Synerforce Construction
- Based in
- Union City
- On San Francisco permits
- Apr 2015 to Dec 2025
- Last 24 months
- 1 permit filed
94 permits since 2000: 84 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2025 | Completed final sign-off Mar 2026 | 1700 19th Av | revision to 202106041737 to omit new door at storage room. relocated laundry to e utility room.Details
revision to 202106041737 to omit new door at storage room. relocated laundry to e utility room. | |
| Jun 7, 2024 | Completed final sign-off Jun 2024 | 473 Andover St | to comply with nov #202422359 repair siding on left siding of building install ventilation cover at garage door install new entry doorDetails
to comply with nov #202422359 repair siding on left siding of building install ventilation cover at garage door install new entry door | $1,200 |
| May 22, 2024 | Expired or cancelled withdrawn Oct 2024 | 1700 19th Av | 09/19/2024 withdrawal approved by david jones 09/26/2024 ces violation pending approval sent to joe cheng for approval s.c revision to pa# 202305157754 to comply with nov 201992411 relocate shearwallDetails
09/19/2024 withdrawal approved by david jones 09/26/2024 ces violation pending approval sent to joe cheng for approval s.c revision to pa# 202305157754 to comply with nov 201992411 relocate shearwall | |
| Feb 29, 2024 | Completed final sign-off Mar 2024 | 3100 Taraval St | revision to pa# 202206035535: to document new shearwall location.Details
revision to pa# 202206035535: to document new shearwall location. | |
| May 15, 2023 | Completed final sign-off Nov 2024 | 1700 19th Av | soft story retrofit per sfebc chapter 4 engineering criteria 2022 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4 engineering criteria 2022 cebc appendix a-4 | $50,000 |
| Jun 3, 2022 | Completed final sign-off Jul 2022 | 1216 Clay St | revision to 202003025912. revise plan where (e) concrete foundation occursDetails
revision to 202003025912. revise plan where (e) concrete foundation occurs | |
| Jun 3, 2022 | Completed final sign-off Mar 2024 | 3100 Taraval St | soft story retrofit per sfebc chapter 4d in accordance w/ 2016 cebc appendix a4. "refer to adu permit 202002114136Details
soft story retrofit per sfebc chapter 4d in accordance w/ 2016 cebc appendix a4. "refer to adu permit 202002114136 | $52,000 |
| Jun 4, 2021 | Completed final sign-off Mar 2026 | 1700 19th Av | add (1) new dwelling unit at the ground floor of existing 8 unnit apramtnet building per governement code section 65852. remove 1 garage door and convert 1 car garage into laundry and storage.Details
add (1) new dwelling unit at the ground floor of existing 8 unnit apramtnet building per governement code section 65852. remove 1 garage door and convert 1 car garage into laundry and storage. | $60,000 |
| Jul 19, 2020 | Never finaled issued Aug 2020, no final | 436 Tehama St | apartment 436-a: build new wall in living room area to create new home officeDetails
apartment 436-a: build new wall in living room area to create new home office | $2,000 |
| Mar 2, 2020 | Completed final sign-off Jul 2022 | 1216 Clay St | soft story retrofit per sfebc ch 4d in accordance with 2019 cebc appendix a4Details
soft story retrofit per sfebc ch 4d in accordance with 2019 cebc appendix a4 | $90,000 |
| Feb 21, 2020 | Completed final sign-off Jun 2021 | 2216 Clay St | 1)revision to work currently underway per permit #201809109536 r1. replace extg forced air heating system in unit 1 with new radiant heat system. new system will serve all unit 1 conditioned space in basement and floor 1.Details
1)revision to work currently underway per permit #201809109536 r1. replace extg forced air heating system in unit 1 with new radiant heat system. new system will serve all unit 1 conditioned space in basement and floor 1. | $10,000 |
| Feb 11, 2020 | Completed final sign-off Apr 2026 | 3100 Taraval St | add (3) new dwelling units at ground flr of (e) 6-unit appartment building per ord# 162-16.Details
add (3) new dwelling units at ground flr of (e) 6-unit appartment building per ord# 162-16. | $100,000 |
| Nov 8, 2019 | Completed final sign-off Sep 2020 | 262 22nd Av | revision to pa#2015-0804-3325: relocate moment frame at g.lb" (8'-0"). add new moment frame by main entry. the rest of the project remains as approvedDetails
revision to pa#2015-0804-3325: relocate moment frame at g.lb" (8'-0"). add new moment frame by main entry. the rest of the project remains as approved | $10,000 |
