Peter Liu Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Dec 2025
- Last 24 months
- 5 permits filed
71 permits since 2000: 57 completed, 1 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2025 | Completed final sign-off Aug 2026 | 1455 Sacramento St | unit #2: remodel (e) kitchen, bathroom. add 1 new bathroom. convert (e) living room to a (n) bedroom.Details
unit #2: remodel (e) kitchen, bathroom. add 1 new bathroom. convert (e) living room to a (n) bedroom. | $75,000 |
| Nov 12, 2025 | Completed final sign-off Jun 2026 | 2142 20th Av | remodel (e) kitchen, convert 1 (e) bathroom to 2 full bathroom and install 1 2x2 skylight. all work on 2/f.Details
remodel (e) kitchen, convert 1 (e) bathroom to 2 full bathroom and install 1 2x2 skylight. all work on 2/f. | $96,500 |
| Oct 6, 2025 | Completed final sign-off Dec 2025 | 1614 24th Av | construct scaffold, repair stucco for both sides of the stairway and both sides of the garage like for like. rent temporary toilet, paint exterior.Details
construct scaffold, repair stucco for both sides of the stairway and both sides of the garage like for like. rent temporary toilet, paint exterior. | $10,000 |
| Aug 12, 2025 | Completed final sign-off Nov 2025 | 125 Ewing Tr | construct scaffold, rent tempporary toilet, and allow to park on sidewalk in neccessary, repair stucco, exterior paint, patch living room, paint living room. street visible stucco repair.Details
construct scaffold, rent tempporary toilet, and allow to park on sidewalk in neccessary, repair stucco, exterior paint, patch living room, paint living room. street visible stucco repair. | $10,000 |
| Dec 18, 2024 | Completed final sign-off Feb 2025 | 1455 Sacramento St | revision to 202312061997: there was a drafting error where we switched the sink & stove location. we would like to maintain the original fixture location as shown in revision at ground floor unitDetails
revision to 202312061997: there was a drafting error where we switched the sink & stove location. we would like to maintain the original fixture location as shown in revision at ground floor unit | |
| Oct 3, 2024 | Completed final sign-off Oct 2025 | 359 Munich St | construct 2 bedroom, 2 bathroom, media room & install wetbar at g/f. re-arrange bedroom, kitchen, bathroom. construct 1 new bathroom & re-built interior staircase at 2/f. construct new 3'height concrete retaining wall at rear yard.Details
construct 2 bedroom, 2 bathroom, media room & install wetbar at g/f. re-arrange bedroom, kitchen, bathroom. construct 1 new bathroom & re-built interior staircase at 2/f. construct new 3'height concrete retaining wall at rear yard. | $368,000 |
| Jul 22, 2024 | Completed final sign-off Dec 2024 | 150 11th Av | revision to pa #202310249374: remove (e) interior staircase, replace w/ steel spiral stair down to g/f. sheet rock whole garage level.Details
revision to pa #202310249374: remove (e) interior staircase, replace w/ steel spiral stair down to g/f. sheet rock whole garage level. | $18,000 |
| Jul 10, 2024 | Completed final sign-off Feb 2025 | 1455 Sacramento St | revision to soft story pa # 202312061997 & 202404180302 in accordance with meeting w/ sfdbi on 5/30/2024.Details
revision to soft story pa # 202312061997 & 202404180302 in accordance with meeting w/ sfdbi on 5/30/2024. | |
| Apr 18, 2024 | Completed final sign-off Feb 2025 | 1455 Sacramento St | revision to soft story retrofit permit # 202312061997 to accomodate field identified conditions.(foundation)Details
revision to soft story retrofit permit # 202312061997 to accomodate field identified conditions.(foundation) | $10,000 |
| Feb 22, 2024 | Completed final sign-off Aug 2024 | 150 11th Av | replace wood windows on 2nd and 3rd floors with in-kind wood windows, front facing. max u-factor=0.30. same size and same locationDetails
replace wood windows on 2nd and 3rd floors with in-kind wood windows, front facing. max u-factor=0.30. same size and same location | $9,700 |
