Block 1380, lot 022
190 21st Av
11 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 29, 2026 | In progress | 190 21st Av | revision to 202605131204: scope to state in kind removal and replacement of stucco 4 levels, street facing of north south and west sides of bldg. in kind dryrot repairs behind stucco. board replacements. | ||
| May 13, 2026 | In progress | 190 21st Av | in kind stucco repairs, in kind dryrot and board fix repairs, street facing. | $35,000 | |
| Jan 21, 2026 | In progress | 190 21st Av | Golden Blaze Fire Protection | unit 9-12- design and install retrofit automatic wet fire sprinklers system per nfpa 13 (2022 ed) and the design and install of a 2" fire service per sffd and water dept. ref ti 202504033634 | $17,540 |
| Jun 3, 2025 | In progress | 190 21st Av | Winder Construction Inc. | remodel 8 units for additonal bedrooms and in unit laundry. remodel kitchen and bath fixtures and finishes. replace furance and ducting. add exterior windows. see apps 202504033633, 3634, 3635. comply with nov 201991371 | $100,000 |
| Apr 17, 2025 | In progress | 190 21st Av | Winder Construction Inc. | legalize udu on 2nd floor as unit #1a. see separate permits: add 3 adu in ground floor under pa# 202504033634 with soft story retrofit under pa# 202504033633. | $150,000 |
| Apr 17, 2025 | In progress | 190 21st Av | Winder Construction Inc. | soft-story retrofit of g/f to comply with nov #201991371. see separate permit to add 3 adu at ground floor under pa# 202504033634. | $100,000 |
| Apr 17, 2025 | In progress | 190 21st Av | Winder Construction Inc. | add 3 adu on g/f per ord 162-16 & planning code 207c4. remove 4 garages. add unit entries with new doors & windows. see separate permit for soft story retrofit on ground floor under pa# 202504033633 to comply with complaint# 201991371. | $150,000 |
| Sep 13, 2024 | In progress | 190 21st Av | International Fire Inc | upgrade existing fire alarm system in non sprinklered building toi comply with 2022 cbc/cfc, nfpa 72 and sffcsec 1103.7.6.1. replace e facu and add radio to monitor system. smokes in common areas and pulls each level and exit. horn/strobes in comomon areas and install low frequency sounders inside | $17,800 |
| Aug 29, 2018 | Expired or cancelled | 190 21st Av | reconfigure 4th level units. convert 2, 1 bedrooms to 2 bedrooms and convert 1 studio to 1 bedroom 2 new windows | $30,000 | |
| Jul 3, 2018 | Expired or cancelled | 190 21st Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $90,000 | |
| Jun 10, 2016 | Completed | 190 21st Av | S'top Home Service Roofing Co. Inc. | reroofing. | $16,000 |