Lcy Contruciton Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Feb 2026
- Last 24 months
- 2 permits filed
62 permits since 2000: 55 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2026 | In progress issued Apr 2026 | 190 28th Av | new side yard exterior spiral stair to (e) rear deck. new deck flooring & guardrail at (e) rear deck; open 1/f kitchen & dining. new 1/f bathroom. (e) 2/f primary bathroom. (e) 2/f bathroom, select new windows.Details
new side yard exterior spiral stair to (e) rear deck. new deck flooring & guardrail at (e) rear deck; open 1/f kitchen & dining. new 1/f bathroom. (e) 2/f primary bathroom. (e) 2/f bathroom, select new windows. | $313,000 |
| Jan 23, 2025 | Completed final sign-off Jul 2025 | 252 Divisadero St | facade alterations to abate planning violation complaint no. 2019-004634enf. restore back to original storefront.Details
facade alterations to abate planning violation complaint no. 2019-004634enf. restore back to original storefront. | $60,000 |
| Feb 16, 2024 | Completed final sign-off Aug 2024 | 1280 Plymouth Av | repair the dry rot, in kind, at the right side of the house in-kind facing street on san ramon way. 20 sq ft max.Details
repair the dry rot, in kind, at the right side of the house in-kind facing street on san ramon way. 20 sq ft max. | $4,000 |
| Jan 16, 2024 | Completed final sign-off Sep 2024 | 2258 26th Av | remodel of (e) 2/f kitchen & (e) 3/f bathroom. relocate laundry to 1/f.Details
remodel of (e) 2/f kitchen & (e) 3/f bathroom. relocate laundry to 1/f. | $50,000 |
| Apr 13, 2023 | Completed final sign-off Dec 2023 | 5518 California St | renovate (e) kitchen & bath level 2, (n) 1/2 bath level 2, replace 12 windows on front facade in (e) openings, replace 6 windows at rear level 2 in (e) openings.Details
renovate (e) kitchen & bath level 2, (n) 1/2 bath level 2, replace 12 windows on front facade in (e) openings, replace 6 windows at rear level 2 in (e) openings. | $106,637 |
| Apr 3, 2023 | Never finaled issued Apr 2023, no final | 1554 39th Av | develope ground fl. rooms reloctae kitchen, add great room, fulll bath capture some area from (e) garage remove (e) utilty stairs between flrs. relocate furnace and wh remove stove and counter at 2nd level relocate w/d to 2nd fl. rearrange closetsDetails
develope ground fl. rooms reloctae kitchen, add great room, fulll bath capture some area from (e) garage remove (e) utilty stairs between flrs. relocate furnace and wh remove stove and counter at 2nd level relocate w/d to 2nd fl. rearrange closets | $112,800 |
| Nov 4, 2022 | Completed final sign-off Feb 2024 | 706 21st Av | interior alteration of extg condominium unit, including remodel of extg kithen, extg bathroom and new powder room at extg laundry closet.Details
interior alteration of extg condominium unit, including remodel of extg kithen, extg bathroom and new powder room at extg laundry closet. | $42,300 |
| May 10, 2022 | Completed final sign-off May 2023 | 507 Rockdale Dr | structural revisionto approved permit 202202117793. as built work performed replace existing footing.Details
structural revisionto approved permit 202202117793. as built work performed replace existing footing. | |
| Mar 9, 2022 | Completed final sign-off Jul 2022 | 7015 Geary Bl | to obtain a final inspection for work approved under previus permit pa201806040899. all work is completeDetails
to obtain a final inspection for work approved under previus permit pa201806040899. all work is complete | $80,000 |
| Feb 11, 2022 | Completed final sign-off May 2023 | 507 Rockdale Dr | project proposes: (e) 2/f kitchen and bath remodel. (e) 3/f bath remodel. new 1/f habitable space w/ new bedroom, office, mudroom, and bathroom. select replace-in-kind windows and 2 new skylights. new furnace serving 3/f.Details
project proposes: (e) 2/f kitchen and bath remodel. (e) 3/f bath remodel. new 1/f habitable space w/ new bedroom, office, mudroom, and bathroom. select replace-in-kind windows and 2 new skylights. new furnace serving 3/f. | $152,000 |
