294 permits since 2000 (engineer on 276 permits, architect on 14 permits, authorized agent-others on 4 permits): 196 completed, 49 in progress, 26 never finaled, 23 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 294.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 1830 47th Av | Kenneth Chiu | revision to pa#2026-0731-5871: due to (e) floor joists running in the longitudinal direction at the front and rear of the house rather than in the transverse direction originaly assumed in the drawings. changes were made to address actual filed conditionsDetails
revision to pa#2026-0731-5871: due to (e) floor joists running in the longitudinal direction at the front and rear of the house rather than in the transverse direction originaly assumed in the drawings. changes were made to address actual filed conditions | |
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 1519 38th Av | construct 1 bedroom, family room, media room, one full bathroom, powder room and install wet bar at ground floor, construct new staircase at rear of house from 2nd floor down to back yard.Details
construct 1 bedroom, family room, media room, one full bathroom, powder room and install wet bar at ground floor, construct new staircase at rear of house from 2nd floor down to back yard. | $210,000 | |
| Aug 24, 2026 | In progress issued Aug 2026 | 25 Claremont Bl | Arcline Development Inc | revision to pa#: 202608076234. structural drawing (e) floor joists are 2x8 instead of 2x10. and existing footing already existing where new footing was shown. this footing is now shown as existing instead of new. revised slab on grade details.Details
revision to pa#: 202608076234. structural drawing (e) floor joists are 2x8 instead of 2x10. and existing footing already existing where new footing was shown. this footing is now shown as existing instead of new. revised slab on grade details. | |
| Aug 24, 2026 | In progress filed Aug 2026, not yet issued | 2442 26th Av | revision to pa#: 202607295751 and 202604159530. (e) perimeter footing at right (south) of house does not existing so new footing will be installed.Details
revision to pa#: 202607295751 and 202604159530. (e) perimeter footing at right (south) of house does not existing so new footing will be installed. | $1,000 | |
| Aug 21, 2026 | In progress issued Aug 2026 | 1935 Webster St | Wei Li Construction | revision to pa 202507030118 rebuild 2nd/3rd floor stair within existing space. bring framing, rise/run dimensions, stair width, guardrail and handrail height up to codeDetails
revision to pa 202507030118 rebuild 2nd/3rd floor stair within existing space. bring framing, rise/run dimensions, stair width, guardrail and handrail height up to code | $15,000 |
| Aug 20, 2026 | In progress issued Aug 2026 | 2442 41st Av | Arcline Development Inc | revision to bpa: 202607205244 - set back 2 foot from property line on north side wall at ground floor.Details
revision to bpa: 202607205244 - set back 2 foot from property line on north side wall at ground floor. | |
| Aug 14, 2026 | In progress issued Aug 2026 | 627 Santiago St | Arcline Development Inc | 1) relocate (e) kitchen, remodel (e) one bathroom. add one new full bath room. re-built interior staircase and replace (e) sheet rock w/new at 2nd flr. 2) contruct two bedroom. family room and two full bathroom at ground flr.Details
1) relocate (e) kitchen, remodel (e) one bathroom. add one new full bath room. re-built interior staircase and replace (e) sheet rock w/new at 2nd flr. 2) contruct two bedroom. family room and two full bathroom at ground flr. | $383,000 |
| Aug 3, 2026 | In progress issued Aug 2026 | 1471 22nd Av | Quality General Construction Co Inc | revision to #202601204119: relocate bathroom & construct 2 3x3 skylight at 2/f. enlarged deck to 4 ft more at rear of house (14x12x9).Details
revision to #202601204119: relocate bathroom & construct 2 3x3 skylight at 2/f. enlarged deck to 4 ft more at rear of house (14x12x9). | $11,000 |
| Jul 10, 2026 | In progress issued Jul 2026 | 246 El Camino Del Mar | Devoted Construction Incorporated | construct 1 bedroom, 1 full bath at g/f. remodel (e) kitchen, living room, & add half bath on 2/f. remodel (e) bathroom & construct cantilevered deck at 3/f. construct (n) deck w/ spiral stair at rear of house.Details
construct 1 bedroom, 1 full bath at g/f. remodel (e) kitchen, living room, & add half bath on 2/f. remodel (e) bathroom & construct cantilevered deck at 3/f. construct (n) deck w/ spiral stair at rear of house. | $192,000 |
| Jul 8, 2026 | In progress filed Jul 2026, not yet issued | 2524 03rd St | horizontal addition at the rear of the property extending the basement to align with the ground floor and second floor. 2526 03rd st: including a core and shell tenant improvement, new ada restroom, accessible entrance door opener. 2524-03rd st-removal of wall between kitchen and bedroom for open.Details
horizontal addition at the rear of the property extending the basement to align with the ground floor and second floor. 2526 03rd st: including a core and shell tenant improvement, new ada restroom, accessible entrance door opener. 2524-03rd st-removal of wall between kitchen and bedroom for open. | $60,000 | |
| Jul 7, 2026 | In progress filed Jul 2026, not yet issued | 735 40th Av | rear horizontal addition to (e) 3-story duplex building. adding 2 bedrooms and a full bathroom to eachunit. remodel (e) kitchens.Details
rear horizontal addition to (e) 3-story duplex building. adding 2 bedrooms and a full bathroom to eachunit. remodel (e) kitchens. | $380,000 | |
