Van Ly
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Van T. Ly & Associates
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Apr 2025
198 permits since 2000 (architect on 181 permits, authorized agent-others on 16 permits, designer on 4 permits, engineer on 3 permits, pmt consultant/expediter on 1 permit): 101 completed, 5 in progress, 43 never finaled, 49 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 198.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 25, 2025 | In progress issued Nov 2025 | 2114 35th Av | Alwyn Construction Inc | 1/f: remove all un-permitted habitable space, interior walls, and subfloor, replace (e) rear window and door in-kind. 2/f: remodel (e) kitchen in-kind, remodel (e) bathroom in-kind, add 1 full bathroom, remove (e) front rotten balcony, replace (e) rear patio door and windows in-kind.Details
1/f: remove all un-permitted habitable space, interior walls, and subfloor, replace (e) rear window and door in-kind. 2/f: remodel (e) kitchen in-kind, remodel (e) bathroom in-kind, add 1 full bathroom, remove (e) front rotten balcony, replace (e) rear patio door and windows in-kind. | $135,000 |
| Feb 20, 2024 | Completed final sign-off Feb 2026 | 2 Lupine Av | develope (e) utility basement of the (e) single family dwelling into an attached adu per state program:install (n) kitchen with a living,dining,kitchen,room.install (n) bedroom with full bath.install detached pre-fab 4'6" x 5' x 6'ht utility shed at (e) exterior concrete patio.Details
develope (e) utility basement of the (e) single family dwelling into an attached adu per state program:install (n) kitchen with a living,dining,kitchen,room.install (n) bedroom with full bath.install detached pre-fab 4'6" x 5' x 6'ht utility shed at (e) exterior concrete patio. | $40,000 | |
| Dec 28, 2023 | Completed final sign-off Mar 2025 | 14 University St | revision to pa# 202008081377. skylight & windows size modification. add laundry closet on 2nd fl. replace (e) 2nd fl wood balcony to metal planter at front. replace (e)/approved siding by stucco to entire building wall to match adjacent buildings. replace (e) 2nd fl fireplace with gas fireplace.Details
revision to pa# 202008081377. skylight & windows size modification. add laundry closet on 2nd fl. replace (e) 2nd fl wood balcony to metal planter at front. replace (e)/approved siding by stucco to entire building wall to match adjacent buildings. replace (e) 2nd fl fireplace with gas fireplace. | $5,000 | |
| Aug 1, 2023 | Completed final sign-off Aug 2023 | 85 Pope St | revision to 201908279964. eliminate utility closet. fill (e) door opening. relocate (e) approved furnace & water heater in garage.Details
revision to 201908279964. eliminate utility closet. fill (e) door opening. relocate (e) approved furnace & water heater in garage. | $1,000 | |
| Apr 26, 2023 | Completed final sign-off Sep 2024 | 2284 Cayuga Av | new 2nd floor rear deck and stair to ground, replace two (e) 2nd floor rear windows to patio doors.Details
new 2nd floor rear deck and stair to ground, replace two (e) 2nd floor rear windows to patio doors. | $5,000 | |
| Feb 27, 2023 | Never finaled filed Feb 2023, never issued | 323 Divisadero St | new meditation center renovation in existing tenant space on 1st and 2nd floor including accessibility upgrading of primary entrance and toilet on the 1st floor and constructing two exterior rear stairs.Details
new meditation center renovation in existing tenant space on 1st and 2nd floor including accessibility upgrading of primary entrance and toilet on the 1st floor and constructing two exterior rear stairs. | $197,000 | |
| Dec 6, 2022 | In progress issued Oct 2024 | 745 Vienna St | erect a detached 2-story, type vb, 1-unit adu at rear, per govt. code sec. 6585.2.(a)-(d). demolition of detached rear structure under pa# 202212067785.Details
erect a detached 2-story, type vb, 1-unit adu at rear, per govt. code sec. 6585.2.(a)-(d). demolition of detached rear structure under pa# 202212067785. | $120,000 | |
| Dec 6, 2022 | In progress issued Oct 2024 | 745 Vienna St | demolition of 1-story, type vb, detached cottage at rear. new construction of adu under pa# 202212067784.Details
demolition of 1-story, type vb, detached cottage at rear. new construction of adu under pa# 202212067784. | $18,000 | |
