Sfba Construction Inc
- Based in
- Fremont
- On San Francisco permits
- Feb 2018 to Sep 2026
- Last 24 months
- 1 permit filed
8 permits since 2000: 7 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 4
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2026 | In progress issued Oct 2026 | 2843 Webster St | units #104 & 105: exploratory demolition to open up walls within the units and public area to inspect hidden elements and/or damages of the building structure and utility lines.Details
units #104 & 105: exploratory demolition to open up walls within the units and public area to inspect hidden elements and/or damages of the building structure and utility lines. | $15,000 |
| Apr 22, 2022 | Completed final sign-off Apr 2024 | 550 Davis St | unit 4: remodel existing (1) kitchen in kind. remodel existing (3) bathroom in kind. non structural.Details
unit 4: remodel existing (1) kitchen in kind. remodel existing (3) bathroom in kind. non structural. | $40,000 |
| Apr 22, 2022 | Completed final sign-off Sep 2022 | 631 Shotwell St | install r-30 insulation at roof attic, r-15 at exterior wall. install 5/8" type x drywall throughout the whole house.Details
install r-30 insulation at roof attic, r-15 at exterior wall. install 5/8" type x drywall throughout the whole house. | $10,000 |
| Jun 11, 2021 | Completed final sign-off Sep 2022 | 631 Shotwell St | amend bpa 202105120228: convert the (e) closets between bedrooms 2 & 3 into a full bathroom.Details
amend bpa 202105120228: convert the (e) closets between bedrooms 2 & 3 into a full bathroom. | $25,000 |
| May 12, 2021 | Completed final sign-off Sep 2022 | 631 Shotwell St | kitchen and bathroom remodel in kind. replace 11 windows including 2 in front with wood.Details
kitchen and bathroom remodel in kind. replace 11 windows including 2 in front with wood. | $30,000 |
| Feb 18, 2020 | Completed final sign-off May 2021 | 766 30th Av | revision to app#201902213528: interior re-arrangement only. new opening between kitchen and dining on 2nd floor.Details
revision to app#201902213528: interior re-arrangement only. new opening between kitchen and dining on 2nd floor. | $3,000 |
| Feb 21, 2019 | Completed final sign-off May 2021 | 766 30th Av | add(legazile) 1st fl dwelling unit as per zoning permitted, two story rear addition.Details
add(legazile) 1st fl dwelling unit as per zoning permitted, two story rear addition. | $100,000 |
| Feb 22, 2018 | Completed final sign-off Apr 2018 | 3251 20th Av | space 156 - new service conter new equipment to a (e) food establish, new electrical recpt. no changes to plm, mecj or lightingDetails
space 156 - new service conter new equipment to a (e) food establish, new electrical recpt. no changes to plm, mecj or lighting | $20,000 |