| Jun 29, 2026 | In progress issued Aug 2026 | 674 Elizabeth St | Chl Construction Company | ground fl. addition and 2nd fl. renovation: 2nd fl. relocate (e) kitchen, (e) dining rm, demo fireplace, (n) stair to ground fl. ground fl. add 879 sf, with wet bar, 2 burner stove, no oven, (n) bath, relocate (e) laundry, water heater, demo brick chemney.Details
ground fl. addition and 2nd fl. renovation: 2nd fl. relocate (e) kitchen, (e) dining rm, demo fireplace, (n) stair to ground fl. ground fl. add 879 sf, with wet bar, 2 burner stove, no oven, (n) bath, relocate (e) laundry, water heater, demo brick chemney. | $100,000 |
| Jun 12, 2026 | In progress issued Jun 2026 | 345 Moncada Wy | Chl Construction Company | remodel kitchen and bathroom. new deck at rear. minor relocation of partitions, finishes, fixtures per plans. new split system hvac. replace 3 windows.Details
remodel kitchen and bathroom. new deck at rear. minor relocation of partitions, finishes, fixtures per plans. new split system hvac. replace 3 windows. | $175,000 |
| Jun 1, 2026 | In progress filed Jun 2026, not yet issued | 246 Guttenberg St | comply nov202417562. unit(s) will be added per planning code 207.2 adu at g/f. legalize staircase at rear. rear addition 119sf for adu at g/f. rear addition 107sf at 2/f.Details
comply nov202417562. unit(s) will be added per planning code 207.2 adu at g/f. legalize staircase at rear. rear addition 119sf for adu at g/f. rear addition 107sf at 2/f. | $100,000 | |
| May 18, 2026 | In progress filed May 2026, not yet issued | 1541 Irving St | convert existing ground floor storage to 3rd unit per planning code section 730. legalize ground floor addition.Details
convert existing ground floor storage to 3rd unit per planning code section 730. legalize ground floor addition. | $98,000 | |
| May 1, 2026 | In progress issued Jun 2026 | 460 42nd Av | Djy General Building | 2nd/f: kitchen & bath remodel. add 1 master bath & in fill lighwell (25 sf). 1st/f: convert storage into living space (972 sf): add 2 full baths, 2 bedrooms, 1 home office, 1 media rm. new radiant heat for full house, upgrade panel to 200 ampDetails
2nd/f: kitchen & bath remodel. add 1 master bath & in fill lighwell (25 sf). 1st/f: convert storage into living space (972 sf): add 2 full baths, 2 bedrooms, 1 home office, 1 media rm. new radiant heat for full house, upgrade panel to 200 amp | $273,427 |
| Apr 28, 2026 | In progress filed Apr 2026, not yet issued | 2700 Mission St | correct nov 202173787: complies w/ mandatory soft-story retrofit ordinance. seismic upgrade to basement and g/f. interior alterations per structural upgrades.Details
correct nov 202173787: complies w/ mandatory soft-story retrofit ordinance. seismic upgrade to basement and g/f. interior alterations per structural upgrades. | $250,000 | |
| Apr 27, 2026 | In progress filed Apr 2026, not yet issued | 3965 24th St | erect a type 5b, one-story detached adu in rear yard.Details
erect a type 5b, one-story detached adu in rear yard. | $149,600 | |
| Apr 16, 2026 | In progress filed Apr 2026, not yet issued | 542 34th Av | reconstruct retaining wall at rear property line between two lots. the address of the lots are 542 34th av. and 543 33rd av.Details
reconstruct retaining wall at rear property line between two lots. the address of the lots are 542 34th av. and 543 33rd av. | $25,000 | |
| Apr 15, 2026 | In progress filed Apr 2026, not yet issued | 366 Harvard St | revision to bpa 202512151813 - details for repairing post and beam.Details
revision to bpa 202512151813 - details for repairing post and beam. | $1,000 | |
| Apr 9, 2026 | In progress issued Apr 2026 | 1935 Webster St | Wei Li Construction | revision to pa# 202507030118: revise foundation and 1st floor framing to support (e) bay overhang, lower garage slab, perform minor roof framing upgrades, document the retaining wall along gridline a will remain as-is and not be replaced.Details
revision to pa# 202507030118: revise foundation and 1st floor framing to support (e) bay overhang, lower garage slab, perform minor roof framing upgrades, document the retaining wall along gridline a will remain as-is and not be replaced. | $18,000 |
| Mar 20, 2026 | In progress filed Mar 2026, not yet issued | 2307 09th Av | level 1 - garage conversion to primary bedrm with en-suite bathroom, closet and laundry; new sliding door and windows facing rear yard; level 2 - kitchen updated in place with removal of wall between kitchen and living room; new freestanding deck within buildable area and exterior stair access toDetails
level 1 - garage conversion to primary bedrm with en-suite bathroom, closet and laundry; new sliding door and windows facing rear yard; level 2 - kitchen updated in place with removal of wall between kitchen and living room; new freestanding deck within buildable area and exterior stair access to | $200,000 | |
| Feb 25, 2026 | In progress issued Feb 2026 | 2266 32nd Av | Home C Construction Inc | revision to pa #202507231418 to add new footing detail at location of existing share footing. detail 9/s4Details
revision to pa #202507231418 to add new footing detail at location of existing share footing. detail 9/s4 | |
| Feb 19, 2026 | In progress filed Feb 2026, not yet issued | 2700 Mission St | correct nov 202173787: complies w/ mandatory soft-story retrofit oridinance. seismic upgrade to basement and g/f. interior alterations per structural upgrades.Details
