Dermot Barry Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Jan 2023
- Last 24 months
- 0 permits filed
92 permits since 2000: 71 completed, 10 never finaled, 11 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 24, 2023 | Never finaled issued Feb 2023, no final | 1770 Golden Gate Av | unit #1: remove walls between kitchen, dining & family room. kitchen remodel @ unit #1.Details
unit #1: remove walls between kitchen, dining & family room. kitchen remodel @ unit #1. | $200,000 |
| Aug 12, 2021 | Completed final sign-off Oct 2021 | 2601 Mission St | 5/f: suite 502: install 2 non-load bearing partition wlals with metal studs at 12ft high and sheetrock terminaty at 8ft high; 2 low walls at 46in high and 1 low walll at 25in high. (e) hvac + elec systems to remain as is.Details
5/f: suite 502: install 2 non-load bearing partition wlals with metal studs at 12ft high and sheetrock terminaty at 8ft high; 2 low walls at 46in high and 1 low walll at 25in high. (e) hvac + elec systems to remain as is. | $5,000 |
| Feb 4, 2021 | Expired or cancelled cancelled Nov 2024 | 508 Belvedere St | horizontal expansion in the rear on first and second floors. demo of rear facade, relocate a kitchen, relocate two bathrooms, rearrange solar panels.Details
horizontal expansion in the rear on first and second floors. demo of rear facade, relocate a kitchen, relocate two bathrooms, rearrange solar panels. | $50,000 |
| Nov 18, 2020 | Completed final sign-off Sep 2022 | 3508 23rd St | revision to phase i pa #202002124293. remodel unit 1 on 2nd fl & unit 2 on 3rd fl. remove full bath from unit & add bath to unit 2. full seismic upgrade.Details
revision to phase i pa #202002124293. remodel unit 1 on 2nd fl & unit 2 on 3rd fl. remove full bath from unit & add bath to unit 2. full seismic upgrade. | $175,000 |
| Aug 12, 2020 | Completed final sign-off Sep 2022 | 3508 23rd St | add adu with (2) bedroom & (2) baths to 1st floor.Details
add adu with (2) bedroom & (2) baths to 1st floor. | $180,000 |
| Nov 7, 2019 | Completed final sign-off Aug 2020 | 203 Willow St | unit #202: interior renovation of (e) business. new non structural partitions, floor, & lighting. relocation of existing sprinklers & ada compliance upgrades as reasonable & feasible. mech & sprinkler to be deferred submittalsDetails
unit #202: interior renovation of (e) business. new non structural partitions, floor, & lighting. relocation of existing sprinklers & ada compliance upgrades as reasonable & feasible. mech & sprinkler to be deferred submittals | $75,000 |
| Nov 7, 2019 | Completed final sign-off Aug 2020 | 203 Willow St | unit #203: interior renovation of (e) business. new non structural partitions, floor, & lighting. relocation of existing sprinklers & ada compliance upgrades as reasonable & feasible. mech & sprinkler to be deferred submittalsDetails
unit #203: interior renovation of (e) business. new non structural partitions, floor, & lighting. relocation of existing sprinklers & ada compliance upgrades as reasonable & feasible. mech & sprinkler to be deferred submittals | $75,000 |
| May 20, 2019 | Completed final sign-off May 2019 | 1555 Mcallister St | to obtain final inspection for wok approved under pa#201612286003. all work is completeDetails
to obtain final inspection for wok approved under pa#201612286003. all work is complete | |
| Jul 30, 2018 | Completed final sign-off Jan 2020 | 943 Page St | rear bldg: legalization of (e) rear adu per ordinance# 43-14. 1 bed & 1 bath. ** maher: n/a **Details
rear bldg: legalization of (e) rear adu per ordinance# 43-14. 1 bed & 1 bath. ** maher: n/a ** | $10,000 |
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 3055 23rd St | to comply with nov 201850941 - remodel (e) bathroom for ada compliance maher naDetails
to comply with nov 201850941 - remodel (e) bathroom for ada compliance maher na | $20,000 |