| Dec 6, 2023 | Completed final sign-off Feb 2025 | 1455 Sacramento St | comply w/ #201989141: soft story retrofit per sfebc chapter 4d in accordance w/ 2022 cebc appendix a-4.Details
comply w/ #201989141: soft story retrofit per sfebc chapter 4d in accordance w/ 2022 cebc appendix a-4. | $160,000 |
| Nov 8, 2023 | Completed final sign-off Dec 2024 | 150 11th Av | remove/replace (e) window to france door in smae opening at rear of bldg at 2/f. construct (n) deck & staircase at rear of bldg (approx. 16'd x 18'l x 7.5'h).Details
remove/replace (e) window to france door in smae opening at rear of bldg at 2/f. construct (n) deck & staircase at rear of bldg (approx. 16'd x 18'l x 7.5'h). | $30,000 |
| Oct 24, 2023 | Completed final sign-off Dec 2024 | 150 11th Av | remodel (e) kitchen, powder room, & replace sheet rock w/ new. replace dry rot at the rear of house at 2/f. convert one (e) bathroom to two. add one new bathroom & replace shet rock w/ new at 3/f.Details
remodel (e) kitchen, powder room, & replace sheet rock w/ new. replace dry rot at the rear of house at 2/f. convert one (e) bathroom to two. add one new bathroom & replace shet rock w/ new at 3/f. | $150,000 |
| Oct 24, 2023 | Completed final sign-off Jan 2026 | 55 Allison St | legalize (e) storage room to bedroom. construct 1 bedroom, bathroom & install wet bar. all work at g/f.Details
legalize (e) storage room to bedroom. construct 1 bedroom, bathroom & install wet bar. all work at g/f. | $32,000 |
| Oct 18, 2023 | Completed final sign-off May 2024 | 145 Paloma Av | change tile on the patioDetails
change tile on the patio | $10,000 |
| Jan 17, 2023 | Completed final sign-off Feb 2023 | 145 Paloma Av | replace leaking stucco around two chimneys and replace penthouse wall with stucco in kind.Details
replace leaking stucco around two chimneys and replace penthouse wall with stucco in kind. | $8,000 |
| Jun 1, 2022 | Completed final sign-off Sep 2022 | 1484 Portola Dr | remove/reconstruct existing front staircase (brick steps).Details
remove/reconstruct existing front staircase (brick steps). | $35,000 |
| Feb 14, 2022 | Completed final sign-off Apr 2022 | 572 Cordova St | revision under pa #201908027680 and 202108055912. relocate one bathroom, install kitchenette with sink, and install wet bar. convert family room to new study room at ground floor.Details
revision under pa #201908027680 and 202108055912. relocate one bathroom, install kitchenette with sink, and install wet bar. convert family room to new study room at ground floor. | $20,000 |
| Sep 27, 2021 | In progress issued Nov 2024 | 1623 44th Av | alteration and addition at rear building for 1st flr, 2flr and 3 fl. adu at 1st flr.Details
alteration and addition at rear building for 1st flr, 2flr and 3 fl. adu at 1st flr. | $180,000 |
| Aug 5, 2021 | Completed final sign-off Apr 2022 | 572 Cordova St | recommencement and completion of work approved under pa# 201908027680Details
recommencement and completion of work approved under pa# 201908027680 | |
| May 26, 2021 | Completed final sign-off Jan 2022 | 128 Borica St | remodel 1 kitchen: change cabinet and countertop remodel 2 bathroom change tile & bathtub.Details
remodel 1 kitchen: change cabinet and countertop remodel 2 bathroom change tile & bathtub. | $50,000 |
| May 10, 2021 | Completed final sign-off Aug 2022 | 190 Prague St | construct 2 bedroom, 2 full bath, & media room at ground floor. remodel (e) bathroom & kitchen, add new bath, & replace (e) sheetrock w/ new at 2nd floor. in-fill (e) lightwell & install four skylight.Details
construct 2 bedroom, 2 full bath, & media room at ground floor. remodel (e) bathroom & kitchen, add new bath, & replace (e) sheetrock w/ new at 2nd floor. in-fill (e) lightwell & install four skylight. | $120,000 |
| Feb 6, 2020 | Completed final sign-off May 2021 | 722 Palmetto Av | construct office and storage, 2 full bathroom, relocate (e) bath room at ground floor, convert (e) dining room to study room and convert 1 bath room to 2 bath room at 2nd flDetails