correct nov 202173787: complies w/ mandatory soft-story retrofit oridinance. seismic upgrade to basement and g/f. interior alterations per structural upgrades. | $250,000 | |
| Feb 17, 2026 | In progress filed Feb 2026, not yet issued | 315 Grand View Av | erect a type 5b, 2-story detached signle-family dwelling adu in rear yard per state adu program, planning code sect.207.2.Details
erect a type 5b, 2-story detached signle-family dwelling adu in rear yard per state adu program, planning code sect.207.2. | $220,000 | |
| Feb 12, 2026 | In progress issued Feb 2026 | 1256 30th Av | Ping Hong Liang | revision to pa# 202601053211 rear 1-story extension (size 7'6" x 9'6") & build a new deck w/ staircase (size 18'6" x 10'x 4'9")Details
revision to pa# 202601053211 rear 1-story extension (size 7'6" x 9'6") & build a new deck w/ staircase (size 18'6" x 10'x 4'9") | $45,000 |
| Jan 29, 2026 | In progress issued Feb 2026 | 1210 Stanyan St | Youda Builders Inc | revision to pa 202501067763 & 202510308521 revised structural drawing & detailsDetails
revision to pa 202501067763 & 202510308521 revised structural drawing & details | |
| Dec 30, 2025 | In progress filed Dec 2025, not yet issued | 623 09th Av | revision to pa #202311170998: revise a door opening location in the adu with minor structural revisions, window material to vinyl and landscaping in the rear yard. all other scopes to remain unchanged.Details
revision to pa #202311170998: revise a door opening location in the adu with minor structural revisions, window material to vinyl and landscaping in the rear yard. all other scopes to remain unchanged. | ||
| Dec 29, 2025 | Completed final sign-off Mar 2026 | 1700 19th Av | Synerforce Construction | revision to 202106041737 to omit new door at storage room. relocated laundry to e utility room.Details
revision to 202106041737 to omit new door at storage room. relocated laundry to e utility room. | |
| Dec 15, 2025 | In progress filed Dec 2025, not yet issued | 3660 16th St | no work oiin ground fl and 3rd fl. ovv2nd fl : 3662 16th st: construct firewall approx 9'8 above gradeDetails
no work oiin ground fl and 3rd fl. ovv2nd fl : 3662 16th st: construct firewall approx 9'8 above grade | $2,000 | |
| Dec 9, 2025 | In progress issued Dec 2025 | 1927 33rd Av | Q & Qq Construction Inc | revision of (e) rear foundation on approval pa#: 202507171068Details
revision of (e) rear foundation on approval pa#: 202507171068 | $25,000 |
| Dec 1, 2025 | Completed final sign-off Jul 2026 | 735 22nd Av | Cht Properties Development | 2/f: remodel kitchen and bath with reconfiguration. remove wall (interior) b/w kitchen and dining room. replace bathroom window with new opening. 3/f: remodel bath with reconfiguration and add half bath.Details
2/f: remodel kitchen and bath with reconfiguration. remove wall (interior) b/w kitchen and dining room. replace bathroom window with new opening. 3/f: remodel bath with reconfiguration and add half bath. | $35,000 |
| Nov 13, 2025 | Completed final sign-off Nov 2025 | 563 44th Av | revision to pa # 202308154503: reflect as built layout entailing relocation of 1 new 2nd fl bathroom, maintaining (e) ground fl media room.Details
revision to pa # 202308154503: reflect as built layout entailing relocation of 1 new 2nd fl bathroom, maintaining (e) ground fl media room. | ||
| Oct 30, 2025 | In progress issued Nov 2025 | 1210 Stanyan St | Youda Builders Inc | revision to 202501067763. enlarge the garage door, relocate both unit entrances. install rear yard access. install windows in unit 1210 b. reconfigure interior stair. reconfig bedrm bath lyout at front of house. skylight at stairwell,all windows to viny, replace e cement siding w wood stucco throughDetails
revision to 202501067763. enlarge the garage door, relocate both unit entrances. install rear yard access. install windows in unit 1210 b. reconfigure interior stair. reconfig bedrm bath lyout at front of house. skylight at stairwell,all windows to viny, replace e cement siding w wood stucco through | $50,000 |
| Oct 8, 2025 | In progress issued Dec 2025 | 2018 22nd Av | Alex Construction & Electric Inc | horizontal rear addition. add 2 bedrooms, 4 baths, home office, media, exercise room & infill front stairs.Details
horizontal rear addition. add 2 bedrooms, 4 baths, home office, media, exercise room & infill front stairs. | $350,000 |
| Jul 28, 2025 | Completed final sign-off Apr 2026 | 3036 22nd Av | S L Y Construction Company | remodel (e) kitchen, bathroom. add 1 new full bathroom & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 2 full bath. remodel (e) family room & install wetbar at g/f.Details
remodel (e) kitchen, bathroom. add 1 new full bathroom & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 2 full bath. remodel (e) family room & install wetbar at g/f. | $488,000 |
| Jul 17, 2025 | In progress issued Oct 2025 | 1927 33rd Av | Q & Qq Construction Inc | interior remodel & rear horizontal addition. and interior remodelDetails
interior remodel & rear horizontal addition. and interior remodel | $300,000 |
| Jul 10, 2025 | In progress issued Dec 2025 | 1935 Webster St | Wei Li Construction | rear horizontal additions at lvls 1 and 2. interior remodel @ lvls 1, 2 & 3 to include reconfiguring of the floor plan layouts at all levels. (n) rear roof deck at lvl 2. new windows and siding at rear, & replacement of (e) window sashes at front and side facades.Details
rear horizontal additions at lvls 1 and 2. interior remodel @ lvls 1, 2 & 3 to include reconfiguring of the floor plan layouts at all levels. (n) rear roof deck at lvl 2. new windows and siding at rear, & replacement of (e) window sashes at front and side facades. | $750,000 |