| Aug 8, 2019 | Completed final sign-off Nov 2019 | 601 Masonic Av | revision to soft story perm it 201709158424. replace moment frame with strong wall. shear wall and collector changes. increase 28 day concrete strength to 4000 psiDetails
revision to soft story perm it 201709158424. replace moment frame with strong wall. shear wall and collector changes. increase 28 day concrete strength to 4000 psi | |
| Aug 8, 2019 | Completed final sign-off Dec 2019 | 1234 Francisco St | revision to soft story 20170324206. replace moment frame at rear of buidling with strong walls and new strucutral detailsDetails
revision to soft story 20170324206. replace moment frame at rear of buidling with strong walls and new strucutral details | |
| Aug 1, 2019 | Completed final sign-off Jun 2020 | 326 21st Av | voluntary seismic retrofit of ground flr per ab-94 in compliance w/ sfbc chapter 4d & cebc appendix a4 foundation replacement. repair / replace in-kind water dry rot damaged structural wall and flr members at front stair/deck. remove beam & posts in garage & install (n) ceiling flr frame over garageDetails
voluntary seismic retrofit of ground flr per ab-94 in compliance w/ sfbc chapter 4d & cebc appendix a4 foundation replacement. repair / replace in-kind water dry rot damaged structural wall and flr members at front stair/deck. remove beam & posts in garage & install (n) ceiling flr frame over garage | $60,000 |
| Aug 1, 2019 | Completed final sign-off Sep 2019 | 1552 Green St | revision to pa 201810042288. structural revisionsDetails
revision to pa 201810042288. structural revisions | |
| Jul 17, 2019 | Completed final sign-off Jun 2021 | 2216 Clay St | apt 1:rev to pa201809109536,r1:furr floor at storage 1 & portion of media rm & mstr closet to match adj 1/f elev; remove door at master clos,infill with (n) ext wall to match adj;(n) furred wall & curb around fireplace masses;Details
apt 1:rev to pa201809109536,r1:furr floor at storage 1 & portion of media rm & mstr closet to match adj 1/f elev; remove door at master clos,infill with (n) ext wall to match adj;(n) furred wall & curb around fireplace masses; | $10,000 |
| Apr 11, 2019 | Completed final sign-off Jun 2019 | 4071 19th Av | revision to pa 201706018088 soft -story retrofit. eliminate moment frame at front of building and add strong walls.Details
revision to pa 201706018088 soft -story retrofit. eliminate moment frame at front of building and add strong walls. | |
| Apr 11, 2019 | Never finaled issued Sep 2019, no final | 1701 Polk St | revision to pa 201612165180. update ada entrances.Details
revision to pa 201612165180. update ada entrances. | |
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 261 27th Av | as-built documentation for pa 201709056853.Details
as-built documentation for pa 201709056853. | |
| Jan 10, 2019 | Completed final sign-off Mar 2019 | 1949 Green St | revision to pa 2017-0911-7590 (soft story), overwrite sheet s4 in original permit set. reconfigure strong walls, footing and add new concrete wall at rear of buildingDetails
revision to pa 2017-0911-7590 (soft story), overwrite sheet s4 in original permit set. reconfigure strong walls, footing and add new concrete wall at rear of building | $3,000 |
| Nov 9, 2018 | Completed final sign-off Jan 2019 | 50 Crestline Dr | revise moment frame location and other minor changes to structural revisions to soft story permit #201709056866Details
revise moment frame location and other minor changes to structural revisions to soft story permit #201709056866 | |
| Oct 4, 2018 | Completed final sign-off Sep 2019 | 1552 Green St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $80,000 |
| Sep 14, 2018 | Completed final sign-off Jan 2021 | 1905 Irving St | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809140367.Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809140367. | $60,000 |
| Sep 14, 2018 | Completed final sign-off Jan 2021 | 1905 Irving St | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201809140366.Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201809140366. | $30,000 |
| Sep 10, 2018 | Completed final sign-off Jun 2021 | 2216 Clay St | remodel (e) floor 1 unit, new kitchen & bathrooms. lower basement slab. construct 973 sf of new conditions space in basement (sprinklers modified under sep permit)Details
remodel (e) floor 1 unit, new kitchen & bathrooms. lower basement slab. construct 973 sf of new conditions space in basement (sprinklers modified under sep permit) | $150,000 |
| Aug 3, 2018 | Completed final sign-off Jan 2020 | 1920 Pine St | to comply with nov 201715115: soft story retrofit per sfebc chapter 4d in accordace with 2016 cebc appendix a-4.Details
