Block 1370, lot 034
150 11th Ave
- City’s use
- Single Family Residential
- Built
- 1910
- Stories
- 2
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,850 sq ft
- Lot
- 3,005 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 28, 2025 | Completed final sign-off Dec 2025 | 150 11th Av | Lemus Construction Inc | regarde and widen (e) parking space within a non habitable basement, add landing between parking space and (e) non habitable basement. rebuild about 20 liner feet of (n) foundation. add shear wall and hardware connection to floor joistDetails
regarde and widen (e) parking space within a non habitable basement, add landing between parking space and (e) non habitable basement. rebuild about 20 liner feet of (n) foundation. add shear wall and hardware connection to floor joist | $90,000 |
| Jul 22, 2024 | Completed final sign-off Dec 2024 | 150 11th Av | Peter Liu Construction Inc | revision to pa #202310249374: remove (e) interior staircase, replace w/ steel spiral stair down to g/f. sheet rock whole garage level.Details
revision to pa #202310249374: remove (e) interior staircase, replace w/ steel spiral stair down to g/f. sheet rock whole garage level. | $18,000 |
| Feb 22, 2024 | Completed final sign-off Aug 2024 | 150 11th Av | Peter Liu Construction Inc | replace wood windows on 2nd and 3rd floors with in-kind wood windows, front facing. max u-factor=0.30. same size and same locationDetails
replace wood windows on 2nd and 3rd floors with in-kind wood windows, front facing. max u-factor=0.30. same size and same location | $9,700 |
| Nov 8, 2023 | Completed final sign-off Dec 2024 | 150 11th Av | Peter Liu Construction Inc | remove/replace (e) window to france door in smae opening at rear of bldg at 2/f. construct (n) deck & staircase at rear of bldg (approx. 16'd x 18'l x 7.5'h).Details
remove/replace (e) window to france door in smae opening at rear of bldg at 2/f. construct (n) deck & staircase at rear of bldg (approx. 16'd x 18'l x 7.5'h). | $30,000 |
| Oct 24, 2023 | Completed final sign-off Dec 2024 | 150 11th Av | Peter Liu Construction Inc | remodel (e) kitchen, powder room, & replace sheet rock w/ new. replace dry rot at the rear of house at 2/f. convert one (e) bathroom to two. add one new bathroom & replace shet rock w/ new at 3/f.Details
remodel (e) kitchen, powder room, & replace sheet rock w/ new. replace dry rot at the rear of house at 2/f. convert one (e) bathroom to two. add one new bathroom & replace shet rock w/ new at 3/f. | $150,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Peter Liu Construction Inc (4), Lemus Construction Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.