| Jun 3, 2025 | In progress issued Dec 2025 | 190 21st Av | Winder Construction Inc. | remodel 8 units for additonal bedrooms and in unit laundry. remodel kitchen and bath fixtures and finishes. replace furance and ducting. add exterior windows. see apps 202504033633, 3634, 3635. comply with nov 201991371Details
remodel 8 units for additonal bedrooms and in unit laundry. remodel kitchen and bath fixtures and finishes. replace furance and ducting. add exterior windows. see apps 202504033633, 3634, 3635. comply with nov 201991371 | $100,000 |
| May 19, 2025 | Completed final sign-off Jun 2026 | 1465 23rd Av | Blue Wood Construction Inc. | remodel (e) kitchen, add 1 new full bathroom & replace (e) sheetrock w. new at 2/f. construct 2 bedroom, 2 bathroom, family room & install wetbar at g/f including in-fill 1 bedroom. in-fill (e) light-well.Details
remodel (e) kitchen, add 1 new full bathroom & replace (e) sheetrock w. new at 2/f. construct 2 bedroom, 2 bathroom, family room & install wetbar at g/f including in-fill 1 bedroom. in-fill (e) light-well. | $439,900 |
| Apr 25, 2025 | Completed final sign-off Dec 2025 | 41 Wilder St | Chl Construction Company | 1/f: interior remodel. convert 263 sq.ft to conditioned space. (1) new bathroom. relocate fixtures, partitions per plans. 2/f: remodel 1 (e) bath. new deck with stair. relocate interior stair.Details
1/f: interior remodel. convert 263 sq.ft to conditioned space. (1) new bathroom. relocate fixtures, partitions per plans. 2/f: remodel 1 (e) bath. new deck with stair. relocate interior stair. | $300,000 |
| Apr 22, 2025 | Completed final sign-off Jan 2026 | 1921 Taraval St | On Tung Inc | unit 4: convert (e) storage room, laundry room to bedroom. add 1 new bathroom & convert (e) powder room to full bathroom. install 2 wetbar. all work at g/f. (space for unit 4)Details
unit 4: convert (e) storage room, laundry room to bedroom. add 1 new bathroom & convert (e) powder room to full bathroom. install 2 wetbar. all work at g/f. (space for unit 4) | $110,000 |
| Apr 17, 2025 | In progress issued Dec 2025 | 190 21st Av | Winder Construction Inc. | soft-story retrofit of g/f to comply with nov #201991371. see separate permit to add 3 adu at ground floor under pa# 202504033634.Details
soft-story retrofit of g/f to comply with nov #201991371. see separate permit to add 3 adu at ground floor under pa# 202504033634. | $100,000 |
| Apr 17, 2025 | In progress issued Dec 2025 | 190 21st Av | Winder Construction Inc. | legalize udu on 2nd floor as unit #1a. see separate permits: add 3 adu in ground floor under pa# 202504033634 with soft story retrofit under pa# 202504033633.Details
legalize udu on 2nd floor as unit #1a. see separate permits: add 3 adu in ground floor under pa# 202504033634 with soft story retrofit under pa# 202504033633. | $150,000 |
| Apr 17, 2025 | In progress issued Dec 2025 | 190 21st Av | Winder Construction Inc. | add 3 adu on g/f per ord 162-16 & planning code 207c4. remove 4 garages. add unit entries with new doors & windows. see separate permit for soft story retrofit on ground floor under pa# 202504033633 to comply with complaint# 201991371.Details
add 3 adu on g/f per ord 162-16 & planning code 207c4. remove 4 garages. add unit entries with new doors & windows. see separate permit for soft story retrofit on ground floor under pa# 202504033633 to comply with complaint# 201991371. | $150,000 |
| Apr 2, 2025 | Completed final sign-off Dec 2025 | 567 London St | revision to pa #202409241478 structural. foundation to address actual existing conditions found during constructtion.Details
revision to pa #202409241478 structural. foundation to address actual existing conditions found during constructtion. | ||
| Mar 31, 2025 | Completed final sign-off Mar 2026 | 2479 31st Av | Bjy Construction Inc | relocate (e) kitchen, remodel (e) bathroom, add new bath & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 2 bathroom, family room, & install wet bar at g/f (including 1 bedroom in-fill). repair (e) deck & replace handrail at rear of building. new interior stairs, structural work.Details
relocate (e) kitchen, remodel (e) bathroom, add new bath & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 2 bathroom, family room, & install wet bar at g/f (including 1 bedroom in-fill). repair (e) deck & replace handrail at rear of building. new interior stairs, structural work. | $290,000 |
| Feb 12, 2025 | In progress filed Feb 2025, not yet issued | 3660 16th St | g/f #3660: construct 2 new bath, renovate e bath. demo partition wall to add new bedroom. relocate water heater/range. demo stair that connects g/f to 3/f. 2nd fl #3662: construct new bath 2, renovate e bath,renovate e kitchen.Details
g/f #3660: construct 2 new bath, renovate e bath. demo partition wall to add new bedroom. relocate water heater/range. demo stair that connects g/f to 3/f. 2nd fl #3662: construct new bath 2, renovate e bath,renovate e kitchen. | $10,000 | |
| Feb 3, 2025 | Completed final sign-off Aug 2025 | 876 Chenery St | Buildcorp Inc | 1f: addition of header beam at the ceiling. 2f: interior remodeling of master bathroom approx 56 sq ft, kitchen 160 sq ft. remodel electric fireplace at living room area. removal of partition wall at living room approx 16 linear ft long & addition of hss steel beamDetails