| Jan 21, 2022 | Completed final sign-off Feb 2023 | 243 Paris St | revision to no-plan pa# 202112234983: 1st fl: add bedroom, bathroom, family & laundry. replace front entry stair in-kind. 2nd fl: reconfigure kitchen, bathroom, bedroom & interior stair. add rear deck. attic: add bathroom, rear roof deck, 2 dormer windows. front window replace with alum clad wood.Details
revision to no-plan pa# 202112234983: 1st fl: add bedroom, bathroom, family & laundry. replace front entry stair in-kind. 2nd fl: reconfigure kitchen, bathroom, bedroom & interior stair. add rear deck. attic: add bathroom, rear roof deck, 2 dormer windows. front window replace with alum clad wood. | $90,000 |
| Nov 29, 2021 | Completed final sign-off Dec 2021 | 1407 23rd Av | remodeling exisitng bathroom: no wall framinng modification- no structural work.Details
remodeling exisitng bathroom: no wall framinng modification- no structural work. | |
| Jul 8, 2021 | Completed final sign-off Nov 2022 | 2836 36th Av | project proposes: 1)extg 2 floor kitchen and bathroom remodel. 2)new 2nd floor bathroom. 3)new 2nd floor sunroom windows. 4) new ground floor habitable space with 2 nw bedrooms, media room and bathroom. 5) voluntary strengthening of lower levelDetails
project proposes: 1)extg 2 floor kitchen and bathroom remodel. 2)new 2nd floor bathroom. 3)new 2nd floor sunroom windows. 4) new ground floor habitable space with 2 nw bedrooms, media room and bathroom. 5) voluntary strengthening of lower level | $139,000 |
| Jul 6, 2021 | Completed final sign-off Sep 2021 | 2258 26th Av | remodel 1/f bathroom, update 1/f outlets, install lights, no change to wall layoutDetails
remodel 1/f bathroom, update 1/f outlets, install lights, no change to wall layout | $26,000 |
| Feb 16, 2021 | Expired or cancelled cancelled Jan 2026 | 493 10th Av | addition to (e) pantry on 3/f into (e) lightwell.Details
addition to (e) pantry on 3/f into (e) lightwell. | $30,000 |
| Nov 19, 2020 | Completed final sign-off Dec 2021 | 374 Mangels Av | single family dwelling renovation - add family room, bedroom, bathroom & entry foyer (596 sf) on 1st fl. relocate (e) kitchen & bedroom and remodel (e) bathroom on 2nd fl. add 2'x2' skylight. total habitable space under 500 sqft.Details
single family dwelling renovation - add family room, bedroom, bathroom & entry foyer (596 sf) on 1st fl. relocate (e) kitchen & bedroom and remodel (e) bathroom on 2nd fl. add 2'x2' skylight. total habitable space under 500 sqft. | $100,000 |
| Nov 18, 2020 | Completed final sign-off Feb 2021 | 53 Fortuna Av | alteration of existing half bath to full bathroom.Details
alteration of existing half bath to full bathroom. | $10,000 |
| Jun 12, 2020 | Completed final sign-off Sep 2020 | 1136 Taraval St | unit b: remodel-in-kind existing kitchen and bathroom. replace and upgrade existing electrical wiring.Details
unit b: remodel-in-kind existing kitchen and bathroom. replace and upgrade existing electrical wiring. | $25,000 |
| Jun 11, 2020 | Expired or cancelled withdrawn Aug 2022 | 1407 23rd Av | adding accessory dwelling unit (817 sq.ft.) with kitchen, 3 bedrooms, 2 bathrooms and laundry closet on the first floor in existing single family dwelling. per 95-17.Details
adding accessory dwelling unit (817 sq.ft.) with kitchen, 3 bedrooms, 2 bathrooms and laundry closet on the first floor in existing single family dwelling. per 95-17. | $50,000 |
| Dec 30, 2019 | Never finaled issued Aug 2023, no final | 365 12th St | the project proposes an interior remodel with a partial horizontal addition on each floor, including new decks on floors 2 and 3. converting 2 dwelling units and one udu to 4 dwelling units, facade alterations minimal.Details
the project proposes an interior remodel with a partial horizontal addition on each floor, including new decks on floors 2 and 3. converting 2 dwelling units and one udu to 4 dwelling units, facade alterations minimal. | $350,000 |
| Dec 23, 2019 | Completed final sign-off Dec 2021 | 1407 23rd Av | remodel (e) kitchen & add master bathroom on 2nd floor of single family dwelling. install (n) beam for removal of an interior wall on 2nd floor.Details
remodel (e) kitchen & add master bathroom on 2nd floor of single family dwelling. install (n) beam for removal of an interior wall on 2nd floor. | $25,000 |
