Peter Liu Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Dec 2025
- Last 24 months
- 5 permits filed
71 permits since 2000: 57 completed, 1 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
7 deck permits: 7 completed. Typically 6 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2023 | Completed final sign-off Dec 2024 | 150 11th Av | remove/replace (e) window to france door in smae opening at rear of bldg at 2/f. construct (n) deck & staircase at rear of bldg (approx. 16'd x 18'l x 7.5'h).Details
remove/replace (e) window to france door in smae opening at rear of bldg at 2/f. construct (n) deck & staircase at rear of bldg (approx. 16'd x 18'l x 7.5'h). | $30,000 |
| Dec 21, 2018 | Completed final sign-off Mar 2019 | 2066 46th Av | add deck at 2nd floor rear of buildingDetails
add deck at 2nd floor rear of building | $8,000 |
| Apr 13, 2018 | Completed final sign-off Feb 2022 | 2466 Great Hy | add a (n) unit on 1st fl of an (e) 2 unit building. (n) deck and stairs at 3rd fl, reconfigure (e) deck/stairs at 2nd fl, infill lightwellat north property line, garage infill.Details
add a (n) unit on 1st fl of an (e) 2 unit building. (n) deck and stairs at 3rd fl, reconfigure (e) deck/stairs at 2nd fl, infill lightwellat north property line, garage infill. | $70,000 |
| Dec 31, 2014 | Completed final sign-off Nov 2016 | 659 11th Av | 2nd floor: remodel (e) kitchen and bathroom, add a wet bar and new bathroom.add elevator add a new rear deck at 2nd floor. 1st floor: enlarge convert bathroom to master bathroom, reconfiguration of layout per plan.Details
2nd floor: remodel (e) kitchen and bathroom, add a wet bar and new bathroom.add elevator add a new rear deck at 2nd floor. 1st floor: enlarge convert bathroom to master bathroom, reconfiguration of layout per plan. | $55,000 |
| Jan 21, 2011 | Completed final sign-off May 2011 | 162 Lunado Ct | remodel (e) kitchen, 2 baths and a closet on 2nd fl. expand (e) bedrm, add a closet, remodel (e) bath on ground fl. dry rot repair rear deck (10%) and rebuild side stairs from deck to back yard.Details
remodel (e) kitchen, 2 baths and a closet on 2nd fl. expand (e) bedrm, add a closet, remodel (e) bath on ground fl. dry rot repair rear deck (10%) and rebuild side stairs from deck to back yard. | $25,000 |
| Sep 25, 2009 | Completed final sign-off Dec 2009 | 355 Vernon St | convert (e) family into one bedroom and family room, one bath into two baths; repair rear deck.Details
convert (e) family into one bedroom and family room, one bath into two baths; repair rear deck. | $40,000 |
| May 21, 2008 | Completed final sign-off Jun 2008 | 2660 Greenwich St | replace approx. 200 square ft. of decking (2x6) at (2) decks at rear. no change, same location.Details
replace approx. 200 square ft. of decking (2x6) at (2) decks at rear. no change, same location. | $4,000 |