Block 4172, lot 004
2524 03rd St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 2,233 sq ft
- Lot
- 2,125 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 8, 2026 | In progress filed Jul 2026, not yet issued | 2524 03rd St | horizontal addition at the rear of the property extending the basement to align with the ground floor and second floor. 2526 03rd st: including a core and shell tenant improvement, new ada restroom, accessible entrance door opener. 2524-03rd st-removal of wall between kitchen and bedroom for open.Details
horizontal addition at the rear of the property extending the basement to align with the ground floor and second floor. 2526 03rd st: including a core and shell tenant improvement, new ada restroom, accessible entrance door opener. 2524-03rd st-removal of wall between kitchen and bedroom for open. | $60,000 | |
| Jun 9, 2026 | In progress issued Aug 2026 | 2526 03rd St | Building Construction Express | 2526 3rd st- ground floor to remove (e) angled storedoor and lower (e) concret landing to conform to code required slope. install (n) store front door. construct (n) landing interior side of door and slopoed walk up to finish floor not exceeding 5.0% slopeDetails
2526 3rd st- ground floor to remove (e) angled storedoor and lower (e) concret landing to conform to code required slope. install (n) store front door. construct (n) landing interior side of door and slopoed walk up to finish floor not exceeding 5.0% slope | $5,000 |
| May 8, 2026 | In progress issued May 2026 | 2524 03rd St | F Liu Construction | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $10,561 |
| Aug 11, 2017 | Never finaled issued Aug 2017, no final | 2524 03rd St | street spaceDetails
street space | ||
| Nov 8, 2006 | Expired or cancelled expired Aug 2010 | 2524 03rd St | Sun Roofing & Constr. Company, Inc. | reroofingDetails
reroofing | $8,500 |
| Sep 19, 2001 | Expired or cancelled expired Mar 2002 | 2524 03rd St | Vdi | install vinyl siding to right & left sides of house only. not visible . no structural changeDetails
install vinyl siding to right & left sides of house only. not visible . no structural change | $5,500 |
| Aug 15, 2001 | Completed final sign-off Oct 2001 | 2524 03rd St | Sears Home Improvemt Prod, | install vinyl to back & side of house, not visible from street, no structural changeDetails
install vinyl to back & side of house, not visible from street, no structural change | $18,940 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.