Back to bathroom remodel contractors
Dermot Barry Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Jan 2023
- Last 24 months
- 0 permits filed
92 permits since 2000: 71 completed, 10 never finaled, 11 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
28 bathroom remodel permits: 22 completed, 2 never finaled, 4 expired or cancelled. Typically 14 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2021 | Expired or cancelled cancelled Nov 2024 | 508 Belvedere St | horizontal expansion in the rear on first and second floors. demo of rear facade, relocate a kitchen, relocate two bathrooms, rearrange solar panels.Details
horizontal expansion in the rear on first and second floors. demo of rear facade, relocate a kitchen, relocate two bathrooms, rearrange solar panels. | $50,000 |
| Nov 18, 2020 | Completed final sign-off Sep 2022 | 3508 23rd St | revision to phase i pa #202002124293. remodel unit 1 on 2nd fl & unit 2 on 3rd fl. remove full bath from unit & add bath to unit 2. full seismic upgrade.Details
revision to phase i pa #202002124293. remodel unit 1 on 2nd fl & unit 2 on 3rd fl. remove full bath from unit & add bath to unit 2. full seismic upgrade. | $175,000 |
| Aug 12, 2020 | Completed final sign-off Sep 2022 | 3508 23rd St | add adu with (2) bedroom & (2) baths to 1st floor.Details
add adu with (2) bedroom & (2) baths to 1st floor. | $180,000 |
| Jul 30, 2018 | Completed final sign-off Jan 2020 | 943 Page St | rear bldg: legalization of (e) rear adu per ordinance# 43-14. 1 bed & 1 bath. ** maher: n/a **Details
rear bldg: legalization of (e) rear adu per ordinance# 43-14. 1 bed & 1 bath. ** maher: n/a ** | $10,000 |
| Mar 29, 2018 | Never finaled filed Mar 2018, never issued | 3055 23rd St | to comply with nov 201850941 - remodel (e) bathroom for ada compliance maher naDetails
to comply with nov 201850941 - remodel (e) bathroom for ada compliance maher na | $20,000 |
| Jul 20, 2017 | Completed final sign-off Feb 2019 | 1555 Mcallister St | remodel (3) kitchens, (6) bathrooms, (3) half baths; remove (e) ceilings in units, add sound insultation.Details
remodel (3) kitchens, (6) bathrooms, (3) half baths; remove (e) ceilings in units, add sound insultation. | $80,000 |
| Nov 22, 2016 | Completed final sign-off Feb 2025 | 435 Alvarado St | renovate (e)(3)story over (1)basement single family. horizontal addition @ rear & vertical addition @ (e) attic @ 4th fl bedroom. upgrade bathrooms, kitchen & utilities including addition of a fire sprinkler system throughout (e) street facade to remain.Details
renovate (e)(3)story over (1)basement single family. horizontal addition @ rear & vertical addition @ (e) attic @ 4th fl bedroom. upgrade bathrooms, kitchen & utilities including addition of a fire sprinkler system throughout (e) street facade to remain. | $750,000 |
| Mar 1, 2016 | Never finaled issued Mar 2016, no final | 48 San Jose Av | remodel unit 1: kitchen & bathroom; remodel unit 3: kitchen & bathroomDetails
remodel unit 1: kitchen & bathroom; remodel unit 3: kitchen & bathroom | $30,000 |
| Mar 1, 2016 | Completed final sign-off Jun 2016 | 427 14th Av | remodel 2 existing bathrooms and 1 kitchen, at same area of the floor. kitchen lighting & control per cbc 150(k)Details
remodel 2 existing bathrooms and 1 kitchen, at same area of the floor. kitchen lighting & control per cbc 150(k) | $30,000 |
| Jan 29, 2016 | Completed final sign-off Jun 2016 | 427 14th Av | remodel 1s fl, convert e storage to new family room, new bath, new bedroom, new closet, new laundry. new habitable space 633 sq ftDetails