| Jan 23, 2018 | Completed final sign-off Sep 2019 | 941 Page St | demo wall, add new walls, perimeter slab/wall. replacement and lower slab 1' max for future adu.Details
demo wall, add new walls, perimeter slab/wall. replacement and lower slab 1' max for future adu. | $65,000 |
| Jan 23, 2018 | Completed final sign-off Dec 2019 | 941 Page St | add unit per ord 162-16. add 1 accessory dwelling unit to 1st flr per ordinance 162-16.Details
add unit per ord 162-16. add 1 accessory dwelling unit to 1st flr per ordinance 162-16. | $50,000 |
| Jan 18, 2018 | Completed final sign-off Aug 2019 | 10 Argent Al | remove existing window replacing with new windows approx. 48.Details
remove existing window replacing with new windows approx. 48. | $50,000 |
| Sep 11, 2017 | Completed final sign-off Sep 2019 | 941 Page St | soft story upgarde of first floor per ab-106, 107 and chapter 4d of sfbc and chapter 34 of cbc 2016 appendix a-4.Details
soft story upgarde of first floor per ab-106, 107 and chapter 4d of sfbc and chapter 34 of cbc 2016 appendix a-4. | $46,000 |
| Sep 11, 2017 | Completed final sign-off Dec 2019 | 1230 Washington St | soft story rerofit per sfebc chapter 4d, 2016 cebc appendix a4. soft story upgarde of first floor per ab-106, 107Details
soft story rerofit per sfebc chapter 4d, 2016 cebc appendix a4. soft story upgarde of first floor per ab-106, 107 | $10,000 |
| Sep 11, 2017 | Completed final sign-off Dec 2019 | 1315 Taylor St | soft story upgarde of first floor per sfebc chapter 4d, 2016 cebc appendix a-4, ab-106, 1072016Details
soft story upgarde of first floor per sfebc chapter 4d, 2016 cebc appendix a-4, ab-106, 1072016 | $30,000 |
| Jul 20, 2017 | Completed final sign-off Feb 2019 | 1555 Mcallister St | remodel (3) kitchens, (6) bathrooms, (3) half baths; remove (e) ceilings in units, add sound insultation.Details
remodel (3) kitchens, (6) bathrooms, (3) half baths; remove (e) ceilings in units, add sound insultation. | $80,000 |
| May 12, 2017 | Completed final sign-off Sep 2019 | 10 Argent Al | soft story upgrade of 1st floor per ab106,107 & chapter 4d of cbc 2016Details
soft story upgrade of 1st floor per ab106,107 & chapter 4d of cbc 2016 | $119,000 |
| Feb 8, 2017 | Completed final sign-off Aug 2017 | 834 Corbett Av | stucco - remove and replace in full - street side visible (50' x 40')Details
stucco - remove and replace in full - street side visible (50' x 40') | $8,000 |
| Jan 26, 2017 | Completed final sign-off Jul 2017 | 18 Vicksburg St | revision to 201206213128 removal of approved window (transom) to be replaced with new wood door and transom window aboveDetails
revision to 201206213128 removal of approved window (transom) to be replaced with new wood door and transom window above | |
| Dec 28, 2016 | Expired or cancelled expired Feb 2025 | 1555 Mcallister St | new garage with 8'-0" garage doorDetails
new garage with 8'-0" garage door | $20,000 |
| Nov 22, 2016 | Completed final sign-off Feb 2025 | 435 Alvarado St | renovate (e)(3)story over (1)basement single family. horizontal addition @ rear & vertical addition @ (e) attic @ 4th fl bedroom. upgrade bathrooms, kitchen & utilities including addition of a fire sprinkler system throughout (e) street facade to remain.Details
renovate (e)(3)story over (1)basement single family. horizontal addition @ rear & vertical addition @ (e) attic @ 4th fl bedroom. upgrade bathrooms, kitchen & utilities including addition of a fire sprinkler system throughout (e) street facade to remain. | $750,000 |
| Oct 27, 2016 | Completed final sign-off Aug 2017 | 834 Corbett Av | window replacement - 12 in front - 6 in the rear - aluminum to aluminum 18 in the lightwells.Details
window replacement - 12 in front - 6 in the rear - aluminum to aluminum 18 in the lightwells. | $40,000 |
| Oct 27, 2016 | Completed final sign-off Aug 2017 | 830 Corbett Av | window replacment - 9 front windows - 12 in the rear - aluminum to aluminum.Details
