Block 1238, lot 021
250 Divisadero St
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 3
- Units
- 16
- Rooms
- 12 bedrooms, 16 bathrooms
- Building
- 10,200 sq ft
- Lot
- 3,750 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
49 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2025 | Completed final sign-off Aug 2025 | 250 Divisadero St | J T & M Hardwood Flooring Construcing | to legalize existing projecting sign. (tea & others)Details
to legalize existing projecting sign. (tea & others) | |
| Jan 23, 2025 | Completed final sign-off Jul 2025 | 252 Divisadero St | Lcy Contruciton Inc | facade alterations to abate planning violation complaint no. 2019-004634enf. restore back to original storefront.Details
facade alterations to abate planning violation complaint no. 2019-004634enf. restore back to original storefront. | $60,000 |
| Feb 16, 2022 | Completed final sign-off Mar 2022 | 254 Divisadero St | Mendez-Ortiz Contractors | permit to document replacement of 36 wood windows at residential units. window replacements were in units 1,2,3,4,6,7,8,9, & 10. work was done without permits and is in response to planning enforcement case 2020004696 enf. windows have been replaced with aluminum clad wood throughout.Details
permit to document replacement of 36 wood windows at residential units. window replacements were in units 1,2,3,4,6,7,8,9, & 10. work was done without permits and is in response to planning enforcement case 2020004696 enf. windows have been replaced with aluminum clad wood throughout. | $10 |
| Sep 11, 2020 | Expired or cancelled withdrawn Nov 2021 | 254 Divisadero St | G M Building And Construction Inc | replace in kind 36 windows around building. no change on opening. wood clad windowsDetails
replace in kind 36 windows around building. no change on opening. wood clad windows | $16,000 |
| Nov 8, 2019 | Completed final sign-off Dec 2020 | 254 Divisadero St | San Francisco Fire Protection | 2021 mandate upgrade installation of fire alarm system in non-sprinklered bldg. install new power supply and 22 low frequency sounders.Details
2021 mandate upgrade installation of fire alarm system in non-sprinklered bldg. install new power supply and 22 low frequency sounders. | $22,600 |
| Oct 8, 2019 | Expired or cancelled cancelled Dec 2022 | 252 Divisadero St | response to sf planning notice of enforcement (dated 8/21/19) - facade alterations complaint #2019-004634enf.Details
response to sf planning notice of enforcement (dated 8/21/19) - facade alterations complaint #2019-004634enf. | $3,000 | |
| Sep 5, 2019 | Never finaled issued Sep 2019, no final | 254 Divisadero St | San Francisco Fire Protection | like for like fire alarm installation replacing fcap smk det, and manual pull station. (e) bells will remain. additional notification devices will be installed prior to 2021Details
like for like fire alarm installation replacing fcap smk det, and manual pull station. (e) bells will remain. additional notification devices will be installed prior to 2021 | $7,000 |
| May 13, 2019 | Never finaled issued May 2019, no final | 250 Divisadero St | street spaceDetails
street space | ||
| Apr 16, 2019 | Completed final sign-off Jan 2020 | 254 Divisadero St | Speedy Construction Inc | apt 8 - non structural interior remodel - relocate (e) kitchen, remodel (e) bathroom and provide 2 bedrooms.Details
apt 8 - non structural interior remodel - relocate (e) kitchen, remodel (e) bathroom and provide 2 bedrooms. | $30,000 |
| Mar 4, 2019 | Completed final sign-off Sep 2019 | 250 Divisadero St | Richbay Construction | demo (e) non structural walls, finishes, wimdows mullons. new non structural partitions, low walls. millwork. new equipment and finishesDetails
demo (e) non structural walls, finishes, wimdows mullons. new non structural partitions, low walls. millwork. new equipment and finishes | $80,000 |