| Jun 6, 2019 | Completed final sign-off Jan 2020 | 1233 Vicente St | installation of exterior siding over (e) cedar plywood wall at east side - 500 sq ft and west side - 1700 sq ft.Details
installation of exterior siding over (e) cedar plywood wall at east side - 500 sq ft and west side - 1700 sq ft. | $20,000 |
| May 21, 2019 | Completed final sign-off Aug 2020 | 115 Brighton Av | new adu per ordinance# 95-17, (1 bedroom & 1 bath) in existing accessory garage per ordinance 95-17, structure shall undergo mandatory seismic upgrade per sfebc 403.4 & be raised three feetDetails
new adu per ordinance# 95-17, (1 bedroom & 1 bath) in existing accessory garage per ordinance 95-17, structure shall undergo mandatory seismic upgrade per sfebc 403.4 & be raised three feet | $70,000 |
| Apr 5, 2019 | Completed final sign-off Sep 2019 | 1429 Valencia St | change of use from an (e) retail space to a preschool, tenant improvement for the new preschool, mech, elec, plumbing & fire sprinkler under sep permitDetails
change of use from an (e) retail space to a preschool, tenant improvement for the new preschool, mech, elec, plumbing & fire sprinkler under sep permit | $300,000 |
| Nov 29, 2018 | Completed final sign-off Jan 2020 | 1700 Irving St | revision to pa 201811145920. restroom reconfigurationDetails
revision to pa 201811145920. restroom reconfiguration | |
| Nov 14, 2018 | Completed final sign-off Jan 2019 | 1700 Irving St | barrier removal for existing commercial tenant. upgrade accessible ramp. restroom and exterior doorsDetails
barrier removal for existing commercial tenant. upgrade accessible ramp. restroom and exterior doors | $18,000 |
| Aug 23, 2018 | Completed final sign-off Mar 2019 | 3327 20th St | remodel e facade and replace windows in e openingsDetails
remodel e facade and replace windows in e openings | $15,000 |
| Aug 1, 2018 | Completed final sign-off Apr 2019 | 47 Rudden Av | project proposes new conditioned ground floor space with a new half bath & new laundry closet, new family room and new media room. new 2nd floor full bath & new skylightDetails
project proposes new conditioned ground floor space with a new half bath & new laundry closet, new family room and new media room. new 2nd floor full bath & new skylight | $90,000 |
| Jul 20, 2018 | Completed final sign-off Feb 2019 | 475 04th Av | front building - replace (e) foundtaion, remove interior plaster walls & replace w/ 5/8" gyp board. remodel kitchen & bath (both units) replace (e) windows as in kind (same size & location). replace dry-rotted wood siding @ rear. all windows to be aluminum clad for street front.Details
front building - replace (e) foundtaion, remove interior plaster walls & replace w/ 5/8" gyp board. remodel kitchen & bath (both units) replace (e) windows as in kind (same size & location). replace dry-rotted wood siding @ rear. all windows to be aluminum clad for street front. | $180,000 |
| Jun 29, 2018 | Completed final sign-off Sep 2019 | 118 Monticello St | add one bedrooms and one full bathrooms on 1st floor in kind. relocate existing bathroom on 1 st floor.Details
add one bedrooms and one full bathrooms on 1st floor in kind. relocate existing bathroom on 1 st floor. | $50,000 |
| Jun 4, 2018 | Expired or cancelled expired May 2022 | 7015 Geary Bl | 1st floor - add 2 bedrooms, 1 full bath, media room, infill at rear. 2nd floor - remodel kitchen and bath, repair deck. 3rd floor - remodel bath and repair roof deck.Details
1st floor - add 2 bedrooms, 1 full bath, media room, infill at rear. 2nd floor - remodel kitchen and bath, repair deck. 3rd floor - remodel bath and repair roof deck. | $80,000 |
| May 30, 2018 | Completed final sign-off Apr 2019 | 3325 20th St | remodel (e) apartment at 2nd flrDetails
remodel (e) apartment at 2nd flr | $80,000 |
| May 9, 2018 | Completed final sign-off Jun 2019 | 475 04th Av | (rear bldg) legalize first floor dwelling unit per ord 43-14. planning code sec 207.3. (rear building.)Details
(rear bldg) legalize first floor dwelling unit per ord 43-14. planning code sec 207.3. (rear building.) | $8,500 |
| Apr 5, 2018 | Completed final sign-off Sep 2018 | 200 Grafton Av | bathroom remodel and new laundry room and wall removal between kitchen & living rmDetails