construct office and storage, 2 full bathroom, relocate (e) bath room at ground floor, convert (e) dining room to study room and convert 1 bath room to 2 bath room at 2nd fl | $125,000 |
| Nov 8, 2019 | Never finaled issued Nov 2019, no final | 4131 Clement St | recommencement and comletion of work approved under pa# 201404244075 & 201408133709Details
recommencement and comletion of work approved under pa# 201404244075 & 201408133709 | $38,000 |
| Sep 20, 2019 | Completed final sign-off Dec 2019 | 1455 Sacramento St | repair steel chimney gas vent. to comply with nov# 201983361. eliminate rodent infestation. provide weather protection. restore window to operational condition. caulking holes & cracking on walls and repair local siding dyr rot.Details
repair steel chimney gas vent. to comply with nov# 201983361. eliminate rodent infestation. provide weather protection. restore window to operational condition. caulking holes & cracking on walls and repair local siding dyr rot. | $20,000 |
| Aug 2, 2019 | Expired or cancelled expired Apr 2022 | 572 Cordova St | construct 1 bedrm, 2 full bathrms, storage rm, family rm at ground flr. remodel (e) kitchen, bathrm & add 1 new bath rm at 2nd flrDetails
construct 1 bedrm, 2 full bathrms, storage rm, family rm at ground flr. remodel (e) kitchen, bathrm & add 1 new bath rm at 2nd flr | $78,000 |
| Apr 4, 2019 | Completed final sign-off Jun 2019 | 1455 Sacramento St | change the siding in the court yard. change 25 windows in the court yard. complaint 201872721 item #2.Details
change the siding in the court yard. change 25 windows in the court yard. complaint 201872721 item #2. | $40,000 |
| Dec 21, 2018 | Completed final sign-off Mar 2019 | 2066 46th Av | add deck at 2nd floor rear of buildingDetails
add deck at 2nd floor rear of building | $8,000 |
| Nov 27, 2018 | Completed final sign-off Apr 2019 | 2066 46th Av | add 2 bedrooms and 2 full bath on the 1st flr. replace wh to tanklessDetails
add 2 bedrooms and 2 full bath on the 1st flr. replace wh to tankless | $60,000 |
| Nov 20, 2018 | Completed final sign-off Apr 2019 | 247 Wilson St | remodel one bathroom and one kitchen. non structural. replace heater. no change to openin gs and wall layout. all lights shall be high efficacy w/ min one vacancy sensor in bathroomDetails
remodel one bathroom and one kitchen. non structural. replace heater. no change to openin gs and wall layout. all lights shall be high efficacy w/ min one vacancy sensor in bathroom | $25,000 |
| Nov 13, 2018 | Completed final sign-off Apr 2019 | 2066 46th Av | remodel kitchen and 1 bath. non-structural.Details
remodel kitchen and 1 bath. non-structural. | $25,000 |
| Apr 13, 2018 | Completed final sign-off Feb 2022 | 2466 Great Hy | add a (n) unit on 1st fl of an (e) 2 unit building. (n) deck and stairs at 3rd fl, reconfigure (e) deck/stairs at 2nd fl, infill lightwellat north property line, garage infill.Details
add a (n) unit on 1st fl of an (e) 2 unit building. (n) deck and stairs at 3rd fl, reconfigure (e) deck/stairs at 2nd fl, infill lightwellat north property line, garage infill. | $70,000 |
| Mar 29, 2018 | Completed final sign-off Dec 2018 | 200 Faxon Av | legalize dwelling unit @ 1st floor to comply with ord# 43-14. 2 bedrooms, 2 baths, 1 living rm and 1 kitchen.Details
legalize dwelling unit @ 1st floor to comply with ord# 43-14. 2 bedrooms, 2 baths, 1 living rm and 1 kitchen. | $32,000 |
| Mar 8, 2018 | Completed final sign-off Sep 2021 | 4542 Cabrillo St | proposed to legalized dwelling unit at 1st fl comply with ordinance 43-14Details
proposed to legalized dwelling unit at 1st fl comply with ordinance 43-14 | $80,000 |
| Feb 21, 2018 | Completed final sign-off Sep 2019 | 2307 15th Av | in response to nov #201763801 to legalize unauthorized dwelling unit at ground flr per ordinance 43-14.Details