remodel 1s fl, convert e storage to new family room, new bath, new bedroom, new closet, new laundry. new habitable space 633 sq ft | $30,000 |
| Jan 6, 2016 | Completed final sign-off Feb 2018 | 184 Forest Side Av | removal/addition of interior partitions, upgrading interior finishes, upgrading mep systems. removal of exterior stair and addition of exterior deck, remokdel of kitchen and bathrooms. capture of exterior under stair storage i nto finished space at ground floor levelDetails
removal/addition of interior partitions, upgrading interior finishes, upgrading mep systems. removal of exterior stair and addition of exterior deck, remokdel of kitchen and bathrooms. capture of exterior under stair storage i nto finished space at ground floor level | $200,000 |
| Dec 18, 2014 | Completed final sign-off Sep 2015 | 3507 23rd St | remodel 3 kitchens (2 relocated) remodel 4 baths (3 relocated) remodel 1/2 bath (relocated); add 1/2 bath, add 2 baths. add 2 bedrms & 2 baths in 3rd story. expand unit #3 into storage area. relocate interior stairs within top unit #1,remove fire escape ladder,remove rear stairs,add 4 skylights.Details
remodel 3 kitchens (2 relocated) remodel 4 baths (3 relocated) remodel 1/2 bath (relocated); add 1/2 bath, add 2 baths. add 2 bedrms & 2 baths in 3rd story. expand unit #3 into storage area. relocate interior stairs within top unit #1,remove fire escape ladder,remove rear stairs,add 4 skylights. | $495,000 |
| Jun 6, 2014 | Completed final sign-off Jun 2017 | 3839 23rd St | interior renovation to an (e) 3-story single family home. horizontal rear addition, adding a (n) bedroom & bathroom.Details
interior renovation to an (e) 3-story single family home. horizontal rear addition, adding a (n) bedroom & bathroom. | $700,000 |
| May 13, 2014 | Completed final sign-off Aug 2016 | 668 23rd Av | horizontal addition (171 sq. ft.) on 2nd floor. add roof deck. horizontal addition @ rear (519 sq. ft.) on ground floor, with 5'excavation to includes 3 bedrooms, 2 baths, and laundray room.Details
horizontal addition (171 sq. ft.) on 2nd floor. add roof deck. horizontal addition @ rear (519 sq. ft.) on ground floor, with 5'excavation to includes 3 bedrooms, 2 baths, and laundray room. | $120,000 |
| Jan 13, 2014 | Completed final sign-off Jul 2014 | 96 Sotelo Av | interior remodel to existing three story single family residence. kitchen & powder room remodel at 1st floor, master bath & closet remodel at 2nd floor.Details
interior remodel to existing three story single family residence. kitchen & powder room remodel at 1st floor, master bath & closet remodel at 2nd floor. | $25,000 |
| Feb 19, 2013 | Completed final sign-off Nov 2014 | 333 El Camino Del Mar | remodel & addition to (e) 2,937 sq ft 2-story single family residence w/ 1-car garage. project scope includes conversion of basement into habitable space, interior remodel & horizontal addition @ 1st & 2nd flrs. (n) roof penthouse & 500 sq ft roof deck. kitchen remodel & add 1 bathroom.Details
remodel & addition to (e) 2,937 sq ft 2-story single family residence w/ 1-car garage. project scope includes conversion of basement into habitable space, interior remodel & horizontal addition @ 1st & 2nd flrs. (n) roof penthouse & 500 sq ft roof deck. kitchen remodel & add 1 bathroom. | $200,000 |
| Aug 31, 2012 | Expired or cancelled expired Jul 2015 | 1651 08th Av | remodel 2 existing bathrooms - replace tub, sinks, toilets & fixtures, non structural.Details
remodel 2 existing bathrooms - replace tub, sinks, toilets & fixtures, non structural. | $20,000 |
