Lcy Contruciton Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Feb 2026
- Last 24 months
- 2 permits filed
62 permits since 2000: 55 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
6 stairs permits: 4 completed, 1 in progress, 1 never finaled. Typically 10 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2026 | In progress issued Apr 2026 | 190 28th Av | new side yard exterior spiral stair to (e) rear deck. new deck flooring & guardrail at (e) rear deck; open 1/f kitchen & dining. new 1/f bathroom. (e) 2/f primary bathroom. (e) 2/f bathroom, select new windows.Details
new side yard exterior spiral stair to (e) rear deck. new deck flooring & guardrail at (e) rear deck; open 1/f kitchen & dining. new 1/f bathroom. (e) 2/f primary bathroom. (e) 2/f bathroom, select new windows. | $313,000 |
| Apr 3, 2023 | Never finaled issued Apr 2023, no final | 1554 39th Av | develope ground fl. rooms reloctae kitchen, add great room, fulll bath capture some area from (e) garage remove (e) utilty stairs between flrs. relocate furnace and wh remove stove and counter at 2nd level relocate w/d to 2nd fl. rearrange closetsDetails
develope ground fl. rooms reloctae kitchen, add great room, fulll bath capture some area from (e) garage remove (e) utilty stairs between flrs. relocate furnace and wh remove stove and counter at 2nd level relocate w/d to 2nd fl. rearrange closets | $112,800 |
| Jan 21, 2022 | Completed final sign-off Feb 2023 | 243 Paris St | revision to no-plan pa# 202112234983: 1st fl: add bedroom, bathroom, family & laundry. replace front entry stair in-kind. 2nd fl: reconfigure kitchen, bathroom, bedroom & interior stair. add rear deck. attic: add bathroom, rear roof deck, 2 dormer windows. front window replace with alum clad wood.Details
revision to no-plan pa# 202112234983: 1st fl: add bedroom, bathroom, family & laundry. replace front entry stair in-kind. 2nd fl: reconfigure kitchen, bathroom, bedroom & interior stair. add rear deck. attic: add bathroom, rear roof deck, 2 dormer windows. front window replace with alum clad wood. | $90,000 |
| Jan 3, 2017 | Completed final sign-off Apr 2017 | 656 08th Av | change out kitchen cabinets, like for like. change bathroom vanity and repair siding in stair lightwell.Details
change out kitchen cabinets, like for like. change bathroom vanity and repair siding in stair lightwell. | $10,000 |
| Oct 31, 2014 | Completed final sign-off Jan 2015 | 1 San Gabriel Av | replace and repair (e) exterior front stair in kind.Details
replace and repair (e) exterior front stair in kind. | $10,000 |
| Aug 29, 2014 | Completed final sign-off Dec 2014 | 667 18th Av | abatement ot complaint #201490151 - repair & replace existing dryrot rear stair & deck in kind. replace one window @ rear on 2nd floor.Details
abatement ot complaint #201490151 - repair & replace existing dryrot rear stair & deck in kind. replace one window @ rear on 2nd floor. | $3,000 |