1f: addition of header beam at the ceiling. 2f: interior remodeling of master bathroom approx 56 sq ft, kitchen 160 sq ft. remodel electric fireplace at living room area. removal of partition wall at living room approx 16 linear ft long & addition of hss steel beam | $50,000 |
| Jan 27, 2025 | In progress issued Jan 2025 | 2659 37th Av | existing foundation repair/replace in kindDetails
existing foundation repair/replace in kind | $20,000 | |
| Jan 27, 2025 | In progress issued Jan 2025 | 2651 37th Av | existing south wall foundation repair/replace in kindDetails
existing south wall foundation repair/replace in kind | $20,000 | |
| Jan 23, 2025 | Completed final sign-off Jul 2026 | 3020 25th St | Environs Design Build | 1/f: excavate to 8' ceiling and infill overhang at side, below (e) conditioned space, and modify the space to new habitable floor space. 2/f: remodel (e) habitable space, infill east lightwell, new skylights, and replace all (e) windows.Details
1/f: excavate to 8' ceiling and infill overhang at side, below (e) conditioned space, and modify the space to new habitable floor space. 2/f: remodel (e) habitable space, infill east lightwell, new skylights, and replace all (e) windows. | $295,000 |
| Jan 16, 2025 | In progress issued May 2025 | 1210 Stanyan St | Youda Builders Inc | comply to planning nov #2022-006478enf: restore-reconfigure interior layout to 2 dwelling units. replace rear stairwell enclosure & exterior stairs due to pest infestation. convert partial space on 1/f into habitable space for unit b.Details
comply to planning nov #2022-006478enf: restore-reconfigure interior layout to 2 dwelling units. replace rear stairwell enclosure & exterior stairs due to pest infestation. convert partial space on 1/f into habitable space for unit b. | $200,000 |
| Nov 19, 2024 | In progress issued Dec 2024 | 19 Pope St | revision to pa 202305157789 202405081699 and 202406134131 structural work on 2nd fl.level out yard space 8'x26'with max retaining wall height 3 ft.Details
revision to pa 202305157789 202405081699 and 202406134131 structural work on 2nd fl.level out yard space 8'x26'with max retaining wall height 3 ft. | $50,000 | |
| Aug 19, 2024 | Completed final sign-off Feb 2025 | 1641 Chestnut St | C K Construction | revision to pa # 202406215042: re-configuration of layout at g/f.Details
revision to pa # 202406215042: re-configuration of layout at g/f. | |
| Jul 10, 2024 | Completed final sign-off Feb 2025 | 1455 Sacramento St | Peter Liu Construction Inc | revision to soft story pa # 202312061997 & 202404180302 in accordance with meeting w/ sfdbi on 5/30/2024.Details
revision to soft story pa # 202312061997 & 202404180302 in accordance with meeting w/ sfdbi on 5/30/2024. | |
| Jul 1, 2024 | Completed final sign-off Nov 2024 | 80 San Pablo Av | K A Lau Construction | remove partial (e) wall. install 2 new steel beams. revision to pa#202404190326.Details
remove partial (e) wall. install 2 new steel beams. revision to pa#202404190326. | $30,000 |
| May 31, 2024 | Completed final sign-off Jun 2024 | 2478 27th Av | Evergreen Construction Company | revision to pa# 202312061998: no concrete required under the permit# 202312061998 as concrete strength 3000 psi incorrectly listed on the plan. concrete strength should be under 2500 psi, ref to building code sec 1705.3, exception 2.2.3 as concrete testing not required.Details
revision to pa# 202312061998: no concrete required under the permit# 202312061998 as concrete strength 3000 psi incorrectly listed on the plan. concrete strength should be under 2500 psi, ref to building code sec 1705.3, exception 2.2.3 as concrete testing not required. | |
| May 28, 2024 | Expired or cancelled suspend Dec 2024 | 2229 Webster St | Environs Design Build | 1st fl: excavate to 8'-0" ceiling height. add new living space 799 sq ft. new laundry room replace existing brick foundation in kind. 2nd & 3rd fl full remodel per plans 2nd fl: (n) kitchen, powder room & family room. (n) interior stairs 3rd fl: add (n) bathrooms, skylights and hallwayDetails
1st fl: excavate to 8'-0" ceiling height. add new living space 799 sq ft. new laundry room replace existing brick foundation in kind. 2nd & 3rd fl full remodel per plans 2nd fl: (n) kitchen, powder room & family room. (n) interior stairs 3rd fl: add (n) bathrooms, skylights and hallway | $486,400 |
| May 22, 2024 | Expired or cancelled withdrawn Oct 2024 | 1700 19th Av | Synerforce Construction | 09/19/2024 withdrawal approved by david jones 09/26/2024 ces violation pending approval sent to joe cheng for approval s.c revision to pa# 202305157754 to comply with nov 201992411 relocate shearwallDetails
09/19/2024 withdrawal approved by david jones 09/26/2024 ces violation pending approval sent to joe cheng for approval s.c revision to pa# 202305157754 to comply with nov 201992411 relocate shearwall | |
| May 13, 2024 | In progress issued Nov 2024 | 718 07th Av | Ywum Ent Inc | 2nd fl: remodel (e) kitchen & bathroom on 2nd fl. add one full bathroom. infill lightwell at north wall & replace (e) sheetrock w/ new ground fl: construct one (n) bedroom, one (n) full bathroom, one (n) powder room & family room. one (n) wetbar. construct new deck at the rear (appox size 18x6)Details
2nd fl: remodel (e) kitchen & bathroom on 2nd fl. add one full bathroom. infill lightwell at north wall & replace (e) sheetrock w/ new ground fl: construct one (n) bedroom, one (n) full bathroom, one (n) powder room & family room. one (n) wetbar. construct new deck at the rear (appox size 18x6) | $286,000 |