| Aug 7, 2012 | Expired or cancelled expired Jul 2015 | 1651 08th Av | renovate & re-configure (e) 3rd floor-new bathroom & bedroom, replace (e) windows, not visible from the streetDetails
renovate & re-configure (e) 3rd floor-new bathroom & bedroom, replace (e) windows, not visible from the street | $50,000 |
| Dec 1, 2011 | Completed final sign-off May 2012 | 1651 08th Av | basement renovation. replace extg bathroom and laundry.replace heater.Details
basement renovation. replace extg bathroom and laundry.replace heater. | $50,000 |
| Jan 27, 2010 | Completed final sign-off May 2010 | 758 Haight St | unit#2 on 2nd floor. remodel (e) kitchen 10'x10' and bath room 5'x8' . install new cabinet, tub, sink, toilet and tile flooring. no wall removal.Details
unit#2 on 2nd floor. remodel (e) kitchen 10'x10' and bath room 5'x8' . install new cabinet, tub, sink, toilet and tile flooring. no wall removal. | $22,000 |
| Jan 11, 2010 | Completed final sign-off May 2010 | 257 Edgewood Av | interior remodel of bathrooms closets, and basement. replace some windows in kind with existing. not visible from street. voluntarily remove illegal basement studio;add legal bath at basement.Details
interior remodel of bathrooms closets, and basement. replace some windows in kind with existing. not visible from street. voluntarily remove illegal basement studio;add legal bath at basement. | $100,000 |
| Oct 23, 2009 | Completed final sign-off Jan 2010 | 758 Haight St | remodel kitchen & bathroom in unit #4 only-no structural work. kitchen-replace cabinets & counter, bathroom-replace plumbing fixtures, new lightingDetails
remodel kitchen & bathroom in unit #4 only-no structural work. kitchen-replace cabinets & counter, bathroom-replace plumbing fixtures, new lighting | $27,500 |
| Aug 13, 2007 | Expired or cancelled expired Jan 2011 | 80 Santa Monica Wy | relocate bathroom and laundry room in basementDetails
relocate bathroom and laundry room in basement | $45,000 |
| Sep 25, 2006 | Completed final sign-off May 2008 | 5 Alma St | remodel of a 5 unit building, add radiant heat for all units, new garage w/in buiding footprint, new electrial service & plumbing for all units. repace all windows and exterior finish. renovate all bathroom & kitchen. provide upgrade to roof framing for future roof terrace.Details
remodel of a 5 unit building, add radiant heat for all units, new garage w/in buiding footprint, new electrial service & plumbing for all units. repace all windows and exterior finish. renovate all bathroom & kitchen. provide upgrade to roof framing for future roof terrace. | $500,000 |
| Jul 27, 2004 | Completed final sign-off Jan 2005 | 1230 Green St | kitchen & bath remodel to unit on the 3rd fl including new plumbing fixtures, appliances, cabinets &Details
kitchen & bath remodel to unit on the 3rd fl including new plumbing fixtures, appliances, cabinets & | $25,000 |
| Oct 21, 2003 | Completed final sign-off Feb 2005 | 259 Athens St | consruct 2 bedroom/hallway/half bath/2 new vinyl windows/roof/elecrical plmgDetails
consruct 2 bedroom/hallway/half bath/2 new vinyl windows/roof/elecrical plmg | $35,000 |
| Jul 3, 2003 | Completed final sign-off Oct 2003 | 275 Mallorca Wy | remodel 2 bathrooms with new fixtures, main living area, no structuralDetails
remodel 2 bathrooms with new fixtures, main living area, no structural | $22,000 |
| Jul 3, 2001 | Completed final sign-off Dec 2001 | 941 Page St | remodel kitchen and bathroom. install new cabinet , tub, sink and toilet. no structuralDetails
remodel kitchen and bathroom. install new cabinet , tub, sink and toilet. no structural | $12,000 |