| Nov 7, 2022 | Expired or cancelled expired Oct 2024 | 873 Capp St | remove fire damaged front stair of the front building. new front stair to preserve original size shape & finish material. to comply with nov #202293666.Details
remove fire damaged front stair of the front building. new front stair to preserve original size shape & finish material. to comply with nov #202293666. | $15,000 | |
| Sep 8, 2022 | Completed final sign-off Feb 2024 | 3732 Rivera St | Shamrock Engineering Concrete | front bldg structure: rev to 201711164180. relocate shear wall@ line 2Details
front bldg structure: rev to 201711164180. relocate shear wall@ line 2 | $5,000 |
| Sep 8, 2022 | Completed final sign-off Feb 2024 | 3732 Rivera St | Shamrock Engineering Concrete | rear bldg structure: clarification to inspection correction note dated 8/22/2022 replace rear stair retaining wall and north and west property lines opening at existing building rear wall to be replaced. original permit 202001141833. exterior work only.Details
rear bldg structure: clarification to inspection correction note dated 8/22/2022 replace rear stair retaining wall and north and west property lines opening at existing building rear wall to be replaced. original permit 202001141833. exterior work only. | $5,000 |
| Jan 13, 2022 | Completed final sign-off Jun 2023 | 1448 Pine St | revision to bpa#202003046176: add a home office room to the approved 2nd floor adu unit 201.Details
revision to bpa#202003046176: add a home office room to the approved 2nd floor adu unit 201. | $1,000 | |
| Jan 13, 2022 | Completed final sign-off Jun 2023 | 1448 Pine St | revision to bpa#202003046177: add a home office room to the approved 2nd floor adu unit 202.Details
revision to bpa#202003046177: add a home office room to the approved 2nd floor adu unit 202. | $1,000 | |
| Oct 19, 2021 | Completed final sign-off Sep 2023 | 4139 Anza St | revision of 2017 0922 9356: renovate (e) exit passage way to have 3' width, 1-hr rated finishes. reswing doors & add a bike closet. (n) furnace tankless water heaters & laundry locationsDetails
revision of 2017 0922 9356: renovate (e) exit passage way to have 3' width, 1-hr rated finishes. reswing doors & add a bike closet. (n) furnace tankless water heaters & laundry locations | $8,000 | |
| Mar 11, 2021 | Never finaled issued Jun 2023, no final | 31 Houston St | Ordway Construction Inc. | (e) is a residential three-story structure: third floor has 3 dwelling units, second floor has 3 dwelling units, first floor has one-car garage, storage spaces, and one dwelling unit. convert (e) 1st floor garage and storage area into (2) new adu per ord. #162-16. total of nine units.Details
(e) is a residential three-story structure: third floor has 3 dwelling units, second floor has 3 dwelling units, first floor has one-car garage, storage spaces, and one dwelling unit. convert (e) 1st floor garage and storage area into (2) new adu per ord. #162-16. total of nine units. | $200,000 |
| Aug 8, 2020 | Completed final sign-off Mar 2025 | 14 University St | Greatwall Building Construction Inc | develop new adu per ordinance 95-17 on 1st floor with 7'10" 1st floor rear addition, 216 sf. existing 2nd floor dwelling unit renovation with new 1st floor roof deck and stair to yard.Details
develop new adu per ordinance 95-17 on 1st floor with 7'10" 1st floor rear addition, 216 sf. existing 2nd floor dwelling unit renovation with new 1st floor roof deck and stair to yard. | $200,000 |
| Mar 4, 2020 | Completed final sign-off Jun 2023 | 1448 Pine St | convert (e) office condo #202 into (n) residential adu as per ord #162-16.Details
convert (e) office condo #202 into (n) residential adu as per ord #162-16. | $20,000 | |
| Mar 4, 2020 | Completed final sign-off Jun 2023 | 1448 Pine St | convert (e) office condo #201 into (n) residential adu as per ordinance #162-16.Details
convert (e) office condo #201 into (n) residential adu as per ordinance #162-16. | $20,000 | |
| Mar 4, 2020 | Expired or cancelled expired Aug 2023 | 85 Pope St | F C Company | legalize 2nd floor wd deck & partial building envelope which were not shown on 2004 sanborn map. (site permit only)Details
legalize 2nd floor wd deck & partial building envelope which were not shown on 2004 sanborn map. (site permit only) | $5,000 |
| Feb 21, 2020 | Completed final sign-off Jun 2020 | 2231 14th Av | Randy's Construction | existing 1st floor bathroom renovation: enlarge (e) shower.Details
existing 1st floor bathroom renovation: enlarge (e) shower. | $5,000 |