in response to nov #201763801 to legalize unauthorized dwelling unit at ground flr per ordinance 43-14. | $40,000 |
| Jan 30, 2018 | Never finaled issued Nov 2020, no final | 450 Plymouth Av | add a new unit with 3 bedrooms & 2 bath at 1st flr area to comply with ordinance 162-16.Details
add a new unit with 3 bedrooms & 2 bath at 1st flr area to comply with ordinance 162-16. | $80,000 |
| Jan 9, 2018 | Completed final sign-off Dec 2018 | 1575 33rd Av | revision to 201710050547 to remodel ground floor bathroom. no exterior workDetails
revision to 201710050547 to remodel ground floor bathroom. no exterior work | $10,000 |
| Dec 7, 2017 | Completed final sign-off Mar 2018 | 2468 Great Hy | remodel kitchen and bathroom at sencond floor and third floorDetails
remodel kitchen and bathroom at sencond floor and third floor | $40,000 |
| Nov 16, 2017 | Expired or cancelled expired Dec 2023 | 200 Faxon Av | remodel (e) kitchen & bathroom. construct one new full bathroom. all work at 2/f.Details
remodel (e) kitchen & bathroom. construct one new full bathroom. all work at 2/f. | $3,600 |
| Oct 5, 2017 | Never finaled issued Oct 2017, no final | 1575 33rd Av | to remodel (e) half & full bathroom at the 2nd floor.Details
to remodel (e) half & full bathroom at the 2nd floor. | $15,000 |
| Sep 27, 2017 | Completed final sign-off Jun 2018 | 2078 34th Av | 1st floor: construct a new bedroom, a new full bathroom, new hall way, new family and home office.Details
1st floor: construct a new bedroom, a new full bathroom, new hall way, new family and home office. | $50,000 |
| Apr 17, 2017 | Completed final sign-off Aug 2017 | 55 Allison St | repair the stucco on the facade in kind. no other work or change in windows.Details
repair the stucco on the facade in kind. no other work or change in windows. | $7,000 |
| Apr 17, 2017 | Completed final sign-off Aug 2017 | 401 Italy Av | replace and repair stucco of the italy street facade only. no other work or window changes. repair in kindDetails
replace and repair stucco of the italy street facade only. no other work or window changes. repair in kind | $15,000 |
| Mar 30, 2017 | Completed final sign-off Feb 2018 | 2139 30th Av | add a family room, 1 bedroom with new fire place and a full bathroom on the 1st. remodel kitchen at 2nd. relocate furnance, w/h & laundry facilities and garage door alteration.Details
add a family room, 1 bedroom with new fire place and a full bathroom on the 1st. remodel kitchen at 2nd. relocate furnance, w/h & laundry facilities and garage door alteration. | $60,000 |
| Jun 9, 2016 | Completed final sign-off Nov 2016 | 1528 Ortega St | remodel kitchen. convert (e) bathroom to a full bathroom and a half bathroom, replace 2 front windows with alum wood cladding windows on 2nd flr. add on office, a bedrm, a mudroom and a full bath on 1st flr.Details
remodel kitchen. convert (e) bathroom to a full bathroom and a half bathroom, replace 2 front windows with alum wood cladding windows on 2nd flr. add on office, a bedrm, a mudroom and a full bath on 1st flr. | $50,000 |
| Dec 31, 2014 | Completed final sign-off Nov 2016 | 659 11th Av | 2nd floor: remodel (e) kitchen and bathroom, add a wet bar and new bathroom.add elevator add a new rear deck at 2nd floor. 1st floor: enlarge convert bathroom to master bathroom, reconfiguration of layout per plan.Details
2nd floor: remodel (e) kitchen and bathroom, add a wet bar and new bathroom.add elevator add a new rear deck at 2nd floor. 1st floor: enlarge convert bathroom to master bathroom, reconfiguration of layout per plan. | $55,000 |
| Jul 3, 2014 | Never finaled issued Jul 2014, no final | 4131 Clement St | revision to app#201404244075 to change footing detail at ground floor.Details
revision to app#201404244075 to change footing detail at ground floor. | $100 |
| May 12, 2014 | Completed final sign-off Jun 2014 | 238 Chenery St | change backyard siding 25 ft by 20 ft.Details