window replacment - 9 front windows - 12 in the rear - aluminum to aluminum. | $41,000 |
| May 12, 2016 | Never finaled issued May 2016, no final | 18 Vicksburg St | temp earth & building shoring system to accomodate excavation for new construction ref pa 2012 0621 3128Details
temp earth & building shoring system to accomodate excavation for new construction ref pa 2012 0621 3128 | $200,000 |
| Mar 18, 2016 | Completed final sign-off Jun 2016 | 427 14th Av | new wood deck in rear yard.Details
new wood deck in rear yard. | $7,000 |
| Mar 1, 2016 | Completed final sign-off Jun 2016 | 427 14th Av | remodel 2 existing bathrooms and 1 kitchen, at same area of the floor. kitchen lighting & control per cbc 150(k)Details
remodel 2 existing bathrooms and 1 kitchen, at same area of the floor. kitchen lighting & control per cbc 150(k) | $30,000 |
| Mar 1, 2016 | Never finaled issued Mar 2016, no final | 48 San Jose Av | remodel unit 1: kitchen & bathroom; remodel unit 3: kitchen & bathroomDetails
remodel unit 1: kitchen & bathroom; remodel unit 3: kitchen & bathroom | $30,000 |
| Feb 11, 2016 | Completed final sign-off Aug 2017 | 830 Corbett Av | soft story upgrade of 1st floor and basement per sfbc chapter 34bDetails
soft story upgrade of 1st floor and basement per sfbc chapter 34b | $70,000 |
| Feb 11, 2016 | Completed final sign-off Aug 2017 | 834 Corbett Av | soft storey upgrade of 1st floor and basement per ab106Details
soft storey upgrade of 1st floor and basement per ab106 | $110,000 |
| Jan 29, 2016 | Completed final sign-off Jun 2016 | 427 14th Av | remodel 1s fl, convert e storage to new family room, new bath, new bedroom, new closet, new laundry. new habitable space 633 sq ftDetails
remodel 1s fl, convert e storage to new family room, new bath, new bedroom, new closet, new laundry. new habitable space 633 sq ft | $30,000 |
| Jan 6, 2016 | Completed final sign-off Feb 2018 | 184 Forest Side Av | removal/addition of interior partitions, upgrading interior finishes, upgrading mep systems. removal of exterior stair and addition of exterior deck, remokdel of kitchen and bathrooms. capture of exterior under stair storage i nto finished space at ground floor levelDetails
removal/addition of interior partitions, upgrading interior finishes, upgrading mep systems. removal of exterior stair and addition of exterior deck, remokdel of kitchen and bathrooms. capture of exterior under stair storage i nto finished space at ground floor level | $200,000 |
| Dec 29, 2015 | Completed final sign-off Jun 2016 | 427 14th Av | replace foundation in kind. new steel collector beam with foundation.Details
replace foundation in kind. new steel collector beam with foundation. | $30,000 |
| Aug 11, 2015 | Completed final sign-off Mar 2016 | 662 Hampshire St | revision to 2014 0124 7059: add to rof deck and interior stairs.Details
revision to 2014 0124 7059: add to rof deck and interior stairs. | $7,000 |
| Dec 18, 2014 | Completed final sign-off Sep 2015 | 3507 23rd St | remodel 3 kitchens (2 relocated) remodel 4 baths (3 relocated) remodel 1/2 bath (relocated); add 1/2 bath, add 2 baths. add 2 bedrms & 2 baths in 3rd story. expand unit #3 into storage area. relocate interior stairs within top unit #1,remove fire escape ladder,remove rear stairs,add 4 skylights.Details
remodel 3 kitchens (2 relocated) remodel 4 baths (3 relocated) remodel 1/2 bath (relocated); add 1/2 bath, add 2 baths. add 2 bedrms & 2 baths in 3rd story. expand unit #3 into storage area. relocate interior stairs within top unit #1,remove fire escape ladder,remove rear stairs,add 4 skylights. | $495,000 |
| Nov 13, 2014 | Completed final sign-off Nov 2014 | 333 El Camino Del Mar | revision to permit 2013 0219 0440 - scope includes removal of one skyligh previously approvedDetails
revision to permit 2013 0219 0440 - scope includes removal of one skyligh previously approved | |