| Feb 18, 2020 | Completed final sign-off May 2021 | 766 30th Av | Sfba Construction Inc | revision to app#201902213528: interior re-arrangement only. new opening between kitchen and dining on 2nd floor.Details
revision to app#201902213528: interior re-arrangement only. new opening between kitchen and dining on 2nd floor. | $3,000 |
| Jan 17, 2020 | Never finaled issued Jan 2020, no final | 5646 Mission St | revision to app#201601137006. relocate toilet room on 2nd floor within the multi-function room. add shower to toilet room.Details
revision to app#201601137006. relocate toilet room on 2nd floor within the multi-function room. add shower to toilet room. | $500 | |
| Jan 14, 2020 | Completed final sign-off Feb 2024 | 3732 Rivera St | rear buidling - comply with nov #201796661. , revision to pa #9913324, 200308111695, 200311170505, 201706149332; add kithen, bedroom and full bath at ground floor. new roof deck. remove connection to front building. ref# 201711164180Details
rear buidling - comply with nov #201796661. , revision to pa #9913324, 200308111695, 200311170505, 201706149332; add kithen, bedroom and full bath at ground floor. new roof deck. remove connection to front building. ref# 201711164180 | $30,000 | |
| Aug 27, 2019 | Expired or cancelled expired Aug 2023 | 85 Pope St | F C Company | legalize 1st fl dwelling unit per ordinance #43-14. unit renovation add a bedroom, a full bath, kitchen renovateDetails
legalize 1st fl dwelling unit per ordinance #43-14. unit renovation add a bedroom, a full bath, kitchen renovate | $35,000 |
| Jul 17, 2019 | Completed final sign-off Feb 2020 | 519 14th Av | Randy's Construction | replace extg stucco at front facade. replace extg windows by same size in kind.Details
replace extg stucco at front facade. replace extg windows by same size in kind. | $15,000 |
| Jul 17, 2019 | Completed final sign-off Oct 2022 | 43 Montana St | revision to appln #201901140249. replace proposed rear deck & stair by a (1) room rear addition w/ roof deck.Details
revision to appln #201901140249. replace proposed rear deck & stair by a (1) room rear addition w/ roof deck. | $30,000 | |
| Jul 17, 2019 | Completed final sign-off Mar 2023 | 324 Balboa St | Rathmines Development | legalizing. convert extg commercial office into residential use. living room of extg 1st floor dwelling unit. renovation, new stove,shower, and new bedroom.Details
legalizing. convert extg commercial office into residential use. living room of extg 1st floor dwelling unit. renovation, new stove,shower, and new bedroom. | $15,000 |
| Apr 17, 2019 | Completed final sign-off Jan 2020 | 221 03rd Av | Good Neighbor Construction | 1st flr interior renovation: bathroom renovation, new bedroom, new laundry room, rear yard pavementDetails
1st flr interior renovation: bathroom renovation, new bedroom, new laundry room, rear yard pavement | $15,000 |
| Mar 29, 2019 | Completed final sign-off Sep 2020 | 40 Morrell St | Electric Current Construction Inc. | remove extg rotten/non conforming rear exit stair and rebuild new exit rear stair.Details
remove extg rotten/non conforming rear exit stair and rebuild new exit rear stair. | $28,000 |
| Feb 21, 2019 | Completed final sign-off May 2021 | 766 30th Av | Sfba Construction Inc | add(legazile) 1st fl dwelling unit as per zoning permitted, two story rear addition.Details
add(legazile) 1st fl dwelling unit as per zoning permitted, two story rear addition. | $100,000 |
| Jan 14, 2019 | Expired or cancelled expired Oct 2022 | 43 Montana St | Randy's Construction | new 2nd floor rear wood deck. existing kitchen remodelDetails
new 2nd floor rear wood deck. existing kitchen remodel | $18,000 |
| Jan 14, 2019 | Completed final sign-off Jul 2019 | 695 Connecticut St | Tom Mc Donald | revision to addendum 2017-0613-9229 clarify fire protection of egress pathDetails
revision to addendum 2017-0613-9229 clarify fire protection of egress path | |
| Dec 4, 2018 | Never finaled issued Dec 2018, no final | 302 20th Av | interior renovation to #302: subdivide extg bed/living/dining into 2 beds, add 1 full bath, kitchen renovate. #306 kitchen renovate: add a closet. #316: convert extg living/dining into 2 bedrooms. no exterior work.Details
interior renovation to #302: subdivide extg bed/living/dining into 2 beds, add 1 full bath, kitchen renovate. #306 kitchen renovate: add a closet. #316: convert extg living/dining into 2 bedrooms. no exterior work. | $25,000 | |
