Back to kitchen remodel contractors
Peter Liu Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Dec 2025
- Last 24 months
- 5 permits filed
71 permits since 2000: 57 completed, 1 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
23 kitchen remodel permits: 21 completed, 2 expired or cancelled. Typically 6 days from filing to permit and 155 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2025 | Completed final sign-off Aug 2026 | 1455 Sacramento St | unit #2: remodel (e) kitchen, bathroom. add 1 new bathroom. convert (e) living room to a (n) bedroom.Details
unit #2: remodel (e) kitchen, bathroom. add 1 new bathroom. convert (e) living room to a (n) bedroom. | $75,000 |
| Nov 12, 2025 | Completed final sign-off Jun 2026 | 2142 20th Av | remodel (e) kitchen, convert 1 (e) bathroom to 2 full bathroom and install 1 2x2 skylight. all work on 2/f.Details
remodel (e) kitchen, convert 1 (e) bathroom to 2 full bathroom and install 1 2x2 skylight. all work on 2/f. | $96,500 |
| Oct 3, 2024 | Completed final sign-off Oct 2025 | 359 Munich St | construct 2 bedroom, 2 bathroom, media room & install wetbar at g/f. re-arrange bedroom, kitchen, bathroom. construct 1 new bathroom & re-built interior staircase at 2/f. construct new 3'height concrete retaining wall at rear yard.Details
construct 2 bedroom, 2 bathroom, media room & install wetbar at g/f. re-arrange bedroom, kitchen, bathroom. construct 1 new bathroom & re-built interior staircase at 2/f. construct new 3'height concrete retaining wall at rear yard. | $368,000 |
| Oct 24, 2023 | Completed final sign-off Dec 2024 | 150 11th Av | remodel (e) kitchen, powder room, & replace sheet rock w/ new. replace dry rot at the rear of house at 2/f. convert one (e) bathroom to two. add one new bathroom & replace shet rock w/ new at 3/f.Details
remodel (e) kitchen, powder room, & replace sheet rock w/ new. replace dry rot at the rear of house at 2/f. convert one (e) bathroom to two. add one new bathroom & replace shet rock w/ new at 3/f. | $150,000 |
| Feb 14, 2022 | Completed final sign-off Apr 2022 | 572 Cordova St | revision under pa #201908027680 and 202108055912. relocate one bathroom, install kitchenette with sink, and install wet bar. convert family room to new study room at ground floor.Details
revision under pa #201908027680 and 202108055912. relocate one bathroom, install kitchenette with sink, and install wet bar. convert family room to new study room at ground floor. | $20,000 |
| May 26, 2021 | Completed final sign-off Jan 2022 | 128 Borica St | remodel 1 kitchen: change cabinet and countertop remodel 2 bathroom change tile & bathtub.Details
remodel 1 kitchen: change cabinet and countertop remodel 2 bathroom change tile & bathtub. | $50,000 |
| May 10, 2021 | Completed final sign-off Aug 2022 | 190 Prague St | construct 2 bedroom, 2 full bath, & media room at ground floor. remodel (e) bathroom & kitchen, add new bath, & replace (e) sheetrock w/ new at 2nd floor. in-fill (e) lightwell & install four skylight.Details
construct 2 bedroom, 2 full bath, & media room at ground floor. remodel (e) bathroom & kitchen, add new bath, & replace (e) sheetrock w/ new at 2nd floor. in-fill (e) lightwell & install four skylight. | $120,000 |
| Aug 2, 2019 | Expired or cancelled expired Apr 2022 | 572 Cordova St | construct 1 bedrm, 2 full bathrms, storage rm, family rm at ground flr. remodel (e) kitchen, bathrm & add 1 new bath rm at 2nd flrDetails
construct 1 bedrm, 2 full bathrms, storage rm, family rm at ground flr. remodel (e) kitchen, bathrm & add 1 new bath rm at 2nd flr | $78,000 |
| Nov 20, 2018 | Completed final sign-off Apr 2019 | 247 Wilson St | remodel one bathroom and one kitchen. non structural. replace heater. no change to openin gs and wall layout. all lights shall be high efficacy w/ min one vacancy sensor in bathroomDetails
remodel one bathroom and one kitchen. non structural. replace heater. no change to openin gs and wall layout. all lights shall be high efficacy w/ min one vacancy sensor in bathroom | $25,000 |
| Nov 13, 2018 | Completed final sign-off Apr 2019 | 2066 46th Av | remodel kitchen and 1 bath. non-structural.Details
remodel kitchen and 1 bath. non-structural. | $25,000 |
| Mar 29, 2018 | Completed final sign-off Dec 2018 | 200 Faxon Av | legalize dwelling unit @ 1st floor to comply with ord# 43-14. 2 bedrooms, 2 baths, 1 living rm and 1 kitchen.Details
legalize dwelling unit @ 1st floor to comply with ord# 43-14. 2 bedrooms, 2 baths, 1 living rm and 1 kitchen. | $32,000 |
| Dec 7, 2017 | Completed final sign-off Mar 2018 | 2468 Great Hy | remodel kitchen and bathroom at sencond floor and third floorDetails
