Block 1935, lot 011
1651 08th Ave
- City’s use
- Single Family Residential
- Built
- 1914
- Stories
- 2
- Units
- 1
- Rooms
- 5 bedrooms, 5 bathrooms
- Building
- 5,532 sq ft
- Lot
- 7,040 sq ft
- Zoning
- RH1
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 6, 2026 | Completed final sign-off Mar 2026 | 1651 08th Av | Mike Mccurdy Roofing Inc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $57,500 |
| Mar 15, 2019 | Expired or cancelled cancelled Nov 2022 | 1651 08th Av | landscape renovation including engineered footings for new wood fence, concrete stairs with stone veneer low retaining walls 3' mas in front yard and row. metal trellis 8' high maxDetails
landscape renovation including engineered footings for new wood fence, concrete stairs with stone veneer low retaining walls 3' mas in front yard and row. metal trellis 8' high max | $225,000 | |
| Sep 28, 2016 | Completed final sign-off Nov 2016 | 1651 08th Av | Crana Windows & Doors Dba Kevin Mc Laugh | replace garden window in rear of house, in kine. stucco patch.Details
replace garden window in rear of house, in kine. stucco patch. | $2,000 |
| Aug 31, 2012 | Expired or cancelled expired Jul 2015 | 1651 08th Av | Dermot Barry Construction | remodel 2 existing bathrooms - replace tub, sinks, toilets & fixtures, non structural.Details
remodel 2 existing bathrooms - replace tub, sinks, toilets & fixtures, non structural. | $20,000 |
| Aug 7, 2012 | Expired or cancelled expired Jul 2015 | 1651 08th Av | Dermot Barry Construction | renovate & re-configure (e) 3rd floor-new bathroom & bedroom, replace (e) windows, not visible from the streetDetails
renovate & re-configure (e) 3rd floor-new bathroom & bedroom, replace (e) windows, not visible from the street | $50,000 |
| Dec 1, 2011 | Completed final sign-off May 2012 | 1651 08th Av | Dermot Barry Construction | basement renovation. replace extg bathroom and laundry.replace heater.Details
basement renovation. replace extg bathroom and laundry.replace heater. | $50,000 |
| Mar 14, 2002 | Completed final sign-off Apr 2002 | 1651 08th Av | North Point Construction | to renew app#9716742s,2000/08/29/9133,2000/08/29/9124 for final inspection.Details
to renew app#9716742s,2000/08/29/9133,2000/08/29/9124 for final inspection. | |
| Jun 15, 2001 | Completed final sign-off Apr 2002 | 1651 08th Av | North Point Construction | renew appl#9716742, 200008299124 & 200008299133 for final inspectionDetails
renew appl#9716742, 200008299124 & 200008299133 for final inspection | |
| Aug 29, 2000 | Completed final sign-off Apr 2002 | 1651 08th Av | relocate emergency exit ladder from 2nd fl to grade revision to 200008299124Details
relocate emergency exit ladder from 2nd fl to grade revision to 200008299124 | $600 | |
| Aug 29, 2000 | Completed final sign-off Apr 2002 | 1651 08th Av | renewal of application 9716742 for remaining workDetails
renewal of application 9716742 for remaining work | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dermot Barry Construction (3), North Point Construction (2), Crana Windows & Doors Dba Kevin Mc Laugh, Mike Mccurdy Roofing Inc
- Architects
- Jarrod Baumann
- Engineers
- James Toby
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.