| Dec 4, 2018 | Expired or cancelled withdrawn Dec 2022 | 745 Vienna St | legalize/develop as built rear yard detached storage cottage into dwelling unit per ord #43-13Details
legalize/develop as built rear yard detached storage cottage into dwelling unit per ord #43-13 | $50,000 | |
| Aug 20, 2018 | In progress issued Mar 2025 | 745 Vienna St | legalize 2nd unit at the 1st floor of existing front building. 43-14 ord.Details
legalize 2nd unit at the 1st floor of existing front building. 43-14 ord. | $8,500 | |
| Aug 8, 2018 | Expired or cancelled cancelled Jul 2024 | 1535 Van Dyke Av | raise (e) building to add garag. add a rear room to 2nd floor. (e) main unit renovation.Details
raise (e) building to add garag. add a rear room to 2nd floor. (e) main unit renovation. | $100,000 | |
| Aug 8, 2018 | Expired or cancelled withdrawn Nov 2019 | 1535 Van Dyke Av | install a new adu on lower level per ordinance 95-17.Details
install a new adu on lower level per ordinance 95-17. | $100,000 | |
| May 16, 2018 | Never finaled filed May 2018, never issued | 3732 Rivera St | renew pa# 9913324s: front addition to (e) house. pa# 2003/08/11/1695: new bathroom to 1st floor rear. pa# 2003/11/18/0505: new toilet & playroom behind garage.Details
renew pa# 9913324s: front addition to (e) house. pa# 2003/08/11/1695: new bathroom to 1st floor rear. pa# 2003/11/18/0505: new toilet & playroom behind garage. | $10,000 | |
| May 9, 2018 | Completed final sign-off Jun 2019 | 475 04th Av | Lcy Contruciton Inc | (rear bldg) legalize first floor dwelling unit per ord 43-14. planning code sec 207.3. (rear building.)Details
(rear bldg) legalize first floor dwelling unit per ord 43-14. planning code sec 207.3. (rear building.) | $8,500 |
| Mar 29, 2018 | Never finaled issued May 2019, no final | 440 Allison St | (n) 3rd floor vertical addition, enclose 1st floor area under (e) 2nd floor sunroom.Details
(n) 3rd floor vertical addition, enclose 1st floor area under (e) 2nd floor sunroom. | ||
| Mar 13, 2018 | Never finaled filed Mar 2018, never issued | 666 Geneva Av | legalization of 1st flr unit w/ 1 bedrm and 1 bath per ord# 43-14.Details
legalization of 1st flr unit w/ 1 bedrm and 1 bath per ord# 43-14. | ||
| Mar 13, 2018 | Completed final sign-off Aug 2018 | 666 Geneva Av | kitchen remodel, add a powder room, convert breakfast area into a bedroom. replace front windowsDetails
kitchen remodel, add a powder room, convert breakfast area into a bedroom. replace front windows | $28,000 | |
| Feb 22, 2018 | Never finaled issued Jun 2021, no final | 729 Lakeview Av | U A Construction | 2nd floor addition for 2 bedrooms, 2 bath, sitting & deck.Details
2nd floor addition for 2 bedrooms, 2 bath, sitting & deck. | $150,000 |
| Dec 6, 2017 | Never finaled issued Nov 2019, no final | 338 Jules Av | Electric Current Construction Inc. | 2-story rear addition for a room on each fl. remove non-conforming addition per #201008038054. also to comply w/ nov 201571161Details
2-story rear addition for a room on each fl. remove non-conforming addition per #201008038054. also to comply w/ nov 201571161 | $20,000 |
| Nov 20, 2017 | Never finaled issued Mar 2018, no final | 136 09th Av | Kennie Kwong Construction | convert 2nd fl studio into 1-bedroom unit #103. convert 4th fl 1-bedroom unit into 2-bedroom unit #304.Details
convert 2nd fl studio into 1-bedroom unit #103. convert 4th fl 1-bedroom unit into 2-bedroom unit #304. | $3,000 |
| Nov 16, 2017 | Completed final sign-off Feb 2024 | 3732 Rivera St | front building - to comply w/ nov 201796661, revision to pa #9913324, 200308111695, 200311170505, 201706149332; convert front building into new adu. add bedroom and full bath at ground floor. remove connection to rear building. ref# 202001141833 for rear buidlingDetails
front building - to comply w/ nov 201796661, revision to pa #9913324, 200308111695, 200311170505, 201706149332; convert front building into new adu. add bedroom and full bath at ground floor. remove connection to rear building. ref# 202001141833 for rear buidling | $35,000 | |
| Nov 1, 2017 | Expired or cancelled cancelled Oct 2022 | 8 Brussels St | new rear stairs to (e) second floor with enclosure.Details
new rear stairs to (e) second floor with enclosure. | $5,000 | |
| Sep 22, 2017 | Completed final sign-off Sep 2023 | 4139 Anza St | legalize 1st floor dwelling unit from (e) family room as per ord #43-14Details