| Nov 1, 2018 | Completed final sign-off Aug 2019 | 250 Divisadero St | Richbay Construction | change of use from retail to a nonformula, non-coding boba tea store (limited food use), no construction under this permit.Details
change of use from retail to a nonformula, non-coding boba tea store (limited food use), no construction under this permit. | |
| Jun 1, 2016 | Never finaled issued Jun 2016, no final | 260 Divisadero St | street spaceDetails
street space | ||
| Feb 4, 2016 | Completed final sign-off Feb 2016 | 258 Divisadero St | Yes Construction | need otc approval for title 24 reportand lightingDetails
need otc approval for title 24 reportand lighting | $4,000 |
| Jan 22, 2016 | Never finaled issued Jan 2016, no final | 252 Divisadero St | I M Electrical | title 24 complianceDetails
title 24 compliance | $2,000 |
| Jan 20, 2016 | Completed final sign-off Jan 2016 | 252 Divisadero St | Magnum Construction Group Inc | install new fire suppression system for kitchen hood & duct only.Details
install new fire suppression system for kitchen hood & duct only. | $3,000 |
| Dec 3, 2015 | Never finaled issued Dec 2015, no final | 258 Divisadero St | sidewalk repair onlyDetails
sidewalk repair only | ||
| Nov 17, 2015 | Never finaled issued Nov 2015, no final | 254 Divisadero St | street spaceDetails
street space | ||
| Nov 3, 2015 | Completed final sign-off Sep 2016 | 260 Divisadero St | Prc Construction Inc., Reddington Construction | change of use from group b retial to group b ltd restaurant use. t/i of a g/f comm'l space including installation of ada bathroom, clean/production rm, food prep., sales counter, seating, new fixtures and finishesDetails
change of use from group b retial to group b ltd restaurant use. t/i of a g/f comm'l space including installation of ada bathroom, clean/production rm, food prep., sales counter, seating, new fixtures and finishes | $50,000 |
| Oct 28, 2015 | Never finaled issued Nov 2015, no final | 252 Divisadero St | Finbarr Collins Construction Inc. | mechanical permit for replacing (e) hood. revision (e) 2015-0710-1185Details
mechanical permit for replacing (e) hood. revision (e) 2015-0710-1185 | $2,500 |
| Oct 14, 2015 | Completed final sign-off Dec 2015 | 254 Divisadero St | M H M Construction | unit #2: interior remodel - relocate existing kitchen, provide new bedroom, remodel (e) bath, replace 1 window in kind at side lightwell, not visible from street.Details
unit #2: interior remodel - relocate existing kitchen, provide new bedroom, remodel (e) bath, replace 1 window in kind at side lightwell, not visible from street. | $30,000 |
| Sep 4, 2015 | Completed final sign-off Nov 2018 | 258 Divisadero St | neighborhood notification per section 312. change of use from limited retaurant to restaurant. no proposed construction or alterations under this permitDetails
neighborhood notification per section 312. change of use from limited retaurant to restaurant. no proposed construction or alterations under this permit | ||
| Aug 14, 2015 | Completed final sign-off Feb 2016 | 258 Divisadero St | Yes Construction | renovate (e) commercial space for new cafe; new accessible restroom; new bar & built in storage; new kitchen equipment & dish stationDetails
renovate (e) commercial space for new cafe; new accessible restroom; new bar & built in storage; new kitchen equipment & dish station | $40,000 |
| Jul 10, 2015 | Completed final sign-off Jan 2016 | 252 Divisadero St | Finbarr Collins Construction Inc. | interior t.i. inclues new seating, new kitchen and new uni-sex restroom. mep and life safety shall be under separate permit.Details
interior t.i. inclues new seating, new kitchen and new uni-sex restroom. mep and life safety shall be under separate permit. | $20,000 |
| Jun 10, 2015 | Never finaled issued Jun 2015, no final | 254 Divisadero St | street spaceDetails