| Nov 12, 2014 | Completed final sign-off Feb 2016 | 96 Sotelo Av | replace (e) window in breakfast nook with pair french doors. replace (e) window in master bedroom closet with pair french doors. install new balconies (premanufactured decorative) to match (e) at each new door. both windows to be replaced are on front facade of three story single-family residence.Details
replace (e) window in breakfast nook with pair french doors. replace (e) window in master bedroom closet with pair french doors. install new balconies (premanufactured decorative) to match (e) at each new door. both windows to be replaced are on front facade of three story single-family residence. | $25,000 |
| Oct 21, 2014 | Completed final sign-off Feb 2015 | 1646 Palou Av | temporary support of (e) rear exit stairs, plans will be submitted for stair replacement within 21 days.Details
temporary support of (e) rear exit stairs, plans will be submitted for stair replacement within 21 days. | $3,000 |
| Sep 5, 2014 | Never finaled issued Sep 2014, no final | 150 Lombard St | interior remodel to unit 48. remove & reconfigure (e) interior partitons. upgrade flooring, ceiling, interior paritions, finishes. upgrade elec and plumbing, (e) common areas not included. compliance with maher ordinance 155-13 not required.Details
interior remodel to unit 48. remove & reconfigure (e) interior partitons. upgrade flooring, ceiling, interior paritions, finishes. upgrade elec and plumbing, (e) common areas not included. compliance with maher ordinance 155-13 not required. | $50,000 |
| Jul 21, 2014 | Completed final sign-off Sep 2015 | 3507 23rd St | replace portions of extg foundation in basement per plan.Details
replace portions of extg foundation in basement per plan. | $35,000 |
| Jun 11, 2014 | Expired or cancelled cancelled Jan 2026 | 96 Sotelo Av | replace (e) window in breakfast nook w/pair french doors, replace (e) window in master bedroom closet w/pair french doors. install new balconies to match (e) at each new door. replace both windows on front facade.Details
replace (e) window in breakfast nook w/pair french doors, replace (e) window in master bedroom closet w/pair french doors. install new balconies to match (e) at each new door. replace both windows on front facade. | $25,000 |
| Jun 6, 2014 | Completed final sign-off Jun 2017 | 3839 23rd St | interior renovation to an (e) 3-story single family home. horizontal rear addition, adding a (n) bedroom & bathroom.Details
interior renovation to an (e) 3-story single family home. horizontal rear addition, adding a (n) bedroom & bathroom. | $700,000 |
| May 13, 2014 | Completed final sign-off Aug 2016 | 668 23rd Av | horizontal addition (171 sq. ft.) on 2nd floor. add roof deck. horizontal addition @ rear (519 sq. ft.) on ground floor, with 5'excavation to includes 3 bedrooms, 2 baths, and laundray room.Details
horizontal addition (171 sq. ft.) on 2nd floor. add roof deck. horizontal addition @ rear (519 sq. ft.) on ground floor, with 5'excavation to includes 3 bedrooms, 2 baths, and laundray room. | $120,000 |
| May 9, 2014 | Completed final sign-off Aug 2017 | 250 Parnassus Av | to comply with complaint 201470831 remove exising stucco replace damaged sheeting, framing install. new cement board siding 1,000 sq ft back of house & sideDetails
to comply with complaint 201470831 remove exising stucco replace damaged sheeting, framing install. new cement board siding 1,000 sq ft back of house & side | $20,000 |
| Jan 13, 2014 | Completed final sign-off Jul 2014 | 96 Sotelo Av | interior remodel to existing three story single family residence. kitchen & powder room remodel at 1st floor, master bath & closet remodel at 2nd floor.Details
interior remodel to existing three story single family residence. kitchen & powder room remodel at 1st floor, master bath & closet remodel at 2nd floor. | $25,000 |
