Buildcorp Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2023 to Nov 2025
- Last 24 months
- 3 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2025 | Completed final sign-off Jan 2026 | 1200 Girard St | comply with nov 202544722. reduce as built rear yard fence height to 10" max. height above grade.Details
comply with nov 202544722. reduce as built rear yard fence height to 10" max. height above grade. | $20,000 |
| Feb 3, 2025 | Completed final sign-off Aug 2025 | 876 Chenery St | 1f: addition of header beam at the ceiling. 2f: interior remodeling of master bathroom approx 56 sq ft, kitchen 160 sq ft. remodel electric fireplace at living room area. removal of partition wall at living room approx 16 linear ft long & addition of hss steel beamDetails
1f: addition of header beam at the ceiling. 2f: interior remodeling of master bathroom approx 56 sq ft, kitchen 160 sq ft. remodel electric fireplace at living room area. removal of partition wall at living room approx 16 linear ft long & addition of hss steel beam | $50,000 |
| Oct 31, 2024 | Completed final sign-off Aug 2025 | 876 Chenery St | the addition of a new family room with floor area of approximately 333 sqft.Details
the addition of a new family room with floor area of approximately 333 sqft. | $5,000 |
| Jun 5, 2024 | Completed final sign-off Nov 2025 | 715 Mount Vernon Av | ground fl. remodel to have 2 bedrooms, 1 full bathrooms, family room and kitchenette. 2nd fl. remodel master bedroom, master bathroom and kitchen, add exterior stairs 2 skylights for attic.Details
ground fl. remodel to have 2 bedrooms, 1 full bathrooms, family room and kitchenette. 2nd fl. remodel master bedroom, master bathroom and kitchen, add exterior stairs 2 skylights for attic. | $205,000 |
| Apr 13, 2023 | Completed final sign-off Apr 2024 | 666 Monterey Bl | excavate to create storage area at the ground/first floor install new partitions to create power room and storage area-unconditional area. relocate washer, dryer, furnace and water boiler.Details
excavate to create storage area at the ground/first floor install new partitions to create power room and storage area-unconditional area. relocate washer, dryer, furnace and water boiler. | $60,000 |