to comply with nov 201715115: soft story retrofit per sfebc chapter 4d in accordace with 2016 cebc appendix a-4. | $75,000 |
| Aug 3, 2018 | Completed final sign-off Nov 2018 | 6600 Fulton St | rev to pa#201708104431; modification to shear walls and foundations. replace steel moment frame with simpson strong wallsDetails
rev to pa#201708104431; modification to shear walls and foundations. replace steel moment frame with simpson strong walls | |
| Jul 12, 2018 | Completed final sign-off Sep 2018 | 1139 Broadway | first floor soft story retrofit sfbc 34b, 2016 iebc appendix a-4 document as built ref pa 2017-0905-6861Details
first floor soft story retrofit sfbc 34b, 2016 iebc appendix a-4 document as built ref pa 2017-0905-6861 | |
| Jun 29, 2018 | Expired or cancelled cancelled Apr 2023 | 1700 19th Av | seismic retrofit. complyt with sfbc chapter 34b, soft story retrofit per sfebc chapeter 4d engineering critira on 2016 app a4Details
seismic retrofit. complyt with sfbc chapter 34b, soft story retrofit per sfebc chapeter 4d engineering critira on 2016 app a4 | $60,000 |
| Apr 20, 2018 | Completed final sign-off Jun 2019 | 1513 Taylor St | soft story retrofit per sfbc chapter 4d in occordance with 2016 cebc appendix a4Details
soft story retrofit per sfbc chapter 4d in occordance with 2016 cebc appendix a4 | $40,000 |
| Mar 7, 2018 | Completed final sign-off Aug 2018 | 644 Green St | revision to 201509284836 & 201705247542 complete redesign of soft story retrofit per sfebc ( chapter 4d) in accordance with 2016 cebc appx a4Details
revision to 201509284836 & 201705247542 complete redesign of soft story retrofit per sfebc ( chapter 4d) in accordance with 2016 cebc appx a4 | |
| Feb 9, 2018 | Completed final sign-off Mar 2018 | 1580 Jackson St | revision to orig permit 201611042070 to document as built condition prior to building finalDetails
revision to orig permit 201611042070 to document as built condition prior to building final | |
| Jan 24, 2018 | Completed final sign-off Feb 2018 | 2810 Gough St | revision to app#201605026265. revise shearwalls at east wall of garage. soft storyDetails
revision to app#201605026265. revise shearwalls at east wall of garage. soft story | |
| Nov 17, 2017 | Expired or cancelled cancelled Jun 2022 | 3100 Taraval St | soft story retrofit per sfebc chapter 4d engineering criteria on 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria on 2016 cebc appendix a-4. | $50,000 |
| Oct 18, 2017 | Completed final sign-off Mar 2018 | 2265 Lombard St | revision to 201606230742, soft story retrofit to include as built condition updateDetails
revision to 201606230742, soft story retrofit to include as built condition update | |
| Oct 18, 2017 | Never finaled issued Oct 2017, no final | 1630 Sutter St | revision to 201609208303, update plan per as build condition, relocate smf, verify e ceiling plywood diaph. n/a for maher.Details
revision to 201609208303, update plan per as build condition, relocate smf, verify e ceiling plywood diaph. n/a for maher. | |
| Sep 19, 2017 | Completed final sign-off Sep 2019 | 24 Perego Tr | soft story retrofit per sfebc chapter 4d, fema p-807Details
soft story retrofit per sfebc chapter 4d, fema p-807 | $30,000 |
| Sep 15, 2017 | Completed final sign-off Aug 2020 | 2216 Clay St | soft story retrofit of basemeht floor meeting 2012 and 2015 iebc appendix 4 per 2016 sfebc ch 4dDetails
soft story retrofit of basemeht floor meeting 2012 and 2015 iebc appendix 4 per 2016 sfebc ch 4d | $150,000 |
| Sep 15, 2017 | Completed final sign-off Nov 2019 | 601 Masonic Av | apartments: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4Details
apartments: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | |
| Sep 15, 2017 | Completed final sign-off Nov 2019 | 601 Masonic Av | retail/restaurant: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4Details
retail/restaurant: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $78,000 |
| Sep 15, 2017 | Completed final sign-off Jan 2024 | 3241 23rd St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4 | $70,000 |
| Sep 11, 2017 | Completed final sign-off Aug 2019 | 3603 Sacramento St | commercial: soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4Details
commercial: soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4 | $30,000 |
| Sep 11, 2017 | Completed final sign-off Mar 2019 | 1949 Green St | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.maher n/a.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.maher n/a. | $40,000 |