legalize 1st floor dwelling unit from (e) family room as per ord #43-14 | $9,600 | |
| Aug 14, 2017 | Expired or cancelled expired Jun 2025 | 323 Country Club Dr | Rozen Home Builders Inc | legalize 1 dwelling unit as per ordinance 43-14 including (2) bedrooms, 1 full bath, living, dining & kitchen.Details
legalize 1 dwelling unit as per ordinance 43-14 including (2) bedrooms, 1 full bath, living, dining & kitchen. | |
| Jun 13, 2017 | Completed final sign-off Jul 2019 | 695 Connecticut St | new adu on 1st floor (1 bedroom & 1 bath) as per ordinance# 162-16. retrofit pa# 2014/05/09/5339.Details
new adu on 1st floor (1 bedroom & 1 bath) as per ordinance# 162-16. retrofit pa# 2014/05/09/5339. | $35,000 | |
| May 23, 2017 | Completed final sign-off Dec 2024 | 3365 Cesar Chavez St | Mendez-Ortiz Contractors, Evan Construction | add unit per ordinance no. 162-16. add two dwelling units to 1st flr as result of seismic retrofit pa#201601147099. n/a for maher ordinance.Details
add unit per ordinance no. 162-16. add two dwelling units to 1st flr as result of seismic retrofit pa#201601147099. n/a for maher ordinance. | $45,000 |
| May 10, 2017 | Never finaled issued Jul 2021, no final | 343 West Portal Av | 3 story horizontal rear addition. medical service & office establish retail use on 1st floor under separate ti application.Details
3 story horizontal rear addition. medical service & office establish retail use on 1st floor under separate ti application. | $500,000 | |
| Mar 24, 2017 | Completed final sign-off Jun 2018 | 1586 25th Av | Yu Kwan Construction Co. | new full bathroom and family room at 1st floor behind garage areaDetails
new full bathroom and family room at 1st floor behind garage area | $30,000 |
| Nov 16, 2016 | Completed final sign-off Jul 2022 | 749 18th Av | legalize 1/f dwelling unit as per ord #43-14 legalize 2 bedrooms, 1 bathroom, 1 living & dining room and 1 kitchen, 1 laundry. sprinkler for first floor to nfpa-13 under separate submittal.Details
legalize 1/f dwelling unit as per ord #43-14 legalize 2 bedrooms, 1 bathroom, 1 living & dining room and 1 kitchen, 1 laundry. sprinkler for first floor to nfpa-13 under separate submittal. | $7,050 | |
| Oct 3, 2016 | Completed final sign-off May 2019 | 119 Cayuga Av | Dw & Jy Construction | unit legalization. legalize 1/fl dwelling unit. and unit renovation. existing dwelling unit on 2/fl renovation. fill 2 lightwells. rebuild rear stair. lower (e) 1/fl slab.Details
unit legalization. legalize 1/fl dwelling unit. and unit renovation. existing dwelling unit on 2/fl renovation. fill 2 lightwells. rebuild rear stair. lower (e) 1/fl slab. | $70,000 |
| Sep 15, 2016 | Completed final sign-off Oct 2016 | 267 Mangels Av | Zeus Construction Corp. | revision to app#201309035862. scope is to replace 1/2 bathroom with wet bar in same location.Details
revision to app#201309035862. scope is to replace 1/2 bathroom with wet bar in same location. | |
| Sep 14, 2016 | Never finaled issued Sep 2016, no final | 2398 Alemany Bl | J.W.D. Construction | planning enforcement compliance: 2016007578 enf replace rotten exterior elements: stucco, plywood siding, and windows in kind, same location, same size, u factor <0.32, revision to 201005041629.Details
planning enforcement compliance: 2016007578 enf replace rotten exterior elements: stucco, plywood siding, and windows in kind, same location, same size, u factor <0.32, revision to 201005041629. | $3,500 |
| Aug 24, 2016 | Expired or cancelled cancelled Feb 2020 | 6619 California St | legalize non-conforming dwelling unit on 2nd fl as per ord #43-14Details
legalize non-conforming dwelling unit on 2nd fl as per ord #43-14 | ||
| Aug 1, 2016 | Never finaled filed Aug 2016, never issued | 1448 Pine St | convert (e) office condo #201 into a new resident dwelling unit condo, change of use from commercial condo to residential condo.Details
convert (e) office condo #201 into a new resident dwelling unit condo, change of use from commercial condo to residential condo. | $20,000 | |
| Aug 1, 2016 | Never finaled filed Aug 2016, never issued | 1448 Pine St | convert (e) office/retail condo #101 into four residential units and retain (e) retail change of use change use from commercial condo to residential condo.Details
convert (e) office/retail condo #101 into four residential units and retain (e) retail change of use change use from commercial condo to residential condo. | $88,000 | |
