Kieran Boughan
- Listed as
- architect, authorized agent-others, engineer
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to Sep 2026
56 permits since 2000 (architect on 51 permits, engineer on 4 permits, authorized agent-others on 2 permits): 41 completed, 2 in progress, 8 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 2126 18th St | Creggan Construction Inc | revision to permit# 202609037660: approved current permit - 2 bathrooms + kitchen replace in kind after demo. extended scope - reconfiguration of bath walls new layout, bath + kitchen, new appliances, added shower, replace (e) stair railings new finishes.Details
revision to permit# 202609037660: approved current permit - 2 bathrooms + kitchen replace in kind after demo. extended scope - reconfiguration of bath walls new layout, bath + kitchen, new appliances, added shower, replace (e) stair railings new finishes. | $220,000 |
| Aug 20, 2024 | Completed final sign-off Aug 2024 | 342 Moultrie St | field change to 202405081649 eliminating one prev permitted ships ladder to storage loft infilling void at this area by extending e landing. reducing width of mezzanine to resuilt with infill with same permitted area. retaining other permitted ladder for storage accessDetails
field change to 202405081649 eliminating one prev permitted ships ladder to storage loft infilling void at this area by extending e landing. reducing width of mezzanine to resuilt with infill with same permitted area. retaining other permitted ladder for storage access | ||
| May 8, 2024 | Completed final sign-off Aug 2024 | 342 Moultrie St | retain and reduce existing unauthorizd mezzanine to 1/3 within e garage and access stair for storage onlyDetails
retain and reduce existing unauthorizd mezzanine to 1/3 within e garage and access stair for storage only | $7,000 | |
| Apr 17, 2024 | In progress filed Apr 2024, not yet issued | 1161 Tennessee St | interior renovation of kitchen in one condo. unit of a 3 unit building. minor demo of part of 1 partition wall. new cabinets, counter top, range, and exhaust hood. new lighting.Details
interior renovation of kitchen in one condo. unit of a 3 unit building. minor demo of part of 1 partition wall. new cabinets, counter top, range, and exhaust hood. new lighting. | $48,600 | |
| Nov 10, 2022 | Completed final sign-off Feb 2024 | 175 Valley St | Maginn Construction | addition of (1/2) bath, renovation of (e) kitchen & bath, upgrade electrical throughout, new gyp board/insulation, new windows. no addition to bldg envelope, no front facade alterationDetails
addition of (1/2) bath, renovation of (e) kitchen & bath, upgrade electrical throughout, new gyp board/insulation, new windows. no addition to bldg envelope, no front facade alteration | $390,000 |
| Feb 14, 2022 | Completed final sign-off Aug 2024 | 342 Moultrie St | permit to remove all unpermitted work in 2 car garage for use as garage. per nov.#202058938Details
permit to remove all unpermitted work in 2 car garage for use as garage. per nov.#202058938 | $91,000 | |
| May 26, 2021 | Completed final sign-off Dec 2021 | 237 Dorland St | 415 Design+Build | repair & restore (e) bathroom due to water damage. instlal underfloor heating.Details
repair & restore (e) bathroom due to water damage. instlal underfloor heating. | $24,500 |
| Oct 6, 2020 | Completed final sign-off Dec 2020 | 716 Cole St | revision to pa 201807033638. elev of a deck lowered by 15" inches. 2 risers 1 tread added, post at handrail detail modified / bent plate eliminated.Details
revision to pa 201807033638. elev of a deck lowered by 15" inches. 2 risers 1 tread added, post at handrail detail modified / bent plate eliminated. | ||
| Sep 29, 2020 | Completed final sign-off Mar 2021 | 3 Carl St | 415 Design+Build | interior kitchen remodel and wall removal between kitchen and dining room.Details
interior kitchen remodel and wall removal between kitchen and dining room. | $30,000 |
| Feb 24, 2020 | Completed final sign-off Jan 2021 | 2218 20th Av | Jpg Home Improvement Inc | legalized unpermitted space (e) in ground floor rear (study, bedroom & bath) which was damaged from plumbing leak from bathroom above. no change to exteriorDetails
legalized unpermitted space (e) in ground floor rear (study, bedroom & bath) which was damaged from plumbing leak from bathroom above. no change to exterior | $28,500 |