street space | ||
| Jun 4, 2015 | Completed final sign-off Jan 2016 | 252 Divisadero St | demo half wall prepare for t.i. per ab-017Details
demo half wall prepare for t.i. per ab-017 | $500 | |
| Apr 27, 2015 | Completed final sign-off Nov 2016 | 254 Divisadero St | M H M Construction | g/f - residential common area - in (e) existing storage room install 2 washers and 2 dryersDetails
g/f - residential common area - in (e) existing storage room install 2 washers and 2 dryers | $5,000 |
| Mar 25, 2015 | Expired or cancelled cancelled Jul 2015 | 258 Divisadero St | Olympia Construction Co | replace flooring in kitchen & service area. lower counter to create a space for disabled persons. install tiles on the kitchen wall. replace faucet in kitchen. move around kitchen appliances to create a path if movement, upgrade elec work as needed & in compliance, exterior lightingDetails
replace flooring in kitchen & service area. lower counter to create a space for disabled persons. install tiles on the kitchen wall. replace faucet in kitchen. move around kitchen appliances to create a path if movement, upgrade elec work as needed & in compliance, exterior lighting | $20,000 |
| Sep 5, 2014 | Completed final sign-off Mar 2015 | 250 Divisadero St | U S Prime Contractor Inc | detail change to approved plans per application # 201407090782. revise the location of plywood on line d.Details
detail change to approved plans per application # 201407090782. revise the location of plywood on line d. | |
| Aug 14, 2014 | Completed final sign-off Jan 2015 | 250 Divisadero St | Weather Tight Waterproofing | reroofingDetails
reroofing | $20,000 |
| Aug 7, 2014 | Expired or cancelled cancelled Mar 2017 | 250 Divisadero St | Don Meyers | to erect non-electric, wall, single faced sign.Details
to erect non-electric, wall, single faced sign. | $2,100 |
| Jul 11, 2014 | Completed final sign-off Apr 2015 | 262 Divisadero St | change of use of an (e) ground floor commercial retail space (vacant) to a limited service coffee bar.Details
change of use of an (e) ground floor commercial retail space (vacant) to a limited service coffee bar. | $50,000 | |
| Jul 9, 2014 | Completed final sign-off Mar 2015 | 250 Divisadero St | U S Prime Contractor Inc | soft story compliance to ordinance 66-13" per chapter 34b of sfbc & 2012 i.e.b.c. appendix a-4Details
soft story compliance to ordinance 66-13" per chapter 34b of sfbc & 2012 i.e.b.c. appendix a-4 | $50,000 |
| May 29, 2014 | Completed final sign-off Sep 2014 | 254 Divisadero St | M H M Construction | #10- revision to pa#201405206202 revise framing directions to reflect site conditions, revise kitchen and bedroom layouts.Details
#10- revision to pa#201405206202 revise framing directions to reflect site conditions, revise kitchen and bedroom layouts. | |
| May 20, 2014 | Completed final sign-off Sep 2014 | 254 Divisadero St | M H M Construction | interior remodel apt 10. relocate e kitchen. provide new bedroom. remodel e bathroom. replace lighting with high efficacy lightingDetails
interior remodel apt 10. relocate e kitchen. provide new bedroom. remodel e bathroom. replace lighting with high efficacy lighting | $30,000 |
| Jan 15, 2014 | Completed final sign-off Apr 2014 | 254 Divisadero St | M H M Construction | interior remodel apt 4: relocate kitchen and bath. new bedroom. comply with ab093 attachment b table 4Details
interior remodel apt 4: relocate kitchen and bath. new bedroom. comply with ab093 attachment b table 4 | $30,000 |
| Jan 15, 2014 | Completed final sign-off Apr 2014 | 254 Divisadero St | M H M Construction | interior remodel apt 1. relocate kitchen. new bedroom. remodel e bath. comply with ab003 attachment b, table 4Details
interior remodel apt 1. relocate kitchen. new bedroom. remodel e bath. comply with ab003 attachment b, table 4 | $30,000 |
