Block 2695, lot 016
598 Castro St
- City’s use
- Multi-Family Residential
- Built
- 1885
- Stories
- 3
- Units
- 7
- Rooms
- 8 bathrooms
- Building
- 6,540 sq ft
- Lot
- 2,421 sq ft
- Zoning
- CASTRO
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
36 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 28, 2025 | In progress filed Jan 2025, not yet issued | 598 Castro St | t mobile: remove e antenna and micro cabinets, install 6 new antennas, 2 new cabinets, new batteries, new 200 a elec panelDetails
t mobile: remove e antenna and micro cabinets, install 6 new antennas, 2 new cabinets, new batteries, new 200 a elec panel | $115,000 | |
| Jun 17, 2024 | Completed final sign-off Aug 2024 | 598 Castro St | W M Wireless Inc | temp addition of t-mobile equipmnent at (e) site to provide additional coverage for pride parade. temp install (6) panel antenna, (2) rrus, cabinet, (2) hybrid cables and 30amp breaker at (e) panel. no batteries. temp service will be from june 17-july 5, 2024.Details
temp addition of t-mobile equipmnent at (e) site to provide additional coverage for pride parade. temp install (6) panel antenna, (2) rrus, cabinet, (2) hybrid cables and 30amp breaker at (e) panel. no batteries. temp service will be from june 17-july 5, 2024. | $5,000 |
| May 1, 2024 | Completed final sign-off Oct 2024 | 598 Castro St | Rei Build Up Construction Corp, Deluxe Shotcrete & Concrete Construction | to comply w/ nov #202311345: replace less than 100 sf of non structural (e) concrete slab in kind or better limited to commercial space repair stair tread (less than 50%)Details
to comply w/ nov #202311345: replace less than 100 sf of non structural (e) concrete slab in kind or better limited to commercial space repair stair tread (less than 50%) | $15,000 |
| May 22, 2023 | Completed final sign-off Jul 2023 | 598 Castro St | temporary addition of temporary cellular equipment to support the additional network demand and to provide continued emergency e-911 coverage during pride parade (antennas).Details
temporary addition of temporary cellular equipment to support the additional network demand and to provide continued emergency e-911 coverage during pride parade (antennas). | $5,000 | |
| Jun 13, 2022 | Completed final sign-off Aug 2022 | 598 Castro St | W M Wireless Inc | temporary additon of temporary equipment to support the additonal network demand and to provide continued emergency e-911 coverage during pride parade (t-mobile).Details
temporary additon of temporary equipment to support the additonal network demand and to provide continued emergency e-911 coverage during pride parade (t-mobile). | $5,000 |
| Dec 31, 2019 | Never finaled issued Dec 2021, no final | 598 Castro St | Tot'l Environm'l /Pwer Sym Inc Dba:Teps | install safety guardrail, safety gate, around (e) roof hatch, skylight guards, crossover ladder, and fall arrest anchors at roof.Details
install safety guardrail, safety gate, around (e) roof hatch, skylight guards, crossover ladder, and fall arrest anchors at roof. | $5,000 |
| Jun 18, 2019 | Completed final sign-off Jul 2019 | 598 Castro St | Walker Cellular Inc | t-mobile temporary installation of wireless facility for pride parade special event at roof.Details
t-mobile temporary installation of wireless facility for pride parade special event at roof. | $5,000 |
| Jan 13, 2014 | Completed final sign-off Nov 2014 | 4102 19th St | F J S Construction | revision to pa#2013 0926 7877. removal of wheel chair lift form original plans.Details
revision to pa#2013 0926 7877. removal of wheel chair lift form original plans. | |
| Nov 27, 2013 | Never finaled issued Nov 2013, no final | 4102 19th St | street spaceDetails
street space | ||
| Sep 26, 2013 | Completed final sign-off Aug 2014 | 4102 19th St | F J S Construction | expansion of (e) street level barber shop into adjacent vacant retail space, minor plumbing, electrical, installation of wheelchair access lift.Details
expansion of (e) street level barber shop into adjacent vacant retail space, minor plumbing, electrical, installation of wheelchair access lift. | $26,000 |
| May 17, 2011 | Completed final sign-off Jun 2011 | 590 Castro St | Details
| ||
| Oct 6, 2010 | Completed final sign-off Aug 2011 | 598 Castro St | Transceive Communications Inc. | installation of tower-mounted amplifiers at an existing legal t-mobile facility.Details
installation of tower-mounted amplifiers at an existing legal t-mobile facility. | $9,000 |
| Sep 30, 2010 | Never finaled issued Sep 2010, no final | 590 Castro St | street spaceDetails
street space | ||
| Sep 27, 2010 | Never finaled issued Sep 2010, no final | 590 Castro St | sidewalkDetails
sidewalk | ||
| Jul 26, 2010 | Never finaled issued Jul 2010, no final | 590 Castro St | street space permitDetails
street space permit | ||
| May 17, 2010 | Never finaled issued May 2010, no final | 590 Castro St | street space and mta parkingDetails
street space and mta parking | ||