change backyard siding 25 ft by 20 ft. | $6,000 |
| Apr 24, 2014 | Never finaled issued May 2014, no final | 4131 Clement St | 1)one new bathroom, bedroom, family rm, and laundry area to be constructed at groun floor per plan. 2) remove ext stair and enclose extg stairwell at ground floor, 2nd, 3rd floors. 3)reconfigure extg rooms at 2nd & 3rd flrs.Details
1)one new bathroom, bedroom, family rm, and laundry area to be constructed at groun floor per plan. 2) remove ext stair and enclose extg stairwell at ground floor, 2nd, 3rd floors. 3)reconfigure extg rooms at 2nd & 3rd flrs. | $80,000 |
| Nov 20, 2013 | Expired or cancelled cancelled Jul 2014 | 965 Hayes St | new bathroom in existing condo. new closet, widen e closet door in non bearing wall; to comply with cec150(k) 10, no new property line window.Details
new bathroom in existing condo. new closet, widen e closet door in non bearing wall; to comply with cec150(k) 10, no new property line window. | $3,000 |
| Feb 22, 2013 | Completed final sign-off Aug 2013 | 101 Lunado Wy | reconfigure e bathrooms at 3rd floor per plan. remodel e bathroom, laundry and kitchen at 2nd floor per plan. remove e partition wall and provide new beamDetails
reconfigure e bathrooms at 3rd floor per plan. remodel e bathroom, laundry and kitchen at 2nd floor per plan. remove e partition wall and provide new beam | $38,000 |
| Oct 5, 2012 | Completed final sign-off Apr 2013 | 1484 Portola Dr | remodel (e) kitchen & bathroom on 1st floor, replace (e) concrete foundation with reinforced concrete foundation & (e) concrete slab with water proof membranes under in (e) garage levelDetails
remodel (e) kitchen & bathroom on 1st floor, replace (e) concrete foundation with reinforced concrete foundation & (e) concrete slab with water proof membranes under in (e) garage level | $25,000 |
| Sep 25, 2012 | Completed final sign-off Jan 2013 | 2530 33rd Av | add a bath and 3 storage areas at ground floor.Details
add a bath and 3 storage areas at ground floor. | $15,000 |
| Aug 20, 2012 | Completed final sign-off Nov 2012 | 1455 Sacramento St | apt. #3: remodel apt 3 on 2nd floor, remodel (e) bath, add a (n) bath, convert (e) living room to a (n) bedroom, replace some cabinets in (e) kitchen for apt #3 only.Details
apt. #3: remodel apt 3 on 2nd floor, remodel (e) bath, add a (n) bath, convert (e) living room to a (n) bedroom, replace some cabinets in (e) kitchen for apt #3 only. | $15,000 |
| Jul 8, 2011 | Completed final sign-off Oct 2011 | 218 Russia Av | repair the stucco 10 ft x 6 ft in the front, in kind. no changes to window, walls or doors.Details
repair the stucco 10 ft x 6 ft in the front, in kind. no changes to window, walls or doors. | $1,000 |
| Jan 21, 2011 | Completed final sign-off May 2011 | 162 Lunado Ct | remodel (e) kitchen, 2 baths and a closet on 2nd fl. expand (e) bedrm, add a closet, remodel (e) bath on ground fl. dry rot repair rear deck (10%) and rebuild side stairs from deck to back yard.Details
remodel (e) kitchen, 2 baths and a closet on 2nd fl. expand (e) bedrm, add a closet, remodel (e) bath on ground fl. dry rot repair rear deck (10%) and rebuild side stairs from deck to back yard. | $25,000 |
| Sep 27, 2010 | Expired or cancelled cancelled Oct 2011 | 530 44th Av | change the dry wall at the sunrooms wall due to leadage. 14'x8'Details
change the dry wall at the sunrooms wall due to leadage. 14'x8' | $2,500 |
| Jul 29, 2010 | Completed final sign-off Dec 2010 | 2633 14th Av | interior remodelling. 1st fl: remodel (e) master bath. 2nd fl: remodel (e) bath and add (n) powder rm., remove one single glazed window in lightwell not visible from street, remove 1 skylight, add 2 dual glazed skylights, replace 2 (e) windows in (e) windopws in light wells in kind.Details
interior remodelling. 1st fl: remodel (e) master bath. 2nd fl: remodel (e) bath and add (n) powder rm., remove one single glazed window in lightwell not visible from street, remove 1 skylight, add 2 dual glazed skylights, replace 2 (e) windows in (e) windopws in light wells in kind. | $68,860 |
