Block 0063, lot 007
1915 Stockton St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 13, 2022 | Completed final sign-off Dec 2022 | 1915 Stockton St | Ideal Builders | install 400 sq ft of synthetic lawn on roof for cooling and aesthetic improvement, adjacent to roof deck installed per pa# 202007029493. roof is tot of 1500 sf. synthetic lawn material 3 psf max is synlawn brand fire rated a roofing grade. to be laid on top of (e) rolled asphalt roof. no underlay.Details
install 400 sq ft of synthetic lawn on roof for cooling and aesthetic improvement, adjacent to roof deck installed per pa# 202007029493. roof is tot of 1500 sf. synthetic lawn material 3 psf max is synlawn brand fire rated a roofing grade. to be laid on top of (e) rolled asphalt roof. no underlay. | $3,000 |
| May 26, 2022 | Completed final sign-off Dec 2022 | 1915 Stockton St | to comply with phsical inspection report #cc-8341.Details
to comply with phsical inspection report #cc-8341. | $5,000 | |
| Jul 2, 2020 | Completed final sign-off Jul 2020 | 1915 Stockton St | Ideal Builders | revision to pa 2018-0720-5063 & 2020-0305-6285 glass railing will be replaced with wood railings. 2020-0305-6284 is approved w/out structural matching with approved plans 2020-0305-6284Details
revision to pa 2018-0720-5063 & 2020-0305-6285 glass railing will be replaced with wood railings. 2020-0305-6284 is approved w/out structural matching with approved plans 2020-0305-6284 | |
| Mar 5, 2020 | Completed final sign-off Jul 2020 | 1915 Stockton St | Ideal Builders | revision to pa #2018007205063 to reflect as built condition of: glass railings replaced with wood walls , railing, and planers. occupiable area also reduced within approved design area.Details
revision to pa #2018007205063 to reflect as built condition of: glass railings replaced with wood walls , railing, and planers. occupiable area also reduced within approved design area. | |
| Jul 20, 2018 | Completed final sign-off Jul 2020 | 1915 Stockton St | new stair to roof, operable skylight and roof deck.Details
new stair to roof, operable skylight and roof deck. | $150,000 | |
| May 14, 2018 | Expired or cancelled cancelled Jun 2022 | 1917 Stockton St | Christopher Gate Construction Inc | bathroom remodel, lower unitDetails
bathroom remodel, lower unit | $15,000 |
| May 7, 2018 | Expired or cancelled withdrawn May 2022 | 1917 Stockton St | Christopher Gate Construction Inc | ground flr remodel. upgrade bathroom. move some non bearing walls add deck and hot/cold tubs and sauna in rear yardDetails
ground flr remodel. upgrade bathroom. move some non bearing walls add deck and hot/cold tubs and sauna in rear yard | $80,000 |
| Jun 17, 2016 | Completed final sign-off Jul 2017 | 1915 Stockton St | Bay Built Construction Inc | to obtain final inspection for work approved under pa#201503312428 & 201504224277, all work is complete.Details
to obtain final inspection for work approved under pa#201503312428 & 201504224277, all work is complete. | |
| May 16, 2016 | Never finaled issued May 2016, no final | 1915 Stockton St | street spaceDetails
street space | ||
| Jan 14, 2016 | Never finaled issued Jan 2016, no final | 1915 Stockton St | street space permitDetails
street space permit | ||
| Sep 14, 2015 | Never finaled issued Sep 2015, no final | 1915 Stockton St | street space permit, renewal of permit #201503312428Details
street space permit, renewal of permit #201503312428 | ||
| Sep 1, 2015 | Completed final sign-off Jul 2017 | 1915 Stockton St | Bay Built | repair front stair threads, tile and framing, less than 50 percent replacement.Details
repair front stair threads, tile and framing, less than 50 percent replacement. | $5,000 |
| Jul 31, 2015 | Completed final sign-off Jul 2017 | 1915 Stockton St | Bay Built | revision to pa#201503312428 demonstrating location of footings per inspector. to pay penalty for bid complaint #201541151. does not address complaint 201541151.Details
revision to pa#201503312428 demonstrating location of footings per inspector. to pay penalty for bid complaint #201541151. does not address complaint 201541151. | |
| May 7, 2015 | Completed final sign-off Jul 2017 | 1915 Stockton St | Bay Built | to comply with nov 201541151: replace drywall as necessary, repair flooring, repair framing as neededDetails
to comply with nov 201541151: replace drywall as necessary, repair flooring, repair framing as needed | $5,000 |
| Apr 22, 2015 | Expired or cancelled expired Jul 2017 | 1915 Stockton St | Bay Built | remodel (e) bathrooms (5) and (e) kitchens (2). replace windows size for size, same location - rear and side windows only. work on all floorsDetails
remodel (e) bathrooms (5) and (e) kitchens (2). replace windows size for size, same location - rear and side windows only. work on all floors | $45,000 |
| Mar 31, 2015 | Expired or cancelled expired Jul 2017 | 1915 Stockton St | Bay Built | replace (e) foundationDetails
replace (e) foundation | $30,000 |
| Feb 18, 2015 | Never finaled issued Feb 2015, no final | 1915 Stockton St | street spaceDetails
street space | ||
| Mar 17, 2011 | Expired or cancelled expired Aug 2012 | 1915 Stockton St | Sincere Construction Company Inc | repair back/rear stairway steps and landing less than 50%. repair back wall siding (approx 65 square feet). no structural work. to comply with his nov #20103506 dated 2/17/2011.Details
repair back/rear stairway steps and landing less than 50%. repair back wall siding (approx 65 square feet). no structural work. to comply with his nov #20103506 dated 2/17/2011. | $5,800 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.