Anne Fougeron
- Listed as
- architect, engineer
- Firm
- Fougeron Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jul 2015 to May 2025
6 permits since 2000 (architect on 5 permits, engineer on 1 permit): 1 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 30, 2025 | In progress issued Jun 2025 | 585 Connecticut St | Nima Construction | revision to pa 202103166680 extension of existing rear deck; extend rear deck @ level 1 an additional 3'-6". deck is less than 10'-0" above existing grade and is an allowed obstruction per sf planning code sec 136.c,25.b.iiDetails
revision to pa 202103166680 extension of existing rear deck; extend rear deck @ level 1 an additional 3'-6". deck is less than 10'-0" above existing grade and is an allowed obstruction per sf planning code sec 136.c,25.b.ii | $5,000 |
| Mar 16, 2021 | Expired or cancelled suspend Mar 2026 | 585 Connecticut St | Nima Construction, Devlin/Mcnally Construction | remodel of (e) sfh w/ (n) horizontal addition at rear. the house will be lifted vertically 5'-10". upgrade of mechanical, electtical, & structural systems to the current codes. addition of new nfpa 13r sprinkler systems per cbc 903.3.1.3 under separate permit.Details
remodel of (e) sfh w/ (n) horizontal addition at rear. the house will be lifted vertically 5'-10". upgrade of mechanical, electtical, & structural systems to the current codes. addition of new nfpa 13r sprinkler systems per cbc 903.3.1.3 under separate permit. | $200,000 |
| Feb 4, 2021 | Expired or cancelled cancelled Nov 2024 | 508 Belvedere St | Dermot Barry Construction | horizontal expansion in the rear on first and second floors. demo of rear facade, relocate a kitchen, relocate two bathrooms, rearrange solar panels.Details
horizontal expansion in the rear on first and second floors. demo of rear facade, relocate a kitchen, relocate two bathrooms, rearrange solar panels. | $50,000 |
| Nov 30, 2020 | Expired or cancelled cancelled Nov 2024 | 508 Belvedere St | renovations and foundation upgrade at garage level & interior garage renovations with new `Details
renovations and foundation upgrade at garage level & interior garage renovations with new ` | $52,000 | |
| Mar 5, 2020 | Completed final sign-off Jul 2020 | 1915 Stockton St | Ideal Builders | revision to pa #2018007205063 to reflect as built condition of: glass railings replaced with wood walls , railing, and planers. occupiable area also reduced within approved design area.Details
revision to pa #2018007205063 to reflect as built condition of: glass railings replaced with wood walls , railing, and planers. occupiable area also reduced within approved design area. | |
| Jul 9, 2015 | Never finaled filed Jul 2015, never issued | 4316 Mission St | to erect 4 stories, no basement, type v-a, 9 residential units with retail building.Details
to erect 4 stories, no basement, type v-a, 9 residential units with retail building. | $2,000,000 |