| Aug 1, 2016 | Never finaled filed Aug 2016, never issued | 1448 Pine St | convert (e) office condo #203 into a new residential dweling unit condo. change of use change use from commercial condo to residential condo.Details
convert (e) office condo #203 into a new residential dweling unit condo. change of use change use from commercial condo to residential condo. | $20,000 | |
| Aug 1, 2016 | Never finaled filed Aug 2016, never issued | 1448 Pine St | convert (e) office condo #202 into a new residential dwelling unit condo. change of use from commercial condo to residential condo.Details
convert (e) office condo #202 into a new residential dwelling unit condo. change of use from commercial condo to residential condo. | $20,000 | |
| May 23, 2016 | Completed final sign-off Apr 2023 | 2 Lupine Av | construct (n) single family dwelling unitDetails
construct (n) single family dwelling unit | $470,000 | |
| May 5, 2016 | Completed final sign-off Mar 2018 | 478 28th Av | legalize non-conforming 1st floor dwelling unit per zoning permitted. renovation including rebuild rear stair & utility room, add side & rear windows not visible from street, remove non-conforming trash enclosure at front, add a full bath to 1st floor.Details
legalize non-conforming 1st floor dwelling unit per zoning permitted. renovation including rebuild rear stair & utility room, add side & rear windows not visible from street, remove non-conforming trash enclosure at front, add a full bath to 1st floor. | $15,000 | |
| May 5, 2016 | Expired or cancelled withdrawn Nov 2016 | 478 28th Av | legalize existing first floor dwelling unit as per ordinance#43-14.Details
legalize existing first floor dwelling unit as per ordinance#43-14. | $29,200 | |
| Apr 11, 2016 | Expired or cancelled cancelled Nov 2022 | 20 Arlington St | enclose (e) 2 story light well for kitchen pantry on 2nd floor & bathroom for manager sute on 3rd floor. add fire glass unit to 3rd floor east wall & 2nd floor east wall.Details
enclose (e) 2 story light well for kitchen pantry on 2nd floor & bathroom for manager sute on 3rd floor. add fire glass unit to 3rd floor east wall & 2nd floor east wall. | $20,000 | |
| Apr 1, 2016 | In progress issued Mar 2025 | 745 Vienna St | existing 1st floor renovation, legalize non-permited area (horizontal addition), and add new 2nd floor (vertical addition)to the existing 1-story dwelling unit at the front building with an existing shed at the rear. the scope of work is shown on page a1, project data.Details
existing 1st floor renovation, legalize non-permited area (horizontal addition), and add new 2nd floor (vertical addition)to the existing 1-story dwelling unit at the front building with an existing shed at the rear. the scope of work is shown on page a1, project data. | $100,000 | |
| Mar 24, 2016 | Expired or cancelled cancelled Sep 2022 | 66 Cuvier St | Chang Chao Ming Constr | legalize bathroom built without permit on the 2nd floor. replace fixture of existing bathroom.Details
legalize bathroom built without permit on the 2nd floor. replace fixture of existing bathroom. | $10,000 |
| Feb 24, 2016 | Completed final sign-off Apr 2018 | 2528 16th Av | Electric Current Construction Inc. | legalizae (e) 1st fl dwelling unit includes a living/dining/kitchen room, 2 bedrooms & 1 full bath as per ord #43-14.Details
legalizae (e) 1st fl dwelling unit includes a living/dining/kitchen room, 2 bedrooms & 1 full bath as per ord #43-14. | $10,480 |
| Jan 22, 2016 | Completed final sign-off Feb 2018 | 136 Duncan St | interior renovation. relocate bedroom, kitchen & bathroom.Details
interior renovation. relocate bedroom, kitchen & bathroom. | $5,000 | |
| Jan 22, 2016 | Never finaled issued Mar 2017, no final | 538 24th Av | unit legalization ordinance# 43-14. legalize 1st floor dwelling unit. interior renovation under separate permit.Details
unit legalization ordinance# 43-14. legalize 1st floor dwelling unit. interior renovation under separate permit. | $8,650 | |
| Jan 22, 2016 | Completed final sign-off Feb 2018 | 136 Duncan St | unit legalization ordinance# 43-14. legalize 1st floor dwelling unit. interior renovation under separate permit.Details
unit legalization ordinance# 43-14. legalize 1st floor dwelling unit. interior renovation under separate permit. | $8,910 | |