| Dec 10, 2019 | Completed final sign-off Dec 2021 | 1164 Alabama St | Joe Ferrante Construction | legalization of existing studio unit and c0mpliance with ord 43/14 on first floor. verify existing structure complies with lateral forces resistance per 2016 sfebc section 407 change of occupancy from r=3 to r-2.Details
legalization of existing studio unit and c0mpliance with ord 43/14 on first floor. verify existing structure complies with lateral forces resistance per 2016 sfebc section 407 change of occupancy from r=3 to r-2. | $32,000 |
| Jul 16, 2018 | Expired or cancelled expired Mar 2024 | 145 Divisadero St | Edenavow Construction & Design | rear interior renovatrion of top floor condo in 2 unit condo bldg, renovate (e) kitchen+bathroom, add closet and bathroom. no alteration to facade or exterior no addition in height of area. all work in unit 145.Details
rear interior renovatrion of top floor condo in 2 unit condo bldg, renovate (e) kitchen+bathroom, add closet and bathroom. no alteration to facade or exterior no addition in height of area. all work in unit 145. | $92,300 |
| Jul 3, 2018 | Completed final sign-off Dec 2020 | 716 Cole St | Aidan Mc Cracken Const Inc. | remove (e) rear exterior stair serving (2) flrs. replace w/ (n) stairs serving (3) flrs. add rear decks on (3) levels. raise roof on top 4th flr rear bedroom to increase bedroom area within bldg footprint.Details
remove (e) rear exterior stair serving (2) flrs. replace w/ (n) stairs serving (3) flrs. add rear decks on (3) levels. raise roof on top 4th flr rear bedroom to increase bedroom area within bldg footprint. | $97,200 |
| Mar 19, 2018 | Completed final sign-off Feb 2019 | 141 Buchanan St | Hubert Penny | renovation and minor expasion of a kitchen in a ground floor condo unit at hte rear of a 3-story, 3-unit bldg. extension adds ~39 sq ft a/c underneath an existing porch roof overhang. also, a wall is opened up in the interior between the kitchen and living room.Details
renovation and minor expasion of a kitchen in a ground floor condo unit at hte rear of a 3-story, 3-unit bldg. extension adds ~39 sq ft a/c underneath an existing porch roof overhang. also, a wall is opened up in the interior between the kitchen and living room. | $41,200 |
| May 17, 2017 | Never finaled issued Aug 2018, no final | 12 Divisadero St | Edenavow Construction & Design | addition of a (n) rear deck to the lower unit of a 2 unit bldg on 2nd flr of bldg. deck is 3'-5 1/4 x 10'-6" does not intrude into minimum rear setback. not visible from street.Details
addition of a (n) rear deck to the lower unit of a 2 unit bldg on 2nd flr of bldg. deck is 3'-5 1/4 x 10'-6" does not intrude into minimum rear setback. not visible from street. | $9,750 |
| Mar 17, 2017 | Never finaled issued Apr 2017, no final | 12 Divisadero St | Edenavow Construction & Design | renovation of lower unit of a 2 unit building. conversion of extg storage into habitable-family room with new connecting interior stair. add bathroom renovate kitchen. minor modification to rear door and window. sprinkler new spaces will be seperate permit.Details
renovation of lower unit of a 2 unit building. conversion of extg storage into habitable-family room with new connecting interior stair. add bathroom renovate kitchen. minor modification to rear door and window. sprinkler new spaces will be seperate permit. | $148,000 |
| Feb 2, 2017 | Expired or cancelled expired Dec 2019 | 2053 Ellis St | Edenavow Construction & Design | to comply with nov 201649062, rebuild of (e) front wood stair in-kind under sf historic building codeDetails
to comply with nov 201649062, rebuild of (e) front wood stair in-kind under sf historic building code | $31,400 |
| May 20, 2016 | Completed final sign-off Aug 2016 | 136 Acadia St | Edenavow Construction & Design | addition of a rear deck on top of an (e) roof at the 2nd floor.Details
addition of a rear deck on top of an (e) roof at the 2nd floor. | $11,700 |
| May 20, 2015 | Completed final sign-off Jul 2015 | 1186 Folsom St | Gech Inc. | installation of 3 private offices within an existing interior office on 2nd fl. compliance with maher ordinance no. 155-13 not required.Details
installation of 3 private offices within an existing interior office on 2nd fl. compliance with maher ordinance no. 155-13 not required. | $11,700 |
