Block 0050, lot 006A
31 Houston St
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 2
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 4,630 sq ft
- Lot
- 3,916 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 11, 2021 | Never finaled issued Jun 2023, no final | 31 Houston St | Ordway Construction Inc. | (e) is a residential three-story structure: third floor has 3 dwelling units, second floor has 3 dwelling units, first floor has one-car garage, storage spaces, and one dwelling unit. convert (e) 1st floor garage and storage area into (2) new adu per ord. #162-16. total of nine units.Details
(e) is a residential three-story structure: third floor has 3 dwelling units, second floor has 3 dwelling units, first floor has one-car garage, storage spaces, and one dwelling unit. convert (e) 1st floor garage and storage area into (2) new adu per ord. #162-16. total of nine units. | $200,000 |
| Jul 1, 2020 | Never finaled issued Jul 2020, no final | 31 Houston St | to comply with nov #202029472. recommencement & completion work approved under pa# 2016/0822/5689Details
to comply with nov #202029472. recommencement & completion work approved under pa# 2016/0822/5689 | $84,000 | |
| Aug 22, 2016 | Never finaled issued Oct 2016, no final | 31 Houston St | comply w/ mandatory soft-story program. (type = fema p-807)Details
comply w/ mandatory soft-story program. (type = fema p-807) | $65,000 | |
| Oct 15, 2015 | Completed final sign-off Dec 2016 | 33 Houston St | Paramount Construction Services Inc | kitchen: subpanel upgrade and deciated lines for d/w and g/d, m/v. plumbing is to replace angel stops and replace shower valve and drain in bathroom. upgrade light fixtures. [kitchen & bathroom remodel].Details
kitchen: subpanel upgrade and deciated lines for d/w and g/d, m/v. plumbing is to replace angel stops and replace shower valve and drain in bathroom. upgrade light fixtures. [kitchen & bathroom remodel]. | $35,000 |
| May 4, 2011 | Completed final sign-off Jun 2011 | 33 Houston St | B Bilt Contruction Inc | repair concrete holes back patio approx 4-6 holes) lattice enclosures in back area. repair existing.Details
repair concrete holes back patio approx 4-6 holes) lattice enclosures in back area. repair existing. | $800 |
| Nov 30, 2010 | Completed final sign-off Feb 2011 | 33 Houston St | B Bilt Contruction Inc | repair dry rotted stair treads & decks to comply w/nov 201079948, repair support posts both at rear of building (note: less than 20% of deck & stairs to be repaired) no other work, less than 50% repair.Details
repair dry rotted stair treads & decks to comply w/nov 201079948, repair support posts both at rear of building (note: less than 20% of deck & stairs to be repaired) no other work, less than 50% repair. | $2,000 |
| Feb 29, 2008 | Completed final sign-off Mar 2008 | 31 Houston St | S'top Home Service Roofing Co. Inc. | reroofingDetails
reroofing | $11,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- B Bilt Contruction Inc (2), Ordway Construction Inc., Paramount Construction Services Inc, S'top Home Service Roofing Co. Inc.
- Architects
- Van Thai Ly
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.