Back to kitchen remodel contractors
Dermot Barry Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Jan 2023
- Last 24 months
- 0 permits filed
92 permits since 2000: 71 completed, 10 never finaled, 11 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 16 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 24, 2023 | Never finaled issued Feb 2023, no final | 1770 Golden Gate Av | unit #1: remove walls between kitchen, dining & family room. kitchen remodel @ unit #1.Details
unit #1: remove walls between kitchen, dining & family room. kitchen remodel @ unit #1. | $200,000 |
| Feb 4, 2021 | Expired or cancelled cancelled Nov 2024 | 508 Belvedere St | horizontal expansion in the rear on first and second floors. demo of rear facade, relocate a kitchen, relocate two bathrooms, rearrange solar panels.Details
horizontal expansion in the rear on first and second floors. demo of rear facade, relocate a kitchen, relocate two bathrooms, rearrange solar panels. | $50,000 |
| Jul 20, 2017 | Completed final sign-off Feb 2019 | 1555 Mcallister St | remodel (3) kitchens, (6) bathrooms, (3) half baths; remove (e) ceilings in units, add sound insultation.Details
remodel (3) kitchens, (6) bathrooms, (3) half baths; remove (e) ceilings in units, add sound insultation. | $80,000 |
| Nov 22, 2016 | Completed final sign-off Feb 2025 | 435 Alvarado St | renovate (e)(3)story over (1)basement single family. horizontal addition @ rear & vertical addition @ (e) attic @ 4th fl bedroom. upgrade bathrooms, kitchen & utilities including addition of a fire sprinkler system throughout (e) street facade to remain.Details
renovate (e)(3)story over (1)basement single family. horizontal addition @ rear & vertical addition @ (e) attic @ 4th fl bedroom. upgrade bathrooms, kitchen & utilities including addition of a fire sprinkler system throughout (e) street facade to remain. | $750,000 |
| Mar 1, 2016 | Never finaled issued Mar 2016, no final | 48 San Jose Av | remodel unit 1: kitchen & bathroom; remodel unit 3: kitchen & bathroomDetails
remodel unit 1: kitchen & bathroom; remodel unit 3: kitchen & bathroom | $30,000 |
| Mar 1, 2016 | Completed final sign-off Jun 2016 | 427 14th Av | remodel 2 existing bathrooms and 1 kitchen, at same area of the floor. kitchen lighting & control per cbc 150(k)Details
remodel 2 existing bathrooms and 1 kitchen, at same area of the floor. kitchen lighting & control per cbc 150(k) | $30,000 |
| Jan 6, 2016 | Completed final sign-off Feb 2018 | 184 Forest Side Av | removal/addition of interior partitions, upgrading interior finishes, upgrading mep systems. removal of exterior stair and addition of exterior deck, remokdel of kitchen and bathrooms. capture of exterior under stair storage i nto finished space at ground floor levelDetails
removal/addition of interior partitions, upgrading interior finishes, upgrading mep systems. removal of exterior stair and addition of exterior deck, remokdel of kitchen and bathrooms. capture of exterior under stair storage i nto finished space at ground floor level | $200,000 |
| Dec 18, 2014 | Completed final sign-off Sep 2015 | 3507 23rd St | remodel 3 kitchens (2 relocated) remodel 4 baths (3 relocated) remodel 1/2 bath (relocated); add 1/2 bath, add 2 baths. add 2 bedrms & 2 baths in 3rd story. expand unit #3 into storage area. relocate interior stairs within top unit #1,remove fire escape ladder,remove rear stairs,add 4 skylights.Details
remodel 3 kitchens (2 relocated) remodel 4 baths (3 relocated) remodel 1/2 bath (relocated); add 1/2 bath, add 2 baths. add 2 bedrms & 2 baths in 3rd story. expand unit #3 into storage area. relocate interior stairs within top unit #1,remove fire escape ladder,remove rear stairs,add 4 skylights. | $495,000 |
| Jan 13, 2014 | Completed final sign-off Jul 2014 | 96 Sotelo Av | interior remodel to existing three story single family residence. kitchen & powder room remodel at 1st floor, master bath & closet remodel at 2nd floor.Details