| May 12, 2015 | Never finaled issued Feb 2016, no final | 38 Crescent Av | Douglas Cleaveland | int. renovation - add family room @ basement; 1st flr add master suite, office, media room & full bath, add side door w/railing. upper 2nd floor replace interior stairway. structural, interior improvements to plumbing, electrical, hvac & finishes. no change to occupancy, building envelope.Details
int. renovation - add family room @ basement; 1st flr add master suite, office, media room & full bath, add side door w/railing. upper 2nd floor replace interior stairway. structural, interior improvements to plumbing, electrical, hvac & finishes. no change to occupancy, building envelope. | $100,000 |
| Dec 2, 2014 | Completed final sign-off Feb 2020 | 489 Day St | Barker-O'donoghue Master Bldrs, Gech Inc. | conversion of lower level storage to habitable space includes bathrm, bedrm & laudry. addition to rear of of 15' deep. addition housing bedroom & bath. add new interior stair. no alteration to front or bldg height.Details
conversion of lower level storage to habitable space includes bathrm, bedrm & laudry. addition to rear of of 15' deep. addition housing bedroom & bath. add new interior stair. no alteration to front or bldg height. | $148,000 |
| Aug 29, 2014 | Completed final sign-off May 2015 | 1186 Folsom St | Gech Inc. | interior renovation of existing 2nd flr business/office space, install 2 new restrooms, new duct work for (e) furnace, no exterior work, no increase in floor area, no change to facade; maher n/aDetails
interior renovation of existing 2nd flr business/office space, install 2 new restrooms, new duct work for (e) furnace, no exterior work, no increase in floor area, no change to facade; maher n/a | $68,400 |
| Aug 11, 2014 | Completed final sign-off May 2015 | 1186 Folsom St | Gech Inc. | 2nd floor - interior demo of interior non load bearing walls, demo of (e) toilet & break rooms, removal of dropped ceiling, removal of 1/4 plywood interior perimeter walls, removal of (e) carpet & vinyl tile; maher n/aDetails
2nd floor - interior demo of interior non load bearing walls, demo of (e) toilet & break rooms, removal of dropped ceiling, removal of 1/4 plywood interior perimeter walls, removal of (e) carpet & vinyl tile; maher n/a | $9,300 |
| Jun 13, 2014 | Expired or cancelled expired Jun 2019 | 451 Sanchez St | H T H Construction | remove (e) stair + deck, replace w/code complying decks + stairs within allowed rear set back + height req'ments. no alteration to facade no change to bldg height. no increase in enclosed floor area.Details
remove (e) stair + deck, replace w/code complying decks + stairs within allowed rear set back + height req'ments. no alteration to facade no change to bldg height. no increase in enclosed floor area. | $42,300 |
| Feb 28, 2014 | Completed final sign-off May 2014 | 712 10th Av | Gech Inc. | renovation of front of 2 unit residence. restore attic window, restore shingle, restore conice. add trim modify balustrade. " work in common"Details
renovation of front of 2 unit residence. restore attic window, restore shingle, restore conice. add trim modify balustrade. " work in common" | $22,400 |
| Oct 22, 2013 | Completed final sign-off Jun 2014 | 451 Sanchez St | Gech Inc. | minor interior remodel on 1st floor flat-add half bathroom with washer/dryer, remodel kitchen, replacing windows, not visible from the streetDetails
minor interior remodel on 1st floor flat-add half bathroom with washer/dryer, remodel kitchen, replacing windows, not visible from the street | $21,000 |
| Sep 26, 2013 | Completed final sign-off Aug 2014 | 4102 19th St | F J S Construction | expansion of (e) street level barber shop into adjacent vacant retail space, minor plumbing, electrical, installation of wheelchair access lift.Details
expansion of (e) street level barber shop into adjacent vacant retail space, minor plumbing, electrical, installation of wheelchair access lift. | $26,000 |
| Jul 19, 2013 | Never finaled issued Mar 2016, no final | 181 Eddy St | interior modifications to resolve fire code issue on 2nd floor of 2 story building. the location is the 2nd flr of a 2 story commercial building in the tenenderloin dest. of s.f. all work is within the building interior, no alteration to the facades are involved.Details
