Peter Liu Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Dec 2025
- Last 24 months
- 5 permits filed
71 permits since 2000: 57 completed, 1 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 never finaled. Typically 22 days from filing to permit and 123 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2025 | Completed final sign-off Dec 2025 | 1614 24th Av | construct scaffold, repair stucco for both sides of the stairway and both sides of the garage like for like. rent temporary toilet, paint exterior.Details
construct scaffold, repair stucco for both sides of the stairway and both sides of the garage like for like. rent temporary toilet, paint exterior. | $10,000 |
| Oct 3, 2024 | Completed final sign-off Oct 2025 | 359 Munich St | construct 2 bedroom, 2 bathroom, media room & install wetbar at g/f. re-arrange bedroom, kitchen, bathroom. construct 1 new bathroom & re-built interior staircase at 2/f. construct new 3'height concrete retaining wall at rear yard.Details
construct 2 bedroom, 2 bathroom, media room & install wetbar at g/f. re-arrange bedroom, kitchen, bathroom. construct 1 new bathroom & re-built interior staircase at 2/f. construct new 3'height concrete retaining wall at rear yard. | $368,000 |
| Jul 22, 2024 | Completed final sign-off Dec 2024 | 150 11th Av | revision to pa #202310249374: remove (e) interior staircase, replace w/ steel spiral stair down to g/f. sheet rock whole garage level.Details
revision to pa #202310249374: remove (e) interior staircase, replace w/ steel spiral stair down to g/f. sheet rock whole garage level. | $18,000 |
| Nov 8, 2023 | Completed final sign-off Dec 2024 | 150 11th Av | remove/replace (e) window to france door in smae opening at rear of bldg at 2/f. construct (n) deck & staircase at rear of bldg (approx. 16'd x 18'l x 7.5'h).Details
remove/replace (e) window to france door in smae opening at rear of bldg at 2/f. construct (n) deck & staircase at rear of bldg (approx. 16'd x 18'l x 7.5'h). | $30,000 |
| Jun 1, 2022 | Completed final sign-off Sep 2022 | 1484 Portola Dr | remove/reconstruct existing front staircase (brick steps).Details
remove/reconstruct existing front staircase (brick steps). | $35,000 |
| Apr 13, 2018 | Completed final sign-off Feb 2022 | 2466 Great Hy | add a (n) unit on 1st fl of an (e) 2 unit building. (n) deck and stairs at 3rd fl, reconfigure (e) deck/stairs at 2nd fl, infill lightwellat north property line, garage infill.Details
add a (n) unit on 1st fl of an (e) 2 unit building. (n) deck and stairs at 3rd fl, reconfigure (e) deck/stairs at 2nd fl, infill lightwellat north property line, garage infill. | $70,000 |
| Apr 24, 2014 | Never finaled issued May 2014, no final | 4131 Clement St | 1)one new bathroom, bedroom, family rm, and laundry area to be constructed at groun floor per plan. 2) remove ext stair and enclose extg stairwell at ground floor, 2nd, 3rd floors. 3)reconfigure extg rooms at 2nd & 3rd flrs.Details
1)one new bathroom, bedroom, family rm, and laundry area to be constructed at groun floor per plan. 2) remove ext stair and enclose extg stairwell at ground floor, 2nd, 3rd floors. 3)reconfigure extg rooms at 2nd & 3rd flrs. | $80,000 |
| Jan 21, 2011 | Completed final sign-off May 2011 | 162 Lunado Ct | remodel (e) kitchen, 2 baths and a closet on 2nd fl. expand (e) bedrm, add a closet, remodel (e) bath on ground fl. dry rot repair rear deck (10%) and rebuild side stairs from deck to back yard.Details
remodel (e) kitchen, 2 baths and a closet on 2nd fl. expand (e) bedrm, add a closet, remodel (e) bath on ground fl. dry rot repair rear deck (10%) and rebuild side stairs from deck to back yard. | $25,000 |