| Sep 11, 2017 | Completed final sign-off Jul 2019 | 97 Lafayette St | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4 maher not reqDetails
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4 maher not req | $50,000 |
| Sep 11, 2017 | Completed final sign-off Mar 2024 | 4645 Balboa St | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4 | $90,000 |
| Sep 11, 2017 | Completed final sign-off Apr 2019 | 2 Diamond St | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4 | $60,000 |
| Sep 11, 2017 | Completed final sign-off Mar 2021 | 32 Rausch St | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4 | $80,000 |
| Sep 11, 2017 | Completed final sign-off Dec 2019 | 543 Natoma St | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4 | $80,000 |
| Sep 11, 2017 | Completed final sign-off Aug 2019 | 3603 Sacramento St | residential: soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4Details
residential: soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4 | $60,000 |
| Sep 11, 2017 | Completed final sign-off Dec 2019 | 695 09th Av | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4 | $80,000 |
| Sep 5, 2017 | Completed final sign-off Jul 2019 | 261 27th Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $80,000 |
| Sep 5, 2017 | Completed final sign-off Sep 2018 | 1139 Broadway | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $80,000 |
| Sep 5, 2017 | Completed final sign-off Jan 2019 | 50 Crestline Dr | soft story seismic retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. note: work being performed on 1st and 2nd floors. in addition, work being performed on below grade level 1,2,3,4.Details
soft story seismic retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. note: work being performed on 1st and 2nd floors. in addition, work being performed on below grade level 1,2,3,4. | $100,000 |
| Aug 31, 2017 | Completed final sign-off Sep 2018 | 227 Randolph St | comply with complaint #201794301 ord.162-16-adu of dwelling unit installed without permit. to legalize existing kitchen, all work at ground floor. provide second exit for second floor.Details
comply with complaint #201794301 ord.162-16-adu of dwelling unit installed without permit. to legalize existing kitchen, all work at ground floor. provide second exit for second floor. | $20,000 |
| Aug 24, 2017 | Expired or cancelled expired Sep 2023 | 1908 Fillmore St | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. (residential)Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. (residential) | $60,000 |
| Aug 24, 2017 | Expired or cancelled expired Sep 2023 | 1908 Fillmore St | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. (commercial)Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. (commercial) | $60,000 |
| Aug 10, 2017 | Completed final sign-off Aug 2018 | 1620 Jones St | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appedix a4.Details
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appedix a4. | $50,000 |
| Aug 10, 2017 | Completed final sign-off Aug 2018 | 83 Fair Oaks St | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appedix a4.Details
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appedix a4. | $30,000 |
| Aug 10, 2017 | Completed final sign-off Jan 2020 | 1149 Jackson St | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appedix a4.Details
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appedix a4. | $80,000 |
| Aug 10, 2017 | Completed final sign-off Nov 2018 | 6600 Fulton St | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appedix a4.Details
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appedix a4. | $60,000 |
| Jul 20, 2017 | Completed final sign-off Apr 2019 | 1181 Guerrero St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $60,000 |
| Jul 20, 2017 | Completed final sign-off Sep 2019 | 144 Scott St | ground floor unit - kitchen & bathroom remodel. perform voluntary steismic upgrade in gr fl per ab094 in convormance with sfebc ch 4d in accordance in 2016 cebc app a4Details
ground floor unit - kitchen & bathroom remodel. perform voluntary steismic upgrade in gr fl per ab094 in convormance with sfebc ch 4d in accordance in 2016 cebc app a4 | $25,000 |
| Jul 20, 2017 | Completed final sign-off Oct 2019 | 3536 23rd St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $80,000 |
| Jul 20, 2017 | Completed final sign-off Aug 2018 | 567 24th Av | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $80,000 |
| Jul 14, 2017 | Completed final sign-off Jan 2019 | 1158 Page St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maherDetails
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maher | $60,000 |