interior remodel to existing three story single family residence. kitchen & powder room remodel at 1st floor, master bath & closet remodel at 2nd floor. | $25,000 |
| Feb 19, 2013 | Completed final sign-off Nov 2014 | 333 El Camino Del Mar | remodel & addition to (e) 2,937 sq ft 2-story single family residence w/ 1-car garage. project scope includes conversion of basement into habitable space, interior remodel & horizontal addition @ 1st & 2nd flrs. (n) roof penthouse & 500 sq ft roof deck. kitchen remodel & add 1 bathroom.Details
remodel & addition to (e) 2,937 sq ft 2-story single family residence w/ 1-car garage. project scope includes conversion of basement into habitable space, interior remodel & horizontal addition @ 1st & 2nd flrs. (n) roof penthouse & 500 sq ft roof deck. kitchen remodel & add 1 bathroom. | $200,000 |
| Jun 6, 2011 | Completed final sign-off Aug 2011 | 16 Jessie St | #c-120: new art gallery in (e) vacant office. add a kitchennete, ada compliant restrm, closing rm and storage mezzanine. installation of clg mounted system for art work, new lighting and finishes.Details
#c-120: new art gallery in (e) vacant office. add a kitchennete, ada compliant restrm, closing rm and storage mezzanine. installation of clg mounted system for art work, new lighting and finishes. | $121,000 |
| Jan 27, 2010 | Completed final sign-off May 2010 | 758 Haight St | unit#2 on 2nd floor. remodel (e) kitchen 10'x10' and bath room 5'x8' . install new cabinet, tub, sink, toilet and tile flooring. no wall removal.Details
unit#2 on 2nd floor. remodel (e) kitchen 10'x10' and bath room 5'x8' . install new cabinet, tub, sink, toilet and tile flooring. no wall removal. | $22,000 |
| Oct 23, 2009 | Completed final sign-off Jan 2010 | 758 Haight St | remodel kitchen & bathroom in unit #4 only-no structural work. kitchen-replace cabinets & counter, bathroom-replace plumbing fixtures, new lightingDetails
remodel kitchen & bathroom in unit #4 only-no structural work. kitchen-replace cabinets & counter, bathroom-replace plumbing fixtures, new lighting | $27,500 |
| Sep 25, 2006 | Completed final sign-off May 2008 | 5 Alma St | remodel of a 5 unit building, add radiant heat for all units, new garage w/in buiding footprint, new electrial service & plumbing for all units. repace all windows and exterior finish. renovate all bathroom & kitchen. provide upgrade to roof framing for future roof terrace.Details
remodel of a 5 unit building, add radiant heat for all units, new garage w/in buiding footprint, new electrial service & plumbing for all units. repace all windows and exterior finish. renovate all bathroom & kitchen. provide upgrade to roof framing for future roof terrace. | $500,000 |
| Aug 3, 2005 | Completed final sign-off Sep 2005 | 875 26th Av | replace kitchen cabinets, no structural work, provide flourescent light fixturesDetails
replace kitchen cabinets, no structural work, provide flourescent light fixtures | $8,000 |
| Jul 27, 2004 | Completed final sign-off Jan 2005 | 1230 Green St | kitchen & bath remodel to unit on the 3rd fl including new plumbing fixtures, appliances, cabinets &Details
kitchen & bath remodel to unit on the 3rd fl including new plumbing fixtures, appliances, cabinets & | $25,000 |
| Jan 4, 2002 | Completed final sign-off May 2002 | 3021 Baker St | remodel kitchen and athroom. existing install new cabinets, tub, sink and toilet . no structureal onDetails
remodel kitchen and athroom. existing install new cabinets, tub, sink and toilet . no structureal on | $30,000 |
| Jul 3, 2001 | Completed final sign-off Dec 2001 | 941 Page St | remodel kitchen and bathroom. install new cabinet , tub, sink and toilet. no structuralDetails
remodel kitchen and bathroom. install new cabinet , tub, sink and toilet. no structural | $12,000 |
| May 24, 2001 | Completed final sign-off Sep 2001 | 1248 05th Av | remodel kitchen, new cabinets, counter top, electrical & plumbingDetails
remodel kitchen, new cabinets, counter top, electrical & plumbing | $30,000 |