bathroom remodel and new laundry room and wall removal between kitchen & living rm | $18,000 |
| Mar 28, 2018 | Completed final sign-off Aug 2018 | 233 Sargent St | to comply with nov 201759455 - install sheetrock for entir bld. upgrade (e) kitchen and bathroom on 2nd flr. add full bathroom at (e) family room on 1st flr. replace 2 front windows w/alum-cladDetails
to comply with nov 201759455 - install sheetrock for entir bld. upgrade (e) kitchen and bathroom on 2nd flr. add full bathroom at (e) family room on 1st flr. replace 2 front windows w/alum-clad | $38,000 |
| Feb 22, 2018 | Completed final sign-off Aug 2018 | 233 Sargent St | repair dry rot above the garage in the front. stucco to stucco.Details
repair dry rot above the garage in the front. stucco to stucco. | $3,500 |
| Sep 18, 2017 | Completed final sign-off Feb 2018 | 3368 16th St | replace thre front windows in-kind double hung wood windowsDetails
replace thre front windows in-kind double hung wood windows | $15,000 |
| Apr 12, 2017 | Completed final sign-off Jul 2018 | 3362 16th St | soft story mandatory seismic retrofit per sfebc chapter 4d engineering criteria per 2016 cebc appendix a-4Details
soft story mandatory seismic retrofit per sfebc chapter 4d engineering criteria per 2016 cebc appendix a-4 | $100,000 |
| Mar 21, 2017 | Completed final sign-off Feb 2018 | 136 Duncan St | revision to 201601227796 structural. vokuntary foundation stregthening at 1st flrDetails
revision to 201601227796 structural. vokuntary foundation stregthening at 1st flr | $20,000 |
| Jan 3, 2017 | Completed final sign-off Apr 2017 | 656 08th Av | change out kitchen cabinets, like for like. change bathroom vanity and repair siding in stair lightwell.Details
change out kitchen cabinets, like for like. change bathroom vanity and repair siding in stair lightwell. | $10,000 |
| Aug 22, 2016 | Completed final sign-off Nov 2016 | 442 23rd Av | #4 3/f- comply with complaint #201632811, remodel (e) kitchen, bathroom & re-wire electrical, lighting in kitchen, dining room & living room.Details
#4 3/f- comply with complaint #201632811, remodel (e) kitchen, bathroom & re-wire electrical, lighting in kitchen, dining room & living room. | $22,000 |
| Jun 21, 2016 | Completed final sign-off Jun 2016 | 620 29th St | reroofingDetails
reroofing | $9,000 |
| Apr 26, 2016 | Completed final sign-off Apr 2017 | 2172 Mission St | new ti space & new mezzanine for dental office from vacant retail. maher naDetails
new ti space & new mezzanine for dental office from vacant retail. maher na | $160,000 |
| Nov 2, 2015 | Never finaled issued Dec 2015, no final | 485 Arch St | construct 1 bedroom, 1 full bathroom & laundry room at ground floor. volunteer upgrade partial foundation at ground floorDetails
construct 1 bedroom, 1 full bathroom & laundry room at ground floor. volunteer upgrade partial foundation at ground floor | $38,000 |
| Oct 30, 2015 | Completed final sign-off Mar 2016 | 785 06th Av | remodel (e) kitchen in (e) duplex, abate complaint #201311192 to fix water leaking into bathroom ceiling light fixture.Details
remodel (e) kitchen in (e) duplex, abate complaint #201311192 to fix water leaking into bathroom ceiling light fixture. | $13,000 |
| Sep 30, 2015 | Completed final sign-off Mar 2016 | 785 06th Av | to comply with complaint# 201311192, add one master bathroom.Details
to comply with complaint# 201311192, add one master bathroom. | $12,000 |
| Sep 15, 2015 | Completed final sign-off Mar 2016 | 783 06th Av | remodel (e) bathtub & vanity sink in bathroom in unit 785. to comply with nov 201311192.Details
remodel (e) bathtub & vanity sink in bathroom in unit 785. to comply with nov 201311192. | $8,000 |
| Aug 4, 2015 | Completed final sign-off Dec 2015 | 667 18th Av | replace 5 front windows in kind, with all wood materials, double-hung windowsDetails
replace 5 front windows in kind, with all wood materials, double-hung windows | $6,000 |
| Jun 15, 2015 | Completed final sign-off Jun 2015 | 1319 21st Av | unit 3: replace 6 wood windows in kind with 6 wood casement windows with divided lights to match first floor. no changes to size or openings. all visible to the street.Details