interior modifications to resolve fire code issue on 2nd floor of 2 story building. the location is the 2nd flr of a 2 story commercial building in the tenenderloin dest. of s.f. all work is within the building interior, no alteration to the facades are involved. | $5,100 | |
| Jun 18, 2013 | Completed final sign-off Jun 2013 | 336 Day St | Andes General Construction | minor revisions to permit #201303081800; adding a skylight, enlarging an attic access hatch, in (e) kitchen ceiling-adding a 4x4 post in (e) wall minor enlargement of (e) opening in interior wall from 1'-o" wide to 1'-8" wideDetails
minor revisions to permit #201303081800; adding a skylight, enlarging an attic access hatch, in (e) kitchen ceiling-adding a 4x4 post in (e) wall minor enlargement of (e) opening in interior wall from 1'-o" wide to 1'-8" wide | $3,000 |
| Mar 8, 2013 | Completed final sign-off Jul 2013 | 336 Day St | Andes General Construction | renovation of a kitchen & bath within a single family home, removal of one existing side window (facing lightwell), electricla & plumbing involved.Details
renovation of a kitchen & bath within a single family home, removal of one existing side window (facing lightwell), electricla & plumbing involved. | $75,000 |
| Jan 4, 2013 | Completed final sign-off Jan 2014 | 2 Atalaya Tr | Gech Inc. | installation of a new metal 6'-0" high gate and side railing in the sidewalkway of a s.f.d. residence in san francisco.Details
installation of a new metal 6'-0" high gate and side railing in the sidewalkway of a s.f.d. residence in san francisco. | $1,100 |
| Jul 23, 2012 | Completed final sign-off Apr 2013 | 2 Atalaya Tr | Gech Inc. | interior renovation @ 2nd & 3rd floor - remodeling (e) kitchen , (e) powder room, (e) bathroom, replace washer/dryer, add new bathroom within bldg envelope, additional outlets & lighting.Details
interior renovation @ 2nd & 3rd floor - remodeling (e) kitchen , (e) powder room, (e) bathroom, replace washer/dryer, add new bathroom within bldg envelope, additional outlets & lighting. | $114,000 |
| Mar 14, 2012 | Completed final sign-off May 2012 | 431 Dolores St | Boaz Mor Design & Construction | to comply with complaint #201188326. repair exisitng rear stair in kind less than 50% of structure.Details
to comply with complaint #201188326. repair exisitng rear stair in kind less than 50% of structure. | $19,700 |
| Jan 27, 2012 | Completed final sign-off May 2012 | 1326 31st Av | Gech Inc. | comply with nov 201177881,dated 1-5-12 . remove illegal kitchen. legalize bottom bathroom, bedroom, family room, and laundryDetails
comply with nov 201177881,dated 1-5-12 . remove illegal kitchen. legalize bottom bathroom, bedroom, family room, and laundry | $16,500 |
| Apr 12, 2011 | Completed final sign-off Jan 2012 | 455 Hoffman Av | Jjj & K Inc./Dba: Alexander Company | replace sunroom from dry rot to comply with notice of violation #200846630Details
replace sunroom from dry rot to comply with notice of violation #200846630 | $30,000 |
| Mar 31, 2011 | Completed final sign-off Apr 2011 | 21 Alpine Tr | Andes General Construction | installation of washer and dryer. addition of hall closet. minor elec work. interior trim work,Details
installation of washer and dryer. addition of hall closet. minor elec work. interior trim work, | $10,500 |
| Jul 6, 2010 | Completed final sign-off Sep 2011 | 160 Otsego Av | Andes General Construction | expansion of (e) rear yard deck. addition of an open sided roof, glazed, over (e) & new deck. installation of outside gas fed fireplace & bbq counter with grille & smoker. no increase in height, no alteration to front, no interior changes.Details
expansion of (e) rear yard deck. addition of an open sided roof, glazed, over (e) & new deck. installation of outside gas fed fireplace & bbq counter with grille & smoker. no increase in height, no alteration to front, no interior changes. | $15,000 |
| May 4, 2010 | Completed final sign-off Oct 2010 | 164 Otsego Av | Andes General Construction | revision to previous permit #200907011767. increase (e) stair width each level to 3'-0" wide.Details
revision to previous permit #200907011767. increase (e) stair width each level to 3'-0" wide. | $3,000 |
| Dec 4, 2009 | Completed final sign-off Apr 2010 | 1653 Alabama St | Grey Gates Construction | renovation of ground level of 2 story/ 2 unit building. enlarge lower unit into (e) garage area keeping 2 garage spaces. no height or building envelope increasesDetails