| Jul 30, 2013 | Completed final sign-off May 2014 | 140 Geary St | 8th floor:interior remodel of extg office space for use as an office space removal and construction of non structural interior walls, relocation of extg lighting. no new lights, ada compliance upgrade as reasonably feasible. no exterior work. no plmg work, no mechanical work. life safety separateDetails
8th floor:interior remodel of extg office space for use as an office space removal and construction of non structural interior walls, relocation of extg lighting. no new lights, ada compliance upgrade as reasonably feasible. no exterior work. no plmg work, no mechanical work. life safety separate | $90,000 |
| Jul 24, 2013 | Never finaled issued Aug 2013, no final | 815 Eddy St | 1st floor-revision to pa# 2012-0713-4759-remove (e) cubicles & replace with individual offices. relocate (e) lights, rebalance (e) mechanical supply, replace rated shaft wall at exit stairs with equivalent rated glass wall. no exterior work, no plumbing, sprinklers, fire alarm under seperate permitsDetails
1st floor-revision to pa# 2012-0713-4759-remove (e) cubicles & replace with individual offices. relocate (e) lights, rebalance (e) mechanical supply, replace rated shaft wall at exit stairs with equivalent rated glass wall. no exterior work, no plumbing, sprinklers, fire alarm under seperate permits | $20,000 |
| Jul 16, 2013 | Completed final sign-off Jul 2013 | 4206 22nd St | minor revision to app#201203166214 to document altered configuration of stairway at rear which accesses lower patio.Details
minor revision to app#201203166214 to document altered configuration of stairway at rear which accesses lower patio. | |
| Feb 19, 2013 | Completed final sign-off Nov 2014 | 333 El Camino Del Mar | remodel & addition to (e) 2,937 sq ft 2-story single family residence w/ 1-car garage. project scope includes conversion of basement into habitable space, interior remodel & horizontal addition @ 1st & 2nd flrs. (n) roof penthouse & 500 sq ft roof deck. kitchen remodel & add 1 bathroom.Details
remodel & addition to (e) 2,937 sq ft 2-story single family residence w/ 1-car garage. project scope includes conversion of basement into habitable space, interior remodel & horizontal addition @ 1st & 2nd flrs. (n) roof penthouse & 500 sq ft roof deck. kitchen remodel & add 1 bathroom. | $200,000 |
| Nov 21, 2012 | Completed final sign-off May 2014 | 257 Edgewood Av | remodel & addition to (e) 2 story, single family residence. interior remodel & addition to 1st & 2nd floors includes new patio & planters at rear yard.Details
remodel & addition to (e) 2 story, single family residence. interior remodel & addition to 1st & 2nd floors includes new patio & planters at rear yard. | $400,000 |
| Sep 28, 2012 | Completed final sign-off Apr 2013 | 815 Eddy St | exterior remodel-new storefront, new wood picket gates & fence. re-finish deck & replace (e) guardrails. new lightingDetails
exterior remodel-new storefront, new wood picket gates & fence. re-finish deck & replace (e) guardrails. new lighting | $41,000 |
| Sep 14, 2012 | Completed final sign-off Apr 2013 | 815 Eddy St | 3rd floor-interior remodel of (e) office space. relocation of interior non structural walls, mechanical supply, lighting & plumbing. ada uprgades to (e) restroomsDetails
3rd floor-interior remodel of (e) office space. relocation of interior non structural walls, mechanical supply, lighting & plumbing. ada uprgades to (e) restrooms | $51,400 |
| Sep 14, 2012 | Completed final sign-off Apr 2013 | 815 Eddy St | 2nd floor-change of use from b-67 to b-10-interior remodel of (e) office space. relocation of interior non structural walls, mechanical supply, lighting & plumbing. ada uprgades to (e) restroomsDetails
2nd floor-change of use from b-67 to b-10-interior remodel of (e) office space. relocation of interior non structural walls, mechanical supply, lighting & plumbing. ada uprgades to (e) restrooms | $72,300 |
