remodel kitchen & bathroom in kind. no structural changes,no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath flourescent or motion controlled sensor, exhaust terminatio 3' min from p.l. & bldg openings. | $25,000 |
| Aug 23, 2007 | Completed final sign-off Nov 2007 | 4130 Cesar Chavez St | On-Site Maintenance | unit#43. remodel kitchen & bathroom in kind. no structural changes,no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath flourescent or motion controlled sensor, exhaust terminatio 3' min from p.l. & bldg openings.Details
unit#43. remodel kitchen & bathroom in kind. no structural changes,no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath flourescent or motion controlled sensor, exhaust terminatio 3' min from p.l. & bldg openings. | $25,000 |
| Aug 23, 2007 | Expired or cancelled expired Mar 2009 | 4130 Cesar Chavez St | On-Site Maintenance | unit#25. remodel kitchen & bathroom in kind. no structural changes,no window door or wall alterations. kitchen at least 50% of lighting must be fluorescent. bath flourescent or motion controlled sensor, exhaust terminatio 3' min from p.l. & bldg openings.Details
unit#25. remodel kitchen & bathroom in kind. no structural changes,no window door or wall alterations. kitchen at least 50% of lighting must be fluorescent. bath flourescent or motion controlled sensor, exhaust terminatio 3' min from p.l. & bldg openings. | $25,000 |
| Aug 3, 2007 | Never finaled issued Aug 2007, no final | 4130 Cesar Chavez St | street space | ||
| Mar 16, 2007 | Completed final sign-off Jul 2007 | 4130 Cesar Chavez St | On-Site Maintenance | #63 - kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window or door work. kitchen- at least 50% of lighting wattage must be fluorescent. bath - fluorescent or controlled by motion sensor.Details
#63 - kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window or door work. kitchen- at least 50% of lighting wattage must be fluorescent. bath - fluorescent or controlled by motion sensor. | $15,000 |
| Mar 16, 2007 | Completed final sign-off Jul 2007 | 4140 Cesar Chavez St | On-Site Maintenance | #10 -kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window or door work. kitchen- at least 50% of lighting wattage must be fluorescent. bath - flo=uorescent of motion controlled sensor.Details
#10 -kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window or door work. kitchen- at least 50% of lighting wattage must be fluorescent. bath - flo=uorescent of motion controlled sensor. | $15,000 |
| Mar 16, 2007 | Completed final sign-off Jul 2007 | 4140 Cesar Chavez St | On-Site Maintenance | #22 - kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window or door work. kitchen at least 50% of lighting wattage must be fluorescent. bath's fluorescent or motion controlled sensor.Details
#22 - kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window or door work. kitchen at least 50% of lighting wattage must be fluorescent. bath's fluorescent or motion controlled sensor. | $15,000 |
| Mar 16, 2007 | Completed final sign-off Jul 2007 | 4130 Cesar Chavez St | On-Site Maintenance | #12 - kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrade. no window or door work. kitchen- at least 50% of lighting wattage must be fluorescent. bath - fluorescent or controlled by motion sensor.Details
#12 - kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrade. no window or door work. kitchen- at least 50% of lighting wattage must be fluorescent. bath - fluorescent or controlled by motion sensor. | $15,000 |
| Mar 14, 2007 | Never finaled issued Mar 2007, no final | 4130 Cesar Chavez St | street space | ||
| Apr 15, 2003 | Expired or cancelled expired Aug 2004 | 4130 Cesar Chavez St | repair of existing deck & guardrails. work in units:22,23,41,50,51,52,62,63. repair work less thanDetails
repair of existing deck & guardrails. work in units:22,23,41,50,51,52,62,63. repair work less than | $6,500 | |
| Apr 26, 2002 | Completed final sign-off May 2002 | 4130 Cesar Chavez St | Basec | revision to app#2002/04/03/2975. replace 16 more steps w/ like kind (front stair)concrete step. attcDetails
revision to app#2002/04/03/2975. replace 16 more steps w/ like kind (front stair)concrete step. attc | $1,000 |
| Apr 3, 2002 | Completed final sign-off May 2002 | 4130 Cesar Chavez St | Basec | rev. appl#200201318219 replace 10 steps w/like kind @ front stair, concrete steps attch to (e) strinDetails
rev. appl#200201318219 replace 10 steps w/like kind @ front stair, concrete steps attch to (e) strin | $1,000 |
| Jan 31, 2002 | Completed final sign-off Apr 2002 | 4130 Cesar Chavez St | Basec | repair of existing decks and guardrailsDetails
repair of existing decks and guardrails | $8,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- On-Site Maintenance (25), Global Arch Construction Inc (5), Commercial Fire Protection Llc (4), Prosiding Inc. (4), Basec (3), Associated Materials / Dba: Alside Inc. (2), Cornerstone Select Builders Inc (2), Make Ready Maintenance Inc (2), Pankow Special Projects Lp (2), Architectural Fenestration & Restoration, Euro Plumbing Inc, General Contractor, Strong Builders Construction Inc., Trademark Roofing
- Architects
- Terryl M Lofrano
- Engineers
- Robert Boyens (2)
- Designers
- David B. Edwards (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.