Back to kitchen remodel contractors
Arcline Development Inc
- Based in
- Millbrae
- On San Francisco permits
- Apr 2026 to Aug 2026
- Last 24 months
- 7 permits filed
7 permits since 2000: 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 in progress. Typically 12 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Sep 2026 | 1467 23rd Av | remodel (e) kitchen, bathroom, add new full bathroom and replace (e) sheet-rock w new at 2nd floor. construct 2 bed room, 2 full bath room, family room, and install wet bar at ground floor including in fill one bedroom. infill (e) light wellDetails
remodel (e) kitchen, bathroom, add new full bathroom and replace (e) sheet-rock w new at 2nd floor. construct 2 bed room, 2 full bath room, family room, and install wet bar at ground floor including in fill one bedroom. infill (e) light well | $420,080 |
| Aug 14, 2026 | In progress issued Aug 2026 | 627 Santiago St | 1) relocate (e) kitchen, remodel (e) one bathroom. add one new full bath room. re-built interior staircase and replace (e) sheet rock w/new at 2nd flr. 2) contruct two bedroom. family room and two full bathroom at ground flr.Details
1) relocate (e) kitchen, remodel (e) one bathroom. add one new full bath room. re-built interior staircase and replace (e) sheet rock w/new at 2nd flr. 2) contruct two bedroom. family room and two full bathroom at ground flr. | $383,000 |
| Jul 20, 2026 | In progress issued Jul 2026 | 2442 41st Av | construct 1 bedroom, 1 full bath, remodel (e) kitchen, bathroom & rebuilt interior staircase at 2/f. construct 1 bedroom, 1 full bath, family room, powder room, & install wetbar at g/f.Details
construct 1 bedroom, 1 full bath, remodel (e) kitchen, bathroom & rebuilt interior staircase at 2/f. construct 1 bedroom, 1 full bath, family room, powder room, & install wetbar at g/f. | $385,000 |
| Apr 15, 2026 | In progress issued Apr 2026 | 25 Claremont Bl | remodel (e) kitchen, convert (e) full bathroom to powder room. add 2 new full bath, repair (e) interior staircase in-kind & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 2 full bath , family room, & install wet bar at g/f.Details
remodel (e) kitchen, convert (e) full bathroom to powder room. add 2 new full bath, repair (e) interior staircase in-kind & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 2 full bath , family room, & install wet bar at g/f. | $312,000 |