Arcline Development Inc
- Based in
- Millbrae
- On San Francisco permits
- Apr 2026 to Aug 2026
- Last 24 months
- 7 permits filed
7 permits since 2000: 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2026 | In progress issued Aug 2026 | 25 Claremont Bl | revision to pa#: 202608076234. structural drawing (e) floor joists are 2x8 instead of 2x10. and existing footing already existing where new footing was shown. this footing is now shown as existing instead of new. revised slab on grade details.Details
revision to pa#: 202608076234. structural drawing (e) floor joists are 2x8 instead of 2x10. and existing footing already existing where new footing was shown. this footing is now shown as existing instead of new. revised slab on grade details. | |
| Aug 20, 2026 | In progress issued Aug 2026 | 2442 41st Av | revision to bpa: 202607205244 - set back 2 foot from property line on north side wall at ground floor.Details
revision to bpa: 202607205244 - set back 2 foot from property line on north side wall at ground floor. | |
| Aug 20, 2026 | In progress issued Sep 2026 | 1467 23rd Av | remodel (e) kitchen, bathroom, add new full bathroom and replace (e) sheet-rock w new at 2nd floor. construct 2 bed room, 2 full bath room, family room, and install wet bar at ground floor including in fill one bedroom. infill (e) light wellDetails
remodel (e) kitchen, bathroom, add new full bathroom and replace (e) sheet-rock w new at 2nd floor. construct 2 bed room, 2 full bath room, family room, and install wet bar at ground floor including in fill one bedroom. infill (e) light well | $420,080 |
| Aug 14, 2026 | In progress issued Aug 2026 | 627 Santiago St | 1) relocate (e) kitchen, remodel (e) one bathroom. add one new full bath room. re-built interior staircase and replace (e) sheet rock w/new at 2nd flr. 2) contruct two bedroom. family room and two full bathroom at ground flr.Details
1) relocate (e) kitchen, remodel (e) one bathroom. add one new full bath room. re-built interior staircase and replace (e) sheet rock w/new at 2nd flr. 2) contruct two bedroom. family room and two full bathroom at ground flr. | $383,000 |
| Aug 7, 2026 | In progress issued Aug 2026 | 25 Claremont Bl | revision to pa#202604159529: remove 3 (e) windows, in fill opening, match to (e) exterior wall @ 2nd fl. voluntary strutural upgrades to gravity & lateral seismic resisting elements. to comply with nov 202658023Details
revision to pa#202604159529: remove 3 (e) windows, in fill opening, match to (e) exterior wall @ 2nd fl. voluntary strutural upgrades to gravity & lateral seismic resisting elements. to comply with nov 202658023 | $80,000 |
| Jul 20, 2026 | In progress issued Jul 2026 | 2442 41st Av | construct 1 bedroom, 1 full bath, remodel (e) kitchen, bathroom & rebuilt interior staircase at 2/f. construct 1 bedroom, 1 full bath, family room, powder room, & install wetbar at g/f.Details
construct 1 bedroom, 1 full bath, remodel (e) kitchen, bathroom & rebuilt interior staircase at 2/f. construct 1 bedroom, 1 full bath, family room, powder room, & install wetbar at g/f. | $385,000 |
| Apr 15, 2026 | In progress issued Apr 2026 | 25 Claremont Bl | remodel (e) kitchen, convert (e) full bathroom to powder room. add 2 new full bath, repair (e) interior staircase in-kind & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 2 full bath , family room, & install wet bar at g/f.Details
remodel (e) kitchen, convert (e) full bathroom to powder room. add 2 new full bath, repair (e) interior staircase in-kind & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 2 full bath , family room, & install wet bar at g/f. | $312,000 |