| Aug 31, 2012 | Expired or cancelled expired Jul 2015 | 1651 08th Av | remodel 2 existing bathrooms - replace tub, sinks, toilets & fixtures, non structural.Details
remodel 2 existing bathrooms - replace tub, sinks, toilets & fixtures, non structural. | $20,000 |
| Aug 7, 2012 | Expired or cancelled expired Jul 2015 | 1651 08th Av | renovate & re-configure (e) 3rd floor-new bathroom & bedroom, replace (e) windows, not visible from the streetDetails
renovate & re-configure (e) 3rd floor-new bathroom & bedroom, replace (e) windows, not visible from the street | $50,000 |
| Aug 3, 2012 | Never finaled issued Sep 2012, no final | 801 Indiana St | (n) stair (metal) in (e) bldg. (n) metal stair to be installed in (e) building. carbon monoxide detectors installed as per code.Details
(n) stair (metal) in (e) bldg. (n) metal stair to be installed in (e) building. carbon monoxide detectors installed as per code. | $15,000 |
| Jun 22, 2012 | Never finaled issued Jun 2012, no final | 3120 23rd St | to complete work and obtain final inspection for work approved under app#200607116207Details
to complete work and obtain final inspection for work approved under app#200607116207 | $5,000 |
| Jun 22, 2012 | Never finaled issued Jun 2012, no final | 3120 23rd St | to complete work and obtain final inspection for work approved under app#200607176713Details
to complete work and obtain final inspection for work approved under app#200607176713 | $5,000 |
| Dec 1, 2011 | Completed final sign-off May 2012 | 1651 08th Av | basement renovation. replace extg bathroom and laundry.replace heater.Details
basement renovation. replace extg bathroom and laundry.replace heater. | $50,000 |
| Aug 12, 2011 | Completed final sign-off Apr 2012 | 664 Wisconsin St | revision to 2008-0722-7224 lower basement foundation between grideline 0.1 and 2 and provide additional vertical support for first floor rear deck.Details
revision to 2008-0722-7224 lower basement foundation between grideline 0.1 and 2 and provide additional vertical support for first floor rear deck. | $50,000 |
| Jun 6, 2011 | Completed final sign-off Aug 2011 | 16 Jessie St | #c-120: new art gallery in (e) vacant office. add a kitchennete, ada compliant restrm, closing rm and storage mezzanine. installation of clg mounted system for art work, new lighting and finishes.Details
#c-120: new art gallery in (e) vacant office. add a kitchennete, ada compliant restrm, closing rm and storage mezzanine. installation of clg mounted system for art work, new lighting and finishes. | $121,000 |
| Oct 13, 2010 | Completed final sign-off Mar 2011 | 176 Kenwood Wy | addition to permit #201008269644. add 2 closets and one partition wall. enclose laundry room. repair exterior wall at side of property. replace window and door. new o clearance gas fire place.replace extg furnace.Details
addition to permit #201008269644. add 2 closets and one partition wall. enclose laundry room. repair exterior wall at side of property. replace window and door. new o clearance gas fire place.replace extg furnace. | $5,000 |
| Aug 11, 2010 | Completed final sign-off Aug 2010 | 1177 Church St | stucco repair (front of the bldg), repair damaged stucco area - 40 sq.ft. no structuralDetails
stucco repair (front of the bldg), repair damaged stucco area - 40 sq.ft. no structural | $2,000 |
| Jan 27, 2010 | Completed final sign-off May 2010 | 758 Haight St | unit#2 on 2nd floor. remodel (e) kitchen 10'x10' and bath room 5'x8' . install new cabinet, tub, sink, toilet and tile flooring. no wall removal.Details
unit#2 on 2nd floor. remodel (e) kitchen 10'x10' and bath room 5'x8' . install new cabinet, tub, sink, toilet and tile flooring. no wall removal. | $22,000 |
| Jan 25, 2010 | Never finaled issued Jan 2010, no final | 257 Edgewood Av | revision to pa# 2010/01/11/4533, provide structural details for construction.Details