renovation of ground level of 2 story/ 2 unit building. enlarge lower unit into (e) garage area keeping 2 garage spaces. no height or building envelope increases | $33,000 |
| Sep 1, 2009 | Completed final sign-off Dec 2009 | 89 Chattanooga St | Andes General Construction | renovation of 2nd fl apt in a 2 story bldg w/commercial below. renovate kitchen and bath. remove 2 non bearing interior partition walls. remove dropped ceiling. add recessed cans.Details
renovation of 2nd fl apt in a 2 story bldg w/commercial below. renovate kitchen and bath. remove 2 non bearing interior partition walls. remove dropped ceiling. add recessed cans. | $23,000 |
| Jul 1, 2009 | Completed final sign-off Oct 2010 | 164 Otsego Av | Andes General Construction | addition to rear of residence (120 sq.ft.) at living level, new rear deck (130 sq. ft.) to be added. kitchen + bath remodel on living level. new dormer on rear upper level-remodel bath + bedrooms, new interior stair to connect to ground level.Details
addition to rear of residence (120 sq.ft.) at living level, new rear deck (130 sq. ft.) to be added. kitchen + bath remodel on living level. new dormer on rear upper level-remodel bath + bedrooms, new interior stair to connect to ground level. | $150,000 |
| Oct 30, 2008 | Completed final sign-off May 2010 | 3940 Cabrillo St | construction of a new roof deck at roof of (e) bldg; construction of roof level stair enclosure to accommodate extending the (e) stair from (e) upper level to roof. no rear extension or alteration, no front extension or alteration, no work @ ground floor, no work @ (e) upper level apart from stair.Details
construction of a new roof deck at roof of (e) bldg; construction of roof level stair enclosure to accommodate extending the (e) stair from (e) upper level to roof. no rear extension or alteration, no front extension or alteration, no work @ ground floor, no work @ (e) upper level apart from stair. | $30,000 | |
| Sep 22, 2008 | Completed final sign-off Aug 2009 | 336 Day St | Andes General Construction | two story rear addition to (e) dwelling w/ interior stair & exterior stairs, deck and patio, lower level bedroom & study rm, upper level family room.Details
two story rear addition to (e) dwelling w/ interior stair & exterior stairs, deck and patio, lower level bedroom & study rm, upper level family room. | $130,000 |
| Aug 14, 2008 | Completed final sign-off Apr 2010 | 646 03rd Av | Occidental Express | repair foundation, add dormer @ roof. replace (e) steep stair from bedroom level. to top floor with code complaint. top floor (e) home office to be remodeled to accomm bedroom & bathroom. construct 4 skylights. sprinkler for 4th floor under seperate permit.Details
repair foundation, add dormer @ roof. replace (e) steep stair from bedroom level. to top floor with code complaint. top floor (e) home office to be remodeled to accomm bedroom & bathroom. construct 4 skylights. sprinkler for 4th floor under seperate permit. | $80,000 |
| Jun 24, 2008 | Never finaled issued Jun 2008, no final | 3940 Cabrillo St | renovation of 2 story residence. ground fl: retain 1 parking spot, add 2 new full baths, 2 new bedrooms, family room, laundry, patio. remodel interior stair. 2nd fl: remodel kitchen and bath, infill upper recess, 2 new skylights at roof. 1 new front window, 2 new french doors at ground level rear.Details
renovation of 2 story residence. ground fl: retain 1 parking spot, add 2 new full baths, 2 new bedrooms, family room, laundry, patio. remodel interior stair. 2nd fl: remodel kitchen and bath, infill upper recess, 2 new skylights at roof. 1 new front window, 2 new french doors at ground level rear. | $150,000 | |
| May 23, 2008 | Completed final sign-off Jan 2009 | 1653 Alabama St | upper unit (2nd floor): remodel kitchen, add bathroom, small roof area 6' x 8' infilled at bathrooms, add 2 new skylights (3 x 4), combine 2 rooms into 1 room at rear. no work on lower unit/garage. no alteration to street facades.Details
upper unit (2nd floor): remodel kitchen, add bathroom, small roof area 6' x 8' infilled at bathrooms, add 2 new skylights (3 x 4), combine 2 rooms into 1 room at rear. no work on lower unit/garage. no alteration to street facades. | $80,000 | |