| Nov 25, 2013 | Completed final sign-off Jan 2014 | 254 Divisadero St | M H M Construction | unit #6 interior remodel, relocate kitchen, provide new bedroom, remodel (e) bathroom, electrical & plumbing work as necessary.Details
unit #6 interior remodel, relocate kitchen, provide new bedroom, remodel (e) bathroom, electrical & plumbing work as necessary. | $25,000 |
| Oct 16, 2013 | Completed final sign-off Feb 2014 | 254 Divisadero St | M H M Construction | apt #9 interior remodel: relocate kitchen & bath, provide new bedroom, electrical & plumbing work as necessary, replace lighting with high efficacy lighting.Details
apt #9 interior remodel: relocate kitchen & bath, provide new bedroom, electrical & plumbing work as necessary, replace lighting with high efficacy lighting. | $20,000 |
| Sep 25, 2013 | Completed final sign-off Nov 2013 | 254 Divisadero St | M H M Construction | #7 - revision to appl #2013.08.28.5432: wall layout changes due to framing verification at site.Details
#7 - revision to appl #2013.08.28.5432: wall layout changes due to framing verification at site. | |
| Aug 28, 2013 | Completed final sign-off Nov 2013 | 254 Divisadero St | M H M Construction | unit #7-interior remodel remove non load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bathroom. replace 1 windows at side ligthwell, not visible from the street. electrical & plumbing work as necessary. replace lighting with high efficacy lightingDetails
unit #7-interior remodel remove non load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bathroom. replace 1 windows at side ligthwell, not visible from the street. electrical & plumbing work as necessary. replace lighting with high efficacy lighting | $20,000 |
| May 15, 2013 | Completed final sign-off Aug 2013 | 254 Divisadero St | M H M Construction | unit #3-interior remodel-relocate kitchen, provide 2 new bedrooms, remodel (e) bathroom. electrical & plumbing work as neccessary, replace lighting with high eff. lightingDetails
unit #3-interior remodel-relocate kitchen, provide 2 new bedrooms, remodel (e) bathroom. electrical & plumbing work as neccessary, replace lighting with high eff. lighting | $20,000 |
| May 13, 2013 | Never finaled issued May 2013, no final | 254 Divisadero St | street spaceDetails
street space | ||
| Jul 31, 2009 | Never finaled issued Jul 2009, no final | 258 Divisadero St | street space permit.Details
street space permit. | ||
| Feb 17, 2009 | Never finaled issued Feb 2009, no final | 252 Divisadero St | H K Fire Protection Inc.* Check I.D. *** | updrade automatic fire suppression system to the kitchen hood using range guard ul300, 2.5 gallon wet chemical.Details
updrade automatic fire suppression system to the kitchen hood using range guard ul300, 2.5 gallon wet chemical. | $1,200 |
| Oct 16, 2007 | Completed final sign-off Nov 2007 | 250 Divisadero St | Don Meyers | 7 ft x 10ft non illuminated signDetails
7 ft x 10ft non illuminated sign | $1,600 |
| Nov 30, 2006 | Never finaled issued Nov 2006, no final | 250 Divisadero St | sidewalk repairDetails
sidewalk repair | ||
| Nov 12, 2003 | Expired or cancelled expired Nov 2006 | 250 Divisadero St | Don Meyers | erect : non-electic, wall, single faced, non-illuminited new signDetails
erect : non-electic, wall, single faced, non-illuminited new sign | |
| Feb 10, 2003 | Expired or cancelled withdrawn Apr 2003 | 250 Divisadero St | only change of use/liquor store to smoke shopDetails
only change of use/liquor store to smoke shop | ||
| Jan 31, 2003 | Never finaled issued Jan 2003, no final | 254 Divisadero St | Schwed Construction | comply w/housing violation notice 200235652-dry rot at rear stair treads, less than 50% of stairs elDetails
comply w/housing violation notice 200235652-dry rot at rear stair treads, less than 50% of stairs el | $1,900 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.