revision to pa# 2010/01/11/4533, provide structural details for construction. | $10,000 |
| Jan 11, 2010 | Completed final sign-off May 2010 | 257 Edgewood Av | interior remodel of bathrooms closets, and basement. replace some windows in kind with existing. not visible from street. voluntarily remove illegal basement studio;add legal bath at basement.Details
interior remodel of bathrooms closets, and basement. replace some windows in kind with existing. not visible from street. voluntarily remove illegal basement studio;add legal bath at basement. | $100,000 |
| Oct 23, 2009 | Completed final sign-off Jan 2010 | 758 Haight St | remodel kitchen & bathroom in unit #4 only-no structural work. kitchen-replace cabinets & counter, bathroom-replace plumbing fixtures, new lightingDetails
remodel kitchen & bathroom in unit #4 only-no structural work. kitchen-replace cabinets & counter, bathroom-replace plumbing fixtures, new lighting | $27,500 |
| Aug 26, 2009 | Completed final sign-off Nov 2013 | 3120 23rd St | add one story addition to (e) 3-story building. new roof deck. side addition at front 3'x4' approx. remove (e) rear stairs, provide fire sprinkler throughout building.Details
add one story addition to (e) 3-story building. new roof deck. side addition at front 3'x4' approx. remove (e) rear stairs, provide fire sprinkler throughout building. | $120,000 |
| Apr 10, 2009 | Completed final sign-off May 2009 | 315 Santa Clara Av | to obtain final inspection for work approved under #200808219727. all work has been completed.Details
to obtain final inspection for work approved under #200808219727. all work has been completed. | |
| Mar 11, 2009 | Completed final sign-off Jul 2010 | 751 23rd Av | extg front porch to be rebuilt, bay added, glassed in new enclosed porch.Details
extg front porch to be rebuilt, bay added, glassed in new enclosed porch. | $18,000 |
| Jan 27, 2009 | Completed final sign-off Feb 2009 | 2310 Funston Av | to obtain final inspection to work approved under pa #200705030330 all work been completed.Details
to obtain final inspection to work approved under pa #200705030330 all work been completed. | |
| Jan 27, 2009 | Completed final sign-off Feb 2009 | 2310 Funston Av | to obtain final inspection to work approved under pa #200709284081/s. all work been completed.Details
to obtain final inspection to work approved under pa #200709284081/s. all work been completed. | |
| Nov 10, 2008 | Completed final sign-off Dec 2009 | 751 23rd Av | renew pa# 2002/07/26/2464 to complete work & obtain final inspection.Details
renew pa# 2002/07/26/2464 to complete work & obtain final inspection. | $4,000 |
| Apr 15, 2008 | Completed final sign-off Jul 2008 | 21 Marcela Av | existing balcony extension and repair of dryrot.Details
existing balcony extension and repair of dryrot. | $12,000 |
| Aug 13, 2007 | Expired or cancelled expired Jan 2011 | 80 Santa Monica Wy | relocate bathroom and laundry room in basementDetails
relocate bathroom and laundry room in basement | $45,000 |
| Jan 29, 2007 | Completed final sign-off Apr 2007 | 852 Chenery St | renew pa#200406156396s & #200409073514 for final inspection.Details
renew pa#200406156396s & #200409073514 for final inspection. | |
| Nov 15, 2006 | Completed final sign-off Jan 2007 | 318 Staples Av | replace 2 2ide windows of bay window at front of house and 1 picture window at front of house.in kind window replacement. marbin double hung windows (sides) and marvin picture window (all windows are wood)Details
replace 2 2ide windows of bay window at front of house and 1 picture window at front of house.in kind window replacement. marbin double hung windows (sides) and marvin picture window (all windows are wood) | $6,000 |
| Sep 25, 2006 | Completed final sign-off May 2008 | 5 Alma St | remodel of a 5 unit building, add radiant heat for all units, new garage w/in buiding footprint, new electrial service & plumbing for all units. repace all windows and exterior finish. renovate all bathroom & kitchen. provide upgrade to roof framing for future roof terrace.Details