| Jan 22, 2016 | Completed final sign-off Nov 2017 | 1192 Naples St | Electric Current Construction Inc. | unit legalization ordinance# 43-14. legalize 1st floor dwelling unit.Details
unit legalization ordinance# 43-14. legalize 1st floor dwelling unit. | $1,000 |
| Jan 22, 2016 | Never finaled issued Mar 2017, no final | 538 24th Av | interior renovation: relocate bedroom.Details
interior renovation: relocate bedroom. | $10,000 | |
| Jan 13, 2016 | Expired or cancelled expired Dec 2023 | 5646 Mission St | addition: infill rear right corner of (e) 2nd floor for a new multi-function (storage / guest bedroom).Details
addition: infill rear right corner of (e) 2nd floor for a new multi-function (storage / guest bedroom). | $97,000 | |
| Aug 17, 2015 | Completed final sign-off Mar 2021 | 1495 11th Av | vertical addition. 4th floor addition for a new master suite. add 1 bathroom.Details
vertical addition. 4th floor addition for a new master suite. add 1 bathroom. | $57,000 | |
| Aug 13, 2015 | Never finaled filed Aug 2015, never issued | 4320 Mission St | demolish 1-story restaurantDetails
demolish 1-story restaurant | $10,000 | |
| Jul 17, 2015 | Never finaled issued Jan 2019, no final | 440 Allison St | alter site revision to app#201006295572. add rear stair inside from 3rd floor to yard.Details
alter site revision to app#201006295572. add rear stair inside from 3rd floor to yard. | $3,000 | |
| Jul 16, 2015 | Completed final sign-off Dec 2024 | 735 Bryant St | Andonian Construction | construct new 3rd & 4th floors. renovate (e) 1st & 2nd floor. (n) bike racks & stair enclosure on basement. seismic upgrade the entire structure. fully sprinkler nfpa-13 entire structure (under separate permit). ** maher: disturbance of at least 50 cu.yd. of soil. route to dph **Details
construct new 3rd & 4th floors. renovate (e) 1st & 2nd floor. (n) bike racks & stair enclosure on basement. seismic upgrade the entire structure. fully sprinkler nfpa-13 entire structure (under separate permit). ** maher: disturbance of at least 50 cu.yd. of soil. route to dph ** | $200,000 |
| Jul 9, 2015 | Expired or cancelled cancelled Mar 2019 | 6 Tingley St | erect a three story single family dwelling residential building.Details
erect a three story single family dwelling residential building. | $540,000 | |
| Jul 9, 2015 | Never finaled filed Jul 2015, never issued | 4316 Mission St | to erect 4 stories, no basement, type v-a, 9 residential units with retail building.Details
to erect 4 stories, no basement, type v-a, 9 residential units with retail building. | $2,000,000 | |
| Jul 9, 2015 | Expired or cancelled cancelled Mar 2019 | 10 Tingley St | erect a three story single family dwelling.Details
erect a three story single family dwelling. | $546,000 | |
| May 29, 2015 | Completed final sign-off Jun 2018 | 445 Dellbrook Av | revision to 201403201275: enclose area under existing 2nd fl.Details
revision to 201403201275: enclose area under existing 2nd fl. | $20,000 | |
| Apr 22, 2015 | Completed final sign-off Sep 2017 | 1354 27th Av | Andonian Construction | legalize 1st floor unit per zoning permitted. renovation: 1st floor - entrance door & kitchen relocation. 2nd floor: fill lightwell, add full bath. rebuild rear stair.Details
legalize 1st floor unit per zoning permitted. renovation: 1st floor - entrance door & kitchen relocation. 2nd floor: fill lightwell, add full bath. rebuild rear stair. | $35,000 |
| Apr 15, 2015 | Completed final sign-off May 2023 | 1973 Broadway | Cook Construction, Eastwood Development Incorporated | vertical addition for a new bedroom, a new seating room with a new full bath, side additions, interior facade renovationDetails
vertical addition for a new bedroom, a new seating room with a new full bath, side additions, interior facade renovation | $500,000 |
| Apr 10, 2015 | Completed final sign-off Oct 2015 | 1358 09th Av | restaurant renovation: install roaster tech bbq tables in (e) dining room. add divider in mens room.no mechanical work on this permit,will be on seperate permit. supression on seperate permit.Details
restaurant renovation: install roaster tech bbq tables in (e) dining room. add divider in mens room.no mechanical work on this permit,will be on seperate permit. supression on seperate permit. | $20,000 | |
| Mar 10, 2015 | Completed final sign-off Mar 2015 | 2024 Wawona St | Wei Guo Construction | revision to 201310240198. eliminate side window. add skylightDetails
revision to 201310240198. eliminate side window. add skylight | $250 |