| Mar 3, 2008 | Never finaled issued Mar 2008, no final | 347 Grant Av | Trevor Doherty Electric Inc | tenant improvement for retail space. m/e/p under separate permit. ref. p/a #2007.07.23.7433 for added stair and accessible elevator and accessible restrooms.Details
tenant improvement for retail space. m/e/p under separate permit. ref. p/a #2007.07.23.7433 for added stair and accessible elevator and accessible restrooms. | $100,000 |
| Mar 3, 2008 | Never finaled issued Mar 2008, no final | 534 10th Av | repair of exterior brick entry stair walls at both porches. restoration of porch detailing above entry (porch "a"). replacement of crude wood railings with metal railings at stair on both porches. upper door at porch replace with window.Details
repair of exterior brick entry stair walls at both porches. restoration of porch detailing above entry (porch "a"). replacement of crude wood railings with metal railings at stair on both porches. upper door at porch replace with window. | $11,000 | |
| Dec 31, 2007 | Completed final sign-off Sep 2009 | 1956 Fell St | replace ex. 3 interior stairs with 1 stair with new hallway. construct a new garage in the ex. stoeage space on the ground floor. construct new exterior stairs and deck at rear. replace ex. bricks with new and shingles on the front facade. enlarge front windows and replace rear windows in kind.Details
replace ex. 3 interior stairs with 1 stair with new hallway. construct a new garage in the ex. stoeage space on the ground floor. construct new exterior stairs and deck at rear. replace ex. bricks with new and shingles on the front facade. enlarge front windows and replace rear windows in kind. | $350,000 | |
| Sep 24, 2007 | Expired or cancelled expired Jun 2013 | 2857 22nd St | site plan for lower level of 2 story bldg. to install a new residential unit with patio in present warehouse space. zoned as rh3 and the warehouse was approved under a planning conditional use expired. upper unit renovation,garage & facade work are under separate permit.Details
site plan for lower level of 2 story bldg. to install a new residential unit with patio in present warehouse space. zoned as rh3 and the warehouse was approved under a planning conditional use expired. upper unit renovation,garage & facade work are under separate permit. | $75,000 | |
| Sep 11, 2007 | Completed final sign-off Jul 2009 | 223 Lisbon St | Andes General Construction | front building-expansion of ex. single car garage with storage to 2 car garage with studio aboveDetails
front building-expansion of ex. single car garage with storage to 2 car garage with studio above | $90,000 |
| Sep 11, 2007 | Expired or cancelled expired Jul 2016 | 223 Lisbon St | Andes General Construction | rear building-renovation of ex. 2 story cottage within the ex. envelopeDetails
rear building-renovation of ex. 2 story cottage within the ex. envelope | $90,000 |
| May 8, 2007 | Completed final sign-off Jun 2009 | 261 Diamond St | addition of a bathroom at rear ground level underneath upper floor extg extended portion of building. addition of a window and side doors. removal of a non bearing wall. sprinkler new work under separate permitDetails
addition of a bathroom at rear ground level underneath upper floor extg extended portion of building. addition of a window and side doors. removal of a non bearing wall. sprinkler new work under separate permit | $30,000 | |
| Jul 6, 2006 | Completed final sign-off Aug 2007 | 474 17th Av | renovation of existing bathroom,add new bathroom, construction of storage areas within existing garage. no addition to buidling. widening of garage door by 1'3".Details
renovation of existing bathroom,add new bathroom, construction of storage areas within existing garage. no addition to buidling. widening of garage door by 1'3". | $60,000 | |
| Jun 2, 2005 | Completed final sign-off Oct 2005 | 3881 21st St | repair of (e) front deck & staris to cure water penetration problem by installation of waterproofDetails
repair of (e) front deck & staris to cure water penetration problem by installation of waterproof | $21,300 | |
| May 24, 2004 | Never finaled issued Oct 2004, no final | 706 23rd Av | renovation of rear of grd floor within (e0 bldg envelope to provide 3 bedrooms, bathroom & storage lDetails
renovation of rear of grd floor within (e0 bldg envelope to provide 3 bedrooms, bathroom & storage l | $55,000 |