| Oct 23, 2009 | Completed final sign-off Nov 2009 | 1455 Sacramento St | to comply with nov 200923944 dated 10-08-2009. change 1 window in lightwell at rear, in kind. not visible from street. replace in kind.Details
to comply with nov 200923944 dated 10-08-2009. change 1 window in lightwell at rear, in kind. not visible from street. replace in kind. | $800 |
| Sep 25, 2009 | Completed final sign-off Dec 2009 | 355 Vernon St | convert (e) family into one bedroom and family room, one bath into two baths; repair rear deck.Details
convert (e) family into one bedroom and family room, one bath into two baths; repair rear deck. | $40,000 |
| Aug 6, 2009 | Expired or cancelled expired Oct 2010 | 467 Banks St | change two windows in backyard, same size.Details
change two windows in backyard, same size. | $600 |
| Jul 2, 2009 | Completed final sign-off Jul 2009 | 338 26th Av | install a new siding on the left side 1,300 square ft. not visible from street.Details
install a new siding on the left side 1,300 square ft. not visible from street. | $8,500 |
| May 19, 2009 | Completed final sign-off Sep 2009 | 1455 Sacramento St | remodel existing apt 7: remodel 2 (e) bathrooms & 1 kitchen, add (n) insulation under (n) gyp. bd., replace 4 windows (not visible from street)Details
remodel existing apt 7: remodel 2 (e) bathrooms & 1 kitchen, add (n) insulation under (n) gyp. bd., replace 4 windows (not visible from street) | $60,000 |
| May 12, 2009 | Completed final sign-off Jun 2009 | 529 25th Av | replace the front door frame, stucco 25'x10'.Details
replace the front door frame, stucco 25'x10'. | $3,500 |
| Mar 2, 2009 | Expired or cancelled expired Jun 2016 | 659 11th Av | revise application 200805061411 to enlarge bathroom, to keep (e) sliding door and relocate closet in bedroom, all work at ground floor.Details
revise application 200805061411 to enlarge bathroom, to keep (e) sliding door and relocate closet in bedroom, all work at ground floor. | |
| Jul 14, 2008 | Expired or cancelled expired Mar 2014 | 677 12th Av | remove & replace dry rot window walls at existing rear patio, to resolve existing brick wall problem, by adding support low concrete wall.Details
remove & replace dry rot window walls at existing rear patio, to resolve existing brick wall problem, by adding support low concrete wall. | $4,500 |
| Jul 10, 2008 | Completed final sign-off Oct 2008 | 5294 Mission St | remodel bathroom, change the tiles, and the dry wal, remodel the kitchen, change the dry wall, one ceiling, change the cabinets, change countertops, change floor tiles, no structural work.Details
remodel bathroom, change the tiles, and the dry wal, remodel the kitchen, change the dry wall, one ceiling, change the cabinets, change countertops, change floor tiles, no structural work. | $15,000 |
| Jun 3, 2008 | Completed final sign-off Aug 2008 | 1746 43rd Av | legalize bedroom, full bathroom and a closet at rear portion of existing garage. comply nov 200857318.Details
legalize bedroom, full bathroom and a closet at rear portion of existing garage. comply nov 200857318. | $18,000 |
| May 21, 2008 | Completed final sign-off Jun 2008 | 2660 Greenwich St | replace approx. 200 square ft. of decking (2x6) at (2) decks at rear. no change, same location.Details
replace approx. 200 square ft. of decking (2x6) at (2) decks at rear. no change, same location. | $4,000 |
| Feb 19, 2008 | Completed final sign-off May 2008 | 1746 43rd Av | remodel kitchen, sheetrock, new cabinets, sink.Details
remodel kitchen, sheetrock, new cabinets, sink. | $3,800 |
| Dec 18, 2007 | Never finaled issued Dec 2007, no final | 1746 43rd Av | remodel living room, change dry wall, repair leak @ walls, remodel bathroom, change tiles, dry walls.Details
remodel living room, change dry wall, repair leak @ walls, remodel bathroom, change tiles, dry walls. | $9,000 |