| May 1, 2024 | Completed final sign-off Apr 2026 | 2183 Mission St | Chaus Construction, Sky River Builder Inc | comply with nov# 202419591. remove all un permitted work under withdrawn pa# 202308295518. reduce scope of work to construct 2x4 partition wall. 8'-0". height w/ 3'-0" door. all work ground flDetails
comply with nov# 202419591. remove all un permitted work under withdrawn pa# 202308295518. reduce scope of work to construct 2x4 partition wall. 8'-0". height w/ 3'-0" door. all work ground fl | $45,000 |
| Apr 8, 2024 | Completed final sign-off May 2025 | 2307 35th Av | Hong's General Construction Inc | revision to pa # 202311291568 for minor wall layout change on g/f.Details
revision to pa # 202311291568 for minor wall layout change on g/f. | |
| Mar 27, 2024 | Completed final sign-off Oct 2024 | 137 11th Av | Environs Design Build | revision to pa# 202312212964 and complaint# 202420814: replace (e) 2nd floor rear roof due to dryrot and align south roof with north roof in height per plan. raised roofDetails
revision to pa# 202312212964 and complaint# 202420814: replace (e) 2nd floor rear roof due to dryrot and align south roof with north roof in height per plan. raised roof | $5,000 |
| Mar 15, 2024 | Completed final sign-off Jul 2024 | 380 Christopher Dr | Chl Construction Company | revision to pa # 202307071659: structural revision due to (e) condition repair exterior stairs on side of houseDetails
revision to pa # 202307071659: structural revision due to (e) condition repair exterior stairs on side of house | $5,000 |
| Feb 29, 2024 | Completed final sign-off Mar 2024 | 3100 Taraval St | Synerforce Construction | revision to pa# 202206035535: to document new shearwall location.Details
revision to pa# 202206035535: to document new shearwall location. | |
| Feb 20, 2024 | Completed final sign-off May 2025 | 2614 Sacramento St | K A Lau Construction | new structural framing alterations for minor wall. plan changes voluntary seismic retrofit of all stories per sfdbi ab-94 and 2022 cebc. (setback 20'-0" ft from property line) reference pa# 2023.1107.0315Details
new structural framing alterations for minor wall. plan changes voluntary seismic retrofit of all stories per sfdbi ab-94 and 2022 cebc. (setback 20'-0" ft from property line) reference pa# 2023.1107.0315 | $68,000 |
| Jan 23, 2024 | Completed final sign-off Oct 2024 | 639 25th Av | Velic Construction Inc | revision ref 202310108365. replace garage slab in kind (n) foundation at rearDetails
revision ref 202310108365. replace garage slab in kind (n) foundation at rear | $30,000 |
| Nov 30, 2023 | Expired or cancelled withdrawn Jul 2024 | 448 15th Av | construct (n) family rm, (n)bath rm,(n)staircase at gnd flr. relocate kitchen, construct (n)bath rm,(n)family rm at 2nd flr. construct (n)bath rm, remodel bedrm at 3rd flr. (n)electrical throughout.Details
construct (n) family rm, (n)bath rm,(n)staircase at gnd flr. relocate kitchen, construct (n)bath rm,(n)family rm at 2nd flr. construct (n)bath rm, remodel bedrm at 3rd flr. (n)electrical throughout. | $250,000 | |
| Nov 3, 2023 | Completed final sign-off Apr 2024 | 1838 Irving St | Yes General Construction Builder Llc | revision to 202306099689 and 201912311119, voluntary installation of (n) footings at property frontageDetails
revision to 202306099689 and 201912311119, voluntary installation of (n) footings at property frontage | $15,000 |
| Oct 30, 2023 | In progress issued Sep 2024 | 201 Christopher Dr | F C Company | interior layout change on the 1/f and 2/f, upstairs changes include kitchen remodel and removal of wall and installing skylights, downstairs remodel will include bedroom, bathroom, walk-in closet, entry way, laundry area and bonus area, the central heating system and water heater will be replaceDetails
interior layout change on the 1/f and 2/f, upstairs changes include kitchen remodel and removal of wall and installing skylights, downstairs remodel will include bedroom, bathroom, walk-in closet, entry way, laundry area and bonus area, the central heating system and water heater will be replace | $100,000 |
| Oct 26, 2023 | Completed final sign-off Nov 2023 | 1520 Alabama St | Environs Design Build | revision to pa# 202304125589. minor structural change. new psl @ centerline of the proposed 2nd fl framing frameDetails
revision to pa# 202304125589. minor structural change. new psl @ centerline of the proposed 2nd fl framing frame | $1,000 |
| Oct 18, 2023 | Completed final sign-off Apr 2025 | 74 Lakewood Av | Andrew Mak Dba Am Construction | revision under pa# 202305117536: remove re-built concrete retaining wall at north and east property line.Details
revision under pa# 202305117536: remove re-built concrete retaining wall at north and east property line. | $20,000 |
| Oct 10, 2023 | Completed final sign-off Nov 2024 | 639 25th Av | Velic Construction Inc, Great Ocean Construction Inc. | remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f.Details
remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f. | $100,000 |
| Sep 25, 2023 | Completed final sign-off Aug 2024 | 1285 27th Av | revision to 202009093775. interior wall relocation and door add between garage and the adu. rear yard change per plan.Details
revision to 202009093775. interior wall relocation and door add between garage and the adu. rear yard change per plan. | $2,000 | |
| Aug 22, 2023 | Completed final sign-off Mar 2025 | 832 Clayton St | P 3 Construction & Remodeling Inc | partial conversion of (e) basement/garage/laundry into new family rm & laundryDetails