| Apr 20, 2010 | Completed final sign-off Jan 2011 | 590 Castro St | Steven Yeung Inc Dba Chung Wah Plbg&Fire | as builts to reflect changes to main service location for fire sprinkler system, changed connection of 4" fire service from main on castro to main on 19th st. also revised pipes sizes in basement from 3" to 2-1/2" ref to pa#200906261401Details
as builts to reflect changes to main service location for fire sprinkler system, changed connection of 4" fire service from main on castro to main on 19th st. also revised pipes sizes in basement from 3" to 2-1/2" ref to pa#200906261401 | |
| Mar 26, 2010 | Never finaled issued Mar 2010, no final | 590 Castro St | request to add/verify the addresses on the side of castro st. for blk 2695 lot 016. #590 castro st - front unit on 3/f, #590a castro st - rear unit on 3/f, #592 castro st - front unit on 2/f, #592a castro st. - rear unit on 2/f, #598 castro st - commercial on ground floorDetails
request to add/verify the addresses on the side of castro st. for blk 2695 lot 016. #590 castro st - front unit on 3/f, #590a castro st - rear unit on 3/f, #592 castro st - front unit on 2/f, #592a castro st. - rear unit on 2/f, #598 castro st - commercial on ground floor | ||
| Mar 26, 2010 | Never finaled issued Mar 2010, no final | 4100 19th St | request to add/verify addresses on the side of the 19th street for block #2695 lot 016. (#4100 and #4102 - 19th street for the two commercial with entrances facing 19th street.Details
request to add/verify addresses on the side of the 19th street for block #2695 lot 016. (#4100 and #4102 - 19th street for the two commercial with entrances facing 19th street. | ||
| Mar 12, 2010 | Completed final sign-off Feb 2011 | 590 Castro St | San Francisco Fire Protection | install 1-fire panel, 5-smoke detectors, 1-nanual pull, 12-horns, 9-horn/strobes, 3-strobes & 2-point modules.Details
install 1-fire panel, 5-smoke detectors, 1-nanual pull, 12-horns, 9-horn/strobes, 3-strobes & 2-point modules. | $12,000 |
| Jan 4, 2010 | Never finaled issued Jan 2010, no final | 590 Castro St | streetspaceDetails
streetspace | ||
| Nov 30, 2009 | Never finaled issued Nov 2009, no final | 590 Castro St | street space permitDetails
street space permit | ||
| Oct 29, 2009 | Never finaled issued Oct 2009, no final | 590 Castro St | street space and mta parkingDetails
street space and mta parking | ||
| Sep 9, 2009 | Never finaled issued Sep 2009, no final | 590 Castro St | street space & mtaDetails
street space & mta | ||
| Jun 26, 2009 | Completed final sign-off Jan 2011 | 590 Castro St | Steven Yeung Inc Dba Chung Wah Plbg&Fire | install sprinkler system for entire builidng. total 171 heads. and underground ref. pa# 200603156751 for arch, struc and mech plans.Details
install sprinkler system for entire builidng. total 171 heads. and underground ref. pa# 200603156751 for arch, struc and mech plans. | $20,000 |
| Sep 19, 2006 | Never finaled issued Sep 2006, no final | 590 Castro St | sidewalk permitDetails
sidewalk permit | ||
| Mar 28, 2006 | Completed final sign-off Feb 2007 | 598 Castro St | Ccr Builders Inc.**See Note*** | installation of microcell antenna, associated equipment and wiring and able tray. antenna concealed in faux vent. no batteries.Details
installation of microcell antenna, associated equipment and wiring and able tray. antenna concealed in faux vent. no batteries. | $25,000 |
| Mar 15, 2006 | Completed final sign-off Feb 2011 | 590 Castro St | convert (e) 2 units on 2nd & 3rd floors into 4 units. no change to ground floor commercial use. replace all exterior windows fill lighwell. comply with nov 200447850.Details
convert (e) 2 units on 2nd & 3rd floors into 4 units. no change to ground floor commercial use. replace all exterior windows fill lighwell. comply with nov 200447850. | $80,000 | |
| May 2, 2005 | Completed final sign-off May 2005 | 4102 19th St | Seth Bernstein | renew app 200408030441 for finalDetails
renew app 200408030441 for final | |
| Aug 3, 2004 | Never finaled issued Aug 2004, no final | 4100 19th St | address assignmentDetails
address assignment | ||
| Aug 3, 2004 | Never finaled issued Aug 2004, no final | 4102 19th St | address assignmentDetails
address assignment | ||
| Aug 3, 2004 | Expired or cancelled expired Jan 2011 | 4102 19th St | Seth Bernstein | installing 3 sinks and water heater, replacing lights, switches, & outlets on g/f retail areaDetails
installing 3 sinks and water heater, replacing lights, switches, & outlets on g/f retail area | $5,000 |
| Jun 29, 2004 | Expired or cancelled cancelled Jun 2005 | 590 Castro St | change residential @ 2nd floor to office.Details
change residential @ 2nd floor to office. | ||
| Jun 21, 2004 | Completed final sign-off Sep 2004 | 590 Castro St | open doors from bathroom to side court behind building, local equiv. filedDetails
open doors from bathroom to side court behind building, local equiv. filed | $3,000 | |
| Mar 3, 2004 | Expired or cancelled expired Jun 2011 | 590 Castro St | change of use only. no construction for this permit.Details
change of use only. no construction for this permit. | ||
| Feb 10, 2004 | Completed final sign-off Mar 2004 | 590 Castro St | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $15,300 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.