unit 3: replace 6 wood windows in kind with 6 wood casement windows with divided lights to match first floor. no changes to size or openings. all visible to the street. | $3,000 |
| Jun 12, 2015 | Completed final sign-off Dec 2015 | 35 Manzanita Av | replace two (2) garage doors in-kind with wood garage doors.Details
replace two (2) garage doors in-kind with wood garage doors. | $2,000 |
| Jun 12, 2015 | Completed final sign-off Dec 2015 | 35 Manzanita Av | interior remodel, including kitchen & bathrooms, non-street facing window replacement.Details
interior remodel, including kitchen & bathrooms, non-street facing window replacement. | $100,000 |
| Nov 20, 2014 | Completed final sign-off Feb 2015 | 1136 Taraval St | remodel kitchen & bathroom. change water service line. relocate range & sink in kitchen. replace water spouts at vanity and tub. upgrade kitchen & bathroom electrical. upgrade kitchen cabinets.Details
remodel kitchen & bathroom. change water service line. relocate range & sink in kitchen. replace water spouts at vanity and tub. upgrade kitchen & bathroom electrical. upgrade kitchen cabinets. | $15,000 |
| Nov 10, 2014 | Completed final sign-off Jan 2015 | 5211 Geary Bl | revision to appl. #2014.0520.6200. provide power door operater at front entry doors.Details
revision to appl. #2014.0520.6200. provide power door operater at front entry doors. | $3,500 |
| Oct 31, 2014 | Completed final sign-off Jan 2015 | 1 San Gabriel Av | replace and repair (e) exterior front stair in kind.Details
replace and repair (e) exterior front stair in kind. | $10,000 |
| Aug 29, 2014 | Completed final sign-off Dec 2014 | 667 18th Av | abatement ot complaint #201490151 - repair & replace existing dryrot rear stair & deck in kind. replace one window @ rear on 2nd floor.Details
abatement ot complaint #201490151 - repair & replace existing dryrot rear stair & deck in kind. replace one window @ rear on 2nd floor. | $3,000 |
| Aug 26, 2014 | Completed final sign-off Dec 2014 | 2512 Fillmore St | #1: replace kitchen cabinet, relocate kitchen stove, relocate two counter outlets, add one new light at ceiling.Details
#1: replace kitchen cabinet, relocate kitchen stove, relocate two counter outlets, add one new light at ceiling. | $9,000 |
| Aug 5, 2014 | Completed final sign-off Dec 2014 | 667 18th Av | replace kitchen cabinet, relocate kitchen sink, add new outlet for kitchen counterDetails
replace kitchen cabinet, relocate kitchen sink, add new outlet for kitchen counter | $8,000 |
| May 20, 2014 | Completed final sign-off Jan 2015 | 5211 Geary Bl | change of use from laundry mat (vacant) to office. tenant improvement for an office, remodel (e) ada bathroom & add a new bathroom.Details
change of use from laundry mat (vacant) to office. tenant improvement for an office, remodel (e) ada bathroom & add a new bathroom. | $35,000 |
| May 6, 2014 | Completed final sign-off Jun 2014 | 2572 California St | apt 1 - change tub, toilet, sink & tiles; change old pipes, relocate an outlet. no changes to doors or windows - work only in unit 1Details
apt 1 - change tub, toilet, sink & tiles; change old pipes, relocate an outlet. no changes to doors or windows - work only in unit 1 | $4,000 |
| Nov 26, 2013 | Completed final sign-off Mar 2014 | 1503 Sloat Bl | tenant improvement of kid development center. mech, elec, fire sprinkler system under separate permitsDetails
tenant improvement of kid development center. mech, elec, fire sprinkler system under separate permits | $38,000 |
| Aug 23, 2013 | Completed final sign-off Dec 2013 | 703 05th Av | renovate (e) bath and powder room on 3/f, (n) half-bath and laundry on 1/fDetails
renovate (e) bath and powder room on 3/f, (n) half-bath and laundry on 1/f | $30,000 |
| Jul 17, 2013 | Completed final sign-off Jan 2014 | 328 16th Av | provide (n) family room, (n) bedroom, (n) bath at garage floor. remodel (e) kitchen & provide 1/2 bath at 1st floor. relocate (e) bath, provide (n) office & (n) master bathroom at 2nd floor.Details
provide (n) family room, (n) bedroom, (n) bath at garage floor. remodel (e) kitchen & provide 1/2 bath at 1st floor. relocate (e) bath, provide (n) office & (n) master bathroom at 2nd floor. | $50,000 |