Block 1540, lot 016
475 04th Ave
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 2
- Units
- 4
- Rooms
- 7 bedrooms, 4 bathrooms
- Building
- 3,158 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 26, 2018 | Never finaled issued Sep 2018, no final | 475 04th Av | street spaceDetails
street space | ||
| Jul 20, 2018 | Completed final sign-off Feb 2019 | 475 04th Av | Lcy Contruciton Inc | front building - replace (e) foundtaion, remove interior plaster walls & replace w/ 5/8" gyp board. remodel kitchen & bath (both units) replace (e) windows as in kind (same size & location). replace dry-rotted wood siding @ rear. all windows to be aluminum clad for street front.Details
front building - replace (e) foundtaion, remove interior plaster walls & replace w/ 5/8" gyp board. remodel kitchen & bath (both units) replace (e) windows as in kind (same size & location). replace dry-rotted wood siding @ rear. all windows to be aluminum clad for street front. | $180,000 |
| May 9, 2018 | Completed final sign-off Jun 2019 | 475 04th Av | Lcy Contruciton Inc | (rear bldg) legalize first floor dwelling unit per ord 43-14. planning code sec 207.3. (rear building.)Details
(rear bldg) legalize first floor dwelling unit per ord 43-14. planning code sec 207.3. (rear building.) | $8,500 |
| Jan 8, 2009 | Completed final sign-off Jan 2010 | 475 04th Av | 4 And 5 Construction, Inc | 2nd floor: remodel extg full bath & kitchen. grnd flr: replace extg deteriate foundation and slab. rearrange room layout to include a family room. office and a toilet. remove n-w corner at rear to preserve oringinal patio. close 3 extg wndw at property line. replace extg wndw with dual glazing wndwDetails
2nd floor: remodel extg full bath & kitchen. grnd flr: replace extg deteriate foundation and slab. rearrange room layout to include a family room. office and a toilet. remove n-w corner at rear to preserve oringinal patio. close 3 extg wndw at property line. replace extg wndw with dual glazing wndw | $48,000 |
| Apr 17, 2002 | Completed final sign-off Sep 2002 | 475 04th Av | replace kitchen cabinet & counter top. replace bathroom tile.Details
replace kitchen cabinet & counter top. replace bathroom tile. | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Lcy Contruciton Inc (2), 4 And 5 Construction, Inc
- Architects
- Van Ly
- Engineers
- Emmanuel Pun, Emmanuel Pun
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.