| Feb 13, 2015 | Completed final sign-off Jul 2015 | 5715 Geary Bl | Current Construction Co. | upgrade e entrance and exit for accessibility as per request on job card 201312093714, renewal for final. orig permit 200910290169Details
upgrade e entrance and exit for accessibility as per request on job card 201312093714, renewal for final. orig permit 200910290169 | $10,000 |
| Sep 15, 2014 | Completed final sign-off Dec 2015 | 2915 23rd St | Castillo Family Inc Dba Castle Company | remove (e) rotten rear wood stair & deck. rebuilt rear wood stair & deck w/configuration change for code compliance.Details
remove (e) rotten rear wood stair & deck. rebuilt rear wood stair & deck w/configuration change for code compliance. | $18,000 |
| Sep 9, 2014 | Completed final sign-off Apr 2015 | 386 Winding Wy | 1st fl: add family room, bedroom suite, full bath, utility closet. 2nd fl renovation: add a full bath, kitchen remodel, replace existing windows at same sizeDetails
1st fl: add family room, bedroom suite, full bath, utility closet. 2nd fl renovation: add a full bath, kitchen remodel, replace existing windows at same size | $30,000 | |
| May 2, 2014 | Never finaled issued Oct 2014, no final | 1939 Ocean Av | Blue Birds Construction Inc | establish dessert/tea service. repair refinish eisting floor. install toilet, counter and food prep equipmentDetails
establish dessert/tea service. repair refinish eisting floor. install toilet, counter and food prep equipment | $25,000 |
| Apr 10, 2014 | Completed final sign-off Jun 2014 | 433 Arguello Bl | add wall with 2 sliding windows to enclose space under existing sunrooms above to become as (n) storage room.Details
add wall with 2 sliding windows to enclose space under existing sunrooms above to become as (n) storage room. | $500 | |
| Feb 20, 2014 | Expired or cancelled cancelled Jan 2026 | 1212 Market St | #200- tenant space interior renovation, install pre-fab cubicles, open (e) demissing wall, new window on non-bearing partition (interior)Details
#200- tenant space interior renovation, install pre-fab cubicles, open (e) demissing wall, new window on non-bearing partition (interior) | $10,000 | |
| Dec 18, 2013 | Expired or cancelled cancelled Apr 2016 | 2690 Bush St | convert (e) first floor storage into family room & full bath.new hablable space sprinkler under seperate permitDetails
convert (e) first floor storage into family room & full bath.new hablable space sprinkler under seperate permit | $15,000 | |
| Nov 19, 2013 | Completed final sign-off Oct 2015 | 1242 Holloway Av | lower (e) conc. slab, develop first floor living area for a family room, 3 bedrooms & 2 full bath rooms & laundry area.Details
lower (e) conc. slab, develop first floor living area for a family room, 3 bedrooms & 2 full bath rooms & laundry area. | $60,000 | |
| Oct 31, 2013 | Expired or cancelled cancelled Feb 2019 | 43 Montana St | two story horizontal addition at rear of building.Details
two story horizontal addition at rear of building. | $80,000 | |
| May 9, 2013 | Expired or cancelled cancelled Oct 2013 | 1596 Quesada Av | clarification & documentation of legal non-conforming use as per history record of lower level dwelling unit for a total of two legal dwelling units in the building.Details
clarification & documentation of legal non-conforming use as per history record of lower level dwelling unit for a total of two legal dwelling units in the building. | ||
| Apr 18, 2013 | Expired or cancelled withdrawn Jun 2013 | 342 05th Av | add two parking spaces in (e) rear parking patio, paint on slab.Details
add two parking spaces in (e) rear parking patio, paint on slab. | $500 | |
| Mar 15, 2013 | Completed final sign-off May 2013 | 384 Allison St | 1st floor developement. bed/family room, a full bath and laundry. code compliance with complaint #201392111, 201392081, 201392071Details
1st floor developement. bed/family room, a full bath and laundry. code compliance with complaint #201392111, 201392081, 201392071 | $20,000 | |
| Nov 19, 2012 | Completed final sign-off Nov 2024 | 5435 Anza St | Bay C T Construction Inc. | two story rear addition & side addition. new third fl w/ mezzanine, new mechanical penhouse, new basement, new facade & interior renovation.Details
two story rear addition & side addition. new third fl w/ mezzanine, new mechanical penhouse, new basement, new facade & interior renovation. | $300,000 |