partial conversion of (e) basement/garage/laundry into new family rm & laundry | $28,000 |
| Aug 21, 2023 | Completed final sign-off Jul 2024 | 566 46th Av | Electric Current Construction Inc. | revision to permit 202301200493. relocate the skylight at stair way to the kitchen 5' from property line. install new windows at 2nd level to meet the emergency rescue and escape openning requirement.Details
revision to permit 202301200493. relocate the skylight at stair way to the kitchen 5' from property line. install new windows at 2nd level to meet the emergency rescue and escape openning requirement. | $3,000 |
| Aug 15, 2023 | Completed final sign-off Nov 2025 | 563 44th Av | O Donoghue Construction Inc. | relocate 2 (e) bathroom, convert (e) media room to bedroom & install kitchenette at g/f. remodel (e) kitchen, bathroom. construct 1 bathroom & replace sheetrock w/ new at 2/f.Details
relocate 2 (e) bathroom, convert (e) media room to bedroom & install kitchenette at g/f. remodel (e) kitchen, bathroom. construct 1 bathroom & replace sheetrock w/ new at 2/f. | $362,000 |
| Aug 14, 2023 | Completed final sign-off Jan 2024 | 624 Fillmore St | Deep Elm Construction Llc | unit 3: revision to permit 202211216941. unforeseen field condition required modification to roof framing. add plywood sheathing to property line wallDetails
unit 3: revision to permit 202211216941. unforeseen field condition required modification to roof framing. add plywood sheathing to property line wall | |
| Jun 15, 2023 | Completed final sign-off Dec 2023 | 3344 25th St | revision to pa# 202105120271. repair and replace concrete footing.Details
revision to pa# 202105120271. repair and replace concrete footing. | ||
| Jun 6, 2023 | Completed final sign-off Nov 2023 | 1520 Alabama St | Environs Design Build | revision to bpa#202304125589, replace (e) foundation w/new. repair existing exterior wall. to comply with bid nov#202309029 dated 6/2/2023Details
revision to bpa#202304125589, replace (e) foundation w/new. repair existing exterior wall. to comply with bid nov#202309029 dated 6/2/2023 | $6,000 |
| May 15, 2023 | Completed final sign-off Nov 2024 | 1700 19th Av | Synerforce Construction | soft story retrofit per sfebc chapter 4 engineering criteria 2022 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4 engineering criteria 2022 cebc appendix a-4 | $50,000 |
| Apr 12, 2023 | Completed final sign-off Nov 2023 | 1520 Alabama St | Environs Design Build | gr fl replace e windows in kind. turn partial e garage to liveable area 912 sf. new kitchen, living rm, dining rm, stair and half bath. 2nd fl infill lightwell 34 sf, relocate e kitchen, liv rm, din rm to 1st fl. remodel e hal bath to full bath. new bedroom suites, new master bedroom suiteDetails
gr fl replace e windows in kind. turn partial e garage to liveable area 912 sf. new kitchen, living rm, dining rm, stair and half bath. 2nd fl infill lightwell 34 sf, relocate e kitchen, liv rm, din rm to 1st fl. remodel e hal bath to full bath. new bedroom suites, new master bedroom suite | $280,000 |
| Mar 30, 2023 | Completed final sign-off Nov 2023 | 105 Gladeview Wy | P 3 Construction & Remodeling Inc | revision to pa#: 202303033003, open wall between dining room and kitchenDetails
revision to pa#: 202303033003, open wall between dining room and kitchen | $25,000 |
| Mar 29, 2023 | Completed final sign-off Aug 2024 | 154 Funston Av | Concept Design And Build | remodel kitchen, construct (n) bathroom, remodel (e) bathroom, construct (n) bedroom, remove walls between living room & (n) kitchen at 154 funston 3/f. remodel kitchen, construct (n) bathroom, remodel (e) bathroom, remove walls between living room, (n) kitchen & dining room. (n) staircase connectinDetails
remodel kitchen, construct (n) bathroom, remodel (e) bathroom, construct (n) bedroom, remove walls between living room & (n) kitchen at 154 funston 3/f. remodel kitchen, construct (n) bathroom, remodel (e) bathroom, remove walls between living room, (n) kitchen & dining room. (n) staircase connectin | $250,000 |
| Mar 6, 2023 | Completed final sign-off Oct 2023 | 66 Elsie St | revision to pa 2022-0714-8502 & 2022-0908-2069 modify framing plan & details. revise wood beam on 3rd fl to steel. call for site verification inspection upon issuance of permitDetails
revision to pa 2022-0714-8502 & 2022-0908-2069 modify framing plan & details. revise wood beam on 3rd fl to steel. call for site verification inspection upon issuance of permit | ||
| Feb 27, 2023 | Never finaled filed Feb 2023, never issued | 323 Divisadero St | new meditation center renovation in existing tenant space on 1st and 2nd floor including accessibility upgrading of primary entrance and toilet on the 1st floor and constructing two exterior rear stairs.Details
new meditation center renovation in existing tenant space on 1st and 2nd floor including accessibility upgrading of primary entrance and toilet on the 1st floor and constructing two exterior rear stairs. | $197,000 | |
| Jan 20, 2023 | Completed final sign-off Jul 2024 | 566 46th Av | Electric Current Construction Inc. | comply with violation # 202294498. legalize a storage shed rear yard. 2) ground floor: interior remodel add (2) bedrooms, (2) bathrooms, (1) stack w/d and (1) laundry sink. 3) 2nd level: kitchen remodel, add (1) bedroom, (1) bathroom, laundry room and (1) skylight.Details
comply with violation # 202294498. legalize a storage shed rear yard. 2) ground floor: interior remodel add (2) bedrooms, (2) bathrooms, (1) stack w/d and (1) laundry sink. 3) 2nd level: kitchen remodel, add (1) bedroom, (1) bathroom, laundry room and (1) skylight. | $210,000 |
