Block 0121, lot 003
1933 Jones St
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 4
- Units
- 8
- Rooms
- 17 bedrooms, 8 bathrooms
- Building
- 10,000 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 8, 2024 | Completed final sign-off Nov 2024 | 1933 Jones St | Dtm Construction | (1) bathroom- demo vanity tile floor, toilet , bathtub and walls. install curbless shower and wall hung toilet . install new tile floor and tile on south and west wall. laundry room-demo vinyl floor , install new toilet, new cabinets and sinkDetails
(1) bathroom- demo vanity tile floor, toilet , bathtub and walls. install curbless shower and wall hung toilet . install new tile floor and tile on south and west wall. laundry room-demo vinyl floor , install new toilet, new cabinets and sink | $55,000 |
| Feb 5, 2024 | Expired or cancelled cancelled Mar 2024 | 1933 Jones St | bathroom- demo (e) vanity, toilet, bathtub, and tile on floors and walls. install new walkin shower and toilet on south wall. install new tile on floor and south and west walls. (plumbing work) laundry room- demo (e) vinyl flooring. install new toilet on south wall. install new cabinets and sink onDetails
bathroom- demo (e) vanity, toilet, bathtub, and tile on floors and walls. install new walkin shower and toilet on south wall. install new tile on floor and south and west walls. (plumbing work) laundry room- demo (e) vinyl flooring. install new toilet on south wall. install new cabinets and sink on | $55,000 | |
| Mar 22, 2023 | Completed final sign-off Jun 2023 | 1933 Jones St | Global Arch Construction Inc | demo (e) vanity sink in the (e) bathroom relocate it in the (e) bedroom closet demo part of the wall of the closet new walls for closet in the (e) bedroom new bathr receptacle and lightDetails
demo (e) vanity sink in the (e) bathroom relocate it in the (e) bedroom closet demo part of the wall of the closet new walls for closet in the (e) bedroom new bathr receptacle and light | $15,000 |
| Dec 17, 2020 | Completed final sign-off Dec 2021 | 1931 Jones St | Cornerstone Construction | unit #1931b: kitchen and bathroom remodel with new cabinets, countertops, fixtures, and finishesDetails
unit #1931b: kitchen and bathroom remodel with new cabinets, countertops, fixtures, and finishes | $18,000 |
| Jan 22, 2018 | Completed final sign-off Jul 2018 | 1933 Jones St | Bartley Construction | unit b: replacment of 3 street facing double hung wood windows (wood painted evergreen) with marvin double hung wood windows in-kind painted in evergreen. 9 in-kind windows non-street facing windows. same size, same location, max u-factor 0.32 n/a maherDetails
unit b: replacment of 3 street facing double hung wood windows (wood painted evergreen) with marvin double hung wood windows in-kind painted in evergreen. 9 in-kind windows non-street facing windows. same size, same location, max u-factor 0.32 n/a maher | $16,000 |
| Jun 30, 2017 | Completed final sign-off Jul 2018 | 1933 Jones St | Dugarry Construction Inc | kitchen remodeling, new bathroom, relocate laundry area, bedroom remodel, refinish existing bathroom, replace windows in kind (10) as indicated. structural, plumbing, mechanical as required/indicatedDetails
kitchen remodeling, new bathroom, relocate laundry area, bedroom remodel, refinish existing bathroom, replace windows in kind (10) as indicated. structural, plumbing, mechanical as required/indicated | $48,000 |
| Nov 13, 2014 | Completed final sign-off Feb 2015 | 1931 Jones St | Mulhall Construction Inc. | compliance with mandatory seismic retrofit program section 34b. seismic design per 2012 iebc appendix a-4. n/a ordinance #155-13Details
compliance with mandatory seismic retrofit program section 34b. seismic design per 2012 iebc appendix a-4. n/a ordinance #155-13 | $23,000 |
| Jul 6, 2012 | Never finaled issued Jul 2012, no final | 1931 Jones St | street spaceDetails
street space | ||
| Dec 27, 2011 | Completed final sign-off Feb 2012 | 1941 Jones St | Milan Construction | existing bathroom remodeling. no structural work, layout remain the same. new fixture, tiles.Details
existing bathroom remodeling. no structural work, layout remain the same. new fixture, tiles. | $8,000 |
| Mar 16, 2005 | Completed final sign-off May 2005 | 1941 Jones St | Milan Construction | (e) kitchen remodeling. no structural workDetails
(e) kitchen remodeling. no structural work | $6,000 |
| Oct 9, 2002 | Completed final sign-off Dec 2002 | 1931 Jones St | Gee Construction | install 60 liner ft of metal railing with gates on the existing roof of the wood frame buildingDetails
install 60 liner ft of metal railing with gates on the existing roof of the wood frame building | $5,000 |
| Sep 5, 2001 | Completed final sign-off Nov 2001 | 1931 Jones St | Gee Construction | addition of bolts andplywood to g/f and 1st fl levels of (e) wood frame residential building. minorDetails
addition of bolts andplywood to g/f and 1st fl levels of (e) wood frame residential building. minor | |
| Jul 13, 2001 | Completed final sign-off Nov 2001 | 1931 Jones St | Gee Construction | addition of bolts & plywood to ground & partial 1/fl. of (e) wood frame res. bldgDetails
addition of bolts & plywood to ground & partial 1/fl. of (e) wood frame res. bldg | $12,000 |
| Feb 22, 2000 | Expired or cancelled expired Jun 2000 | 1937 Jones St | Guillermo Demonty | replacement of 3 windows, repair water damage windows not visible from streetDetails
replacement of 3 windows, repair water damage windows not visible from street |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.