remodel kitchen and bathroom at sencond floor and third floor | $40,000 |
| Nov 16, 2017 | Expired or cancelled expired Dec 2023 | 200 Faxon Av | remodel (e) kitchen & bathroom. construct one new full bathroom. all work at 2/f.Details
remodel (e) kitchen & bathroom. construct one new full bathroom. all work at 2/f. | $3,600 |
| Mar 30, 2017 | Completed final sign-off Feb 2018 | 2139 30th Av | add a family room, 1 bedroom with new fire place and a full bathroom on the 1st. remodel kitchen at 2nd. relocate furnance, w/h & laundry facilities and garage door alteration.Details
add a family room, 1 bedroom with new fire place and a full bathroom on the 1st. remodel kitchen at 2nd. relocate furnance, w/h & laundry facilities and garage door alteration. | $60,000 |
| Jun 9, 2016 | Completed final sign-off Nov 2016 | 1528 Ortega St | remodel kitchen. convert (e) bathroom to a full bathroom and a half bathroom, replace 2 front windows with alum wood cladding windows on 2nd flr. add on office, a bedrm, a mudroom and a full bath on 1st flr.Details
remodel kitchen. convert (e) bathroom to a full bathroom and a half bathroom, replace 2 front windows with alum wood cladding windows on 2nd flr. add on office, a bedrm, a mudroom and a full bath on 1st flr. | $50,000 |
| Dec 31, 2014 | Completed final sign-off Nov 2016 | 659 11th Av | 2nd floor: remodel (e) kitchen and bathroom, add a wet bar and new bathroom.add elevator add a new rear deck at 2nd floor. 1st floor: enlarge convert bathroom to master bathroom, reconfiguration of layout per plan.Details
2nd floor: remodel (e) kitchen and bathroom, add a wet bar and new bathroom.add elevator add a new rear deck at 2nd floor. 1st floor: enlarge convert bathroom to master bathroom, reconfiguration of layout per plan. | $55,000 |
| Feb 22, 2013 | Completed final sign-off Aug 2013 | 101 Lunado Wy | reconfigure e bathrooms at 3rd floor per plan. remodel e bathroom, laundry and kitchen at 2nd floor per plan. remove e partition wall and provide new beamDetails
reconfigure e bathrooms at 3rd floor per plan. remodel e bathroom, laundry and kitchen at 2nd floor per plan. remove e partition wall and provide new beam | $38,000 |
| Oct 5, 2012 | Completed final sign-off Apr 2013 | 1484 Portola Dr | remodel (e) kitchen & bathroom on 1st floor, replace (e) concrete foundation with reinforced concrete foundation & (e) concrete slab with water proof membranes under in (e) garage levelDetails
remodel (e) kitchen & bathroom on 1st floor, replace (e) concrete foundation with reinforced concrete foundation & (e) concrete slab with water proof membranes under in (e) garage level | $25,000 |
| Aug 20, 2012 | Completed final sign-off Nov 2012 | 1455 Sacramento St | apt. #3: remodel apt 3 on 2nd floor, remodel (e) bath, add a (n) bath, convert (e) living room to a (n) bedroom, replace some cabinets in (e) kitchen for apt #3 only.Details
apt. #3: remodel apt 3 on 2nd floor, remodel (e) bath, add a (n) bath, convert (e) living room to a (n) bedroom, replace some cabinets in (e) kitchen for apt #3 only. | $15,000 |
| Jan 21, 2011 | Completed final sign-off May 2011 | 162 Lunado Ct | remodel (e) kitchen, 2 baths and a closet on 2nd fl. expand (e) bedrm, add a closet, remodel (e) bath on ground fl. dry rot repair rear deck (10%) and rebuild side stairs from deck to back yard.Details
remodel (e) kitchen, 2 baths and a closet on 2nd fl. expand (e) bedrm, add a closet, remodel (e) bath on ground fl. dry rot repair rear deck (10%) and rebuild side stairs from deck to back yard. | $25,000 |
| May 19, 2009 | Completed final sign-off Sep 2009 | 1455 Sacramento St | remodel existing apt 7: remodel 2 (e) bathrooms & 1 kitchen, add (n) insulation under (n) gyp. bd., replace 4 windows (not visible from street)Details
remodel existing apt 7: remodel 2 (e) bathrooms & 1 kitchen, add (n) insulation under (n) gyp. bd., replace 4 windows (not visible from street) | $60,000 |
| Jul 10, 2008 | Completed final sign-off Oct 2008 | 5294 Mission St | remodel bathroom, change the tiles, and the dry wal, remodel the kitchen, change the dry wall, one ceiling, change the cabinets, change countertops, change floor tiles, no structural work.Details
remodel bathroom, change the tiles, and the dry wal, remodel the kitchen, change the dry wall, one ceiling, change the cabinets, change countertops, change floor tiles, no structural work. | $15,000 |
| Feb 19, 2008 | Completed final sign-off May 2008 | 1746 43rd Av | remodel kitchen, sheetrock, new cabinets, sink.Details
remodel kitchen, sheetrock, new cabinets, sink. | $3,800 |