remodel of a 5 unit building, add radiant heat for all units, new garage w/in buiding footprint, new electrial service & plumbing for all units. repace all windows and exterior finish. renovate all bathroom & kitchen. provide upgrade to roof framing for future roof terrace. | $500,000 |
| Jul 7, 2006 | Expired or cancelled expired Jun 2007 | 2717 Pacific Av | reframe wexisting internal stairway form baemetn to 2nd floor and install a new french door in the existing opening occupied by windwos. (french doors are at front & set back about 30' from prop. line)Details
reframe wexisting internal stairway form baemetn to 2nd floor and install a new french door in the existing opening occupied by windwos. (french doors are at front & set back about 30' from prop. line) | $4,000 |
| Jan 17, 2006 | Expired or cancelled expired Jun 2006 | 1434 Portola Dr | renew app#200312222809 for final inspectionDetails
renew app#200312222809 for final inspection | |
| Nov 14, 2005 | Completed final sign-off Jul 2006 | 90 Westwood Dr | removal of (e) door, to be replaced by new windows on side of building at stairwellDetails
removal of (e) door, to be replaced by new windows on side of building at stairwell | $500 |
| Aug 3, 2005 | Completed final sign-off Sep 2005 | 875 26th Av | replace kitchen cabinets, no structural work, provide flourescent light fixturesDetails
replace kitchen cabinets, no structural work, provide flourescent light fixtures | $8,000 |
| Jul 27, 2004 | Completed final sign-off Jan 2005 | 1230 Green St | kitchen & bath remodel to unit on the 3rd fl including new plumbing fixtures, appliances, cabinets &Details
kitchen & bath remodel to unit on the 3rd fl including new plumbing fixtures, appliances, cabinets & | $25,000 |
| Oct 21, 2003 | Completed final sign-off Feb 2005 | 259 Athens St | consruct 2 bedroom/hallway/half bath/2 new vinyl windows/roof/elecrical plmgDetails
consruct 2 bedroom/hallway/half bath/2 new vinyl windows/roof/elecrical plmg | $35,000 |
| Jul 3, 2003 | Completed final sign-off Oct 2003 | 275 Mallorca Wy | remodel 2 bathrooms with new fixtures, main living area, no structuralDetails
remodel 2 bathrooms with new fixtures, main living area, no structural | $22,000 |
| Aug 21, 2002 | Expired or cancelled expired Dec 2004 | 259 Athens St | repair foundation on southwestern & eastern sidesDetails
repair foundation on southwestern & eastern sides | $12,000 |
| Jan 4, 2002 | Completed final sign-off May 2002 | 3021 Baker St | remodel kitchen and athroom. existing install new cabinets, tub, sink and toilet . no structureal onDetails
remodel kitchen and athroom. existing install new cabinets, tub, sink and toilet . no structureal on | $30,000 |
| Jul 24, 2001 | Expired or cancelled expired Nov 2001 | 1770 Golden Gate Av | replace exist french doors & windows at rear of buildingDetails
replace exist french doors & windows at rear of building | $5,000 |
| Jul 3, 2001 | Completed final sign-off Dec 2001 | 941 Page St | remodel kitchen and bathroom. install new cabinet , tub, sink and toilet. no structuralDetails
remodel kitchen and bathroom. install new cabinet , tub, sink and toilet. no structural | $12,000 |
| Jun 20, 2001 | Expired or cancelled expired Oct 2001 | 2 Perine Pl | repair existing landing w/new redwoodDetails
repair existing landing w/new redwood | $800 |
| May 24, 2001 | Completed final sign-off Sep 2001 | 1248 05th Av | remodel kitchen, new cabinets, counter top, electrical & plumbingDetails
remodel kitchen, new cabinets, counter top, electrical & plumbing | $30,000 |
| Aug 8, 2000 | Completed final sign-off Apr 2001 | 675 Castro St | erect (n) wood deck @ rear yard of (e) residenceDetails
erect (n) wood deck @ rear yard of (e) residence | $5,000 |