| Jan 9, 2023 | Completed final sign-off Sep 2023 | 2774 San Bruno Av | Youda Builders Inc | revision to bpa#202209293415, replace exterior foundationDetails
revision to bpa#202209293415, replace exterior foundation | $30,000 |
| Dec 30, 2022 | Completed final sign-off Apr 2024 | 1839 17th Av | Yao Hui Liang | construct 2 bedroom, 2 bathroom, & media room at g/f. relocate (e) kitchen, bathroom, add 2 bathroom, in-fill central patio & replace (e) sheet rock w/ new at 2/f. construct rear deck w/ staircase (18'x8').Details
construct 2 bedroom, 2 bathroom, & media room at g/f. relocate (e) kitchen, bathroom, add 2 bathroom, in-fill central patio & replace (e) sheet rock w/ new at 2/f. construct rear deck w/ staircase (18'x8'). | $274,000 |
| Dec 20, 2022 | Completed final sign-off Apr 2023 | 2340 34th Av | F Liu Construction | revision to pa 2022-0602-5480, ground fl - added half bath & wetbar; 2nd fl - added solar tubes in bathrooms & stair, stair location revision; deck - shorten deckDetails
revision to pa 2022-0602-5480, ground fl - added half bath & wetbar; 2nd fl - added solar tubes in bathrooms & stair, stair location revision; deck - shorten deck | $3,000 |
| Nov 30, 2022 | Never finaled issued Feb 2023, no final | 701 08th St | E.A.Davidovits &Co.,Inc. | mercantile tenant improvement for ground floor space in a newly constructed existing shell building includes open showeroom space, smaller display spaces, employee offices, office support areas, and restrooms.Details
mercantile tenant improvement for ground floor space in a newly constructed existing shell building includes open showeroom space, smaller display spaces, employee offices, office support areas, and restrooms. | $1,200,000 |
| Nov 29, 2022 | Never finaled issued Dec 2022, no final | 3830 Divisadero St | Jian Lou Construction Co. | unit 102 on 2/f: interior remodel. remodel kitchen and bath. add bath, den, laundry closet.Details
unit 102 on 2/f: interior remodel. remodel kitchen and bath. add bath, den, laundry closet. | $92,000 |
| Nov 21, 2022 | Completed final sign-off Jan 2024 | 624 Fillmore St | Martin Paul Duggan Contracting | interior remodel kitchen and bathDetails
interior remodel kitchen and bath | $20,000 |
| Nov 10, 2022 | In progress issued May 2025 | 2200 Keith St | L & D Devlopment.Inc. | tenant improvement to (e) office/warehouse by building a 2nd level to the open warehouse area, w/ new stair going to the new 2nd fl office/storage area. maintain 15ft from 1st fl finish level to ceiling as required. no exterior work. all foundation/functional work only pertaining to the interior.Details
tenant improvement to (e) office/warehouse by building a 2nd level to the open warehouse area, w/ new stair going to the new 2nd fl office/storage area. maintain 15ft from 1st fl finish level to ceiling as required. no exterior work. all foundation/functional work only pertaining to the interior. | $500,000 |
| Nov 8, 2022 | Completed final sign-off May 2024 | 83 Arbor St | J C Tan Builders | construct (n) cantilevered balcony at rear of building 2/f. construct (n) deck w/ staircase at rear of building at basement (size approx. 22'x8'x6').Details
construct (n) cantilevered balcony at rear of building 2/f. construct (n) deck w/ staircase at rear of building at basement (size approx. 22'x8'x6'). | $28,000 |
| Nov 3, 2022 | Never finaled issued Nov 2022, no final | 168 Lake Merced Hill St South St | Golden One Construction Inc | revision of permit 202012030149, add a two burner cooktop and a sink.Details
revision of permit 202012030149, add a two burner cooktop and a sink. | $1,000 |
| Oct 24, 2022 | Completed final sign-off Oct 2023 | 150 21st Av | Alex Construction & Electric Inc | rear cottage downstairs: remodel (e) kitchen, bathroom, bedroom & living room. construct (n) batroom and bedroom. replace (e) foundation. no work on 2nd floor of rear cottage. no work at front 3-story bldg.Details
rear cottage downstairs: remodel (e) kitchen, bathroom, bedroom & living room. construct (n) batroom and bedroom. replace (e) foundation. no work on 2nd floor of rear cottage. no work at front 3-story bldg. | $80,000 |
| Oct 11, 2022 | Completed final sign-off May 2024 | 83 Arbor St | J C Tan Builders, Promax Builders Inc Dba Procraft Builder | convert (e) bedroom, study room into 1 bedroom, relocate (e) bathroom at g/f. remodel (e) kitchen, bathroom & replace (e) sheet rock with new at 2/f. construct 1 bedroom, family room with wet bar and 1 full bathroom at basement.Details
convert (e) bedroom, study room into 1 bedroom, relocate (e) bathroom at g/f. remodel (e) kitchen, bathroom & replace (e) sheet rock with new at 2/f. construct 1 bedroom, family room with wet bar and 1 full bathroom at basement. | $200,000 |
| Sep 6, 2022 | Completed final sign-off Apr 2026 | 1408 Shafter Av | B W H Builder Inc. | to comply with dbi nov# 201883174, 201887331, 202177722, 202178670, 202178669, and planning complaint # 2021-005087enf. add one g/f and one 2/f unit per planning code sec. 207(c)(8). legaliza 2/f rear addition. verify 1-hr ceiling between floors, between units & 1-hr walls next to garage.Details
to comply with dbi nov# 201883174, 201887331, 202177722, 202178670, 202178669, and planning complaint # 2021-005087enf. add one g/f and one 2/f unit per planning code sec. 207(c)(8). legaliza 2/f rear addition. verify 1-hr ceiling between floors, between units & 1-hr walls next to garage. | $30,000 |