Block 0499, lot 002A
1304 Lombard St
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 3
- Units
- 12
- Rooms
- 13 bathrooms
- Building
- 10,500 sq ft
- Lot
- 4,000 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 31, 2026 | In progress issued Apr 2026 | 1304 Lombard St | Global Arch Construction Inc | revise p/a 2020-0903-3398 to document a change in the scope of the ground floor remodel to eliminate the previously proposed changes to various columns and to document minor changes in the floor plans of all 3, ground floor adu's.Details
revise p/a 2020-0903-3398 to document a change in the scope of the ground floor remodel to eliminate the previously proposed changes to various columns and to document minor changes in the floor plans of all 3, ground floor adu's. | |
| Jan 13, 2026 | Completed final sign-off Feb 2026 | 1304 Lombard St | Cjc Management Group Inc. | to comply with nov 202545044: items 5-6: install handrails where missing at rear stairs.Details
to comply with nov 202545044: items 5-6: install handrails where missing at rear stairs. | $1,000 |
| Apr 28, 2023 | Completed final sign-off Feb 2024 | 1304 Lombard St | San Francisco Fire Protection | like for like fire alarm installation with notification to comply with 1103.7.6.1Details
like for like fire alarm installation with notification to comply with 1103.7.6.1 | $10,000 |
| Jan 23, 2023 | Completed final sign-off Apr 2023 | 1304 Lombard St | Global Arch Construction Inc | unit 11: remove (e) kitchen cabinets. install new kitchen cabinets and appliances. replace bath tub, water closet and sink in the same location. add new laundry units in (e) closet. new electrical receptacles and can lights. to comply with complaint 202302024.Details
unit 11: remove (e) kitchen cabinets. install new kitchen cabinets and appliances. replace bath tub, water closet and sink in the same location. add new laundry units in (e) closet. new electrical receptacles and can lights. to comply with complaint 202302024. | $45,000 |
| Jul 15, 2022 | Never finaled issued Jul 2022, no final | 1304 Lombard St | Bai Construction | revision 201706098942: seismic retrofit soft story. comply with sfebc 4d mandatory seismic retrofit per 2012 cebc appendix a4Details
revision 201706098942: seismic retrofit soft story. comply with sfebc 4d mandatory seismic retrofit per 2012 cebc appendix a4 | |
| Jun 14, 2021 | Completed final sign-off Jul 2021 | 1304 Lombard St | Bai Construction | revision to 201706098942 relocate simpson strong walls on gr flDetails
revision to 201706098942 relocate simpson strong walls on gr fl | |
| Sep 3, 2020 | Never finaled issued May 2023, no final | 1304 Lombard St | construction of three new residential units (adu) in the (e) garage space.Details
construction of three new residential units (adu) in the (e) garage space. | $450,000 | |
| Jul 10, 2020 | Expired or cancelled withdrawn May 2021 | 1304 Lombard St | Bai Construction | revision to pa# 201706098942. change location of shear walls & steel frames.Details
revision to pa# 201706098942. change location of shear walls & steel frames. | $10,000 |
| Sep 25, 2019 | Expired or cancelled withdrawn Mar 2021 | 1304 Lombard St | revision to pa# 201706098942; seismic retrofit of soft story comply with sfbbc 4d mandatory seismic retrofit per 2016 cebc appendix a4Details
revision to pa# 201706098942; seismic retrofit of soft story comply with sfbbc 4d mandatory seismic retrofit per 2016 cebc appendix a4 | ||
| Jun 9, 2017 | Completed final sign-off Jul 2021 | 1304 Lombard St | Bai Construction | mandatory soft story retrofit of groung floor according to 2016 iebc appx a4Details
mandatory soft story retrofit of groung floor according to 2016 iebc appx a4 | $50,000 |
| Mar 14, 2016 | Never finaled issued Mar 2016, no final | 1304 Lombard St | Make Ready Maintenance Inc | units 3 & 7, remodel existing kitchen and bathroom. add additional bathroom. convert livingroom to bedroom. maher naDetails
units 3 & 7, remodel existing kitchen and bathroom. add additional bathroom. convert livingroom to bedroom. maher na | $70,000 |
| Oct 6, 2004 | Never finaled issued Oct 2004, no final | 1304 Lombard St | street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bai Construction (4), Global Arch Construction Inc (2), Cjc Management Group Inc., Make Ready Maintenance Inc, San Francisco Fire Protection
- Architects
- Terryl Lofrano (3)
- Engineers
- Darren Wong (3), Darren Wong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.