| Jun 7, 2017 | Completed final sign-off Jan 2019 | 90 Terra Vista Av | soft story retrofit per sfebc chapter 4d in accordance with cebc 2016 a-4.Details
soft story retrofit per sfebc chapter 4d in accordance with cebc 2016 a-4. | $120,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2018 | 571 24th Av | soft story retrofit per sfbc chapter 34b in accordance with 2016 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b in accordance with 2016 iebc appendix a-4. | $100,000 |
| Jun 1, 2017 | Completed final sign-off Apr 2018 | 1750 Sutter St | at (e) 3-story bldg w/ (e) footprint: repair the damaged (e) deck in unit #305 - remove all (e) deck & guardrails. replace any decayed sheating & framing members. install all (n) rim joists & blocking. no change-same location & same size.Details
at (e) 3-story bldg w/ (e) footprint: repair the damaged (e) deck in unit #305 - remove all (e) deck & guardrails. replace any decayed sheating & framing members. install all (n) rim joists & blocking. no change-same location & same size. | $4,500 |
| Jun 1, 2017 | Completed final sign-off Aug 2018 | 370 18th Av | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4. | $100,000 |
| Jun 1, 2017 | Completed final sign-off Jul 2019 | 1630 Sacramento St | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4. | $70,000 |
| May 25, 2017 | Completed final sign-off Apr 2018 | 59 Landers St | soft story retrofit per sfbc chap 4d. 2012 iebc app a-4.Details
soft story retrofit per sfbc chap 4d. 2012 iebc app a-4. | $80,000 |
| Apr 5, 2017 | Completed final sign-off Apr 2018 | 673 Oak St | 1st floor: soft story retrofit per 2012 iebc appendix a-4 n/a for maherDetails
1st floor: soft story retrofit per 2012 iebc appendix a-4 n/a for maher | $100,000 |
| Mar 27, 2017 | Completed final sign-off Apr 2018 | 1608 Larkin St | soft story seismic retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story seismic retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $20,000 |
| Jan 23, 2017 | Completed final sign-off Jul 2017 | 227 Randolph St | legalize two bedrooms, construct one full bathroom & laundry. all work at ground floor.Details
legalize two bedrooms, construct one full bathroom & laundry. all work at ground floor. | $48,000 |
| Dec 21, 2016 | Completed final sign-off Apr 2017 | 853 Lombard St | 2nd flr: existing kitchen remodeling, replace cabinets, counter & fixtures, re-wire elect. lighting in kitchen area, all work at second floor.Details
2nd flr: existing kitchen remodeling, replace cabinets, counter & fixtures, re-wire elect. lighting in kitchen area, all work at second floor. | $12,000 |
| Dec 16, 2016 | Never finaled issued Feb 2018, no final | 1701 Polk St | ref pa:201609208296: soft stroy upgrade: update (e) bathroom to ada at (e) retail/storage space. total bldg floor area (15,750 sq. ft.) commercial portion.Details
ref pa:201609208296: soft stroy upgrade: update (e) bathroom to ada at (e) retail/storage space. total bldg floor area (15,750 sq. ft.) commercial portion. | $24,000 |
| Dec 8, 2016 | Completed final sign-off Jan 2019 | 434 24th Av | 1st floor: soft story retrofit per sfbc chapter 34 per 2012 iebc appendix a-4Details
1st floor: soft story retrofit per sfbc chapter 34 per 2012 iebc appendix a-4 | $80,000 |
| Nov 4, 2016 | Completed final sign-off Mar 2018 | 1580 Jackson St | to comply with nov #201641858: soft story retrofit per chapter 34b, 2012 iebc appendix a-4Details
to comply with nov #201641858: soft story retrofit per chapter 34b, 2012 iebc appendix a-4 | $80,000 |
| Oct 25, 2016 | Completed final sign-off Nov 2017 | 125 Guerrero St | soft story retrofit 2012 iebc appendix a-4Details
soft story retrofit 2012 iebc appendix a-4 | $70,000 |
| Sep 20, 2016 | Completed final sign-off May 2018 | 7100 Geary Bl | soft story retrofit sfbc 34b, 2012 iebc app a4 rational designDetails
soft story retrofit sfbc 34b, 2012 iebc app a4 rational design | $100,000 |
| Sep 20, 2016 | Completed final sign-off Jan 2019 | 1701 Polk St | soft story retrofit sfbc 34b, 2012 iebc app a4 rational design. ref#2016-1216-5180. total buulding floor area 15,750 sq. ft. residential portion.Details
soft story retrofit sfbc 34b, 2012 iebc app a4 rational design. ref#2016-1216-5180. total buulding floor area 15,750 sq. ft. residential portion. | $95,040 |
| Sep 20, 2016 | Completed final sign-off Jan 2018 | 1630 Sutter St | soft story retrofit per sfbc chapter 34b : 2012 iebc appendix a-4 and rational designDetails
soft story retrofit per sfbc chapter 34b : 2012 iebc appendix a-4 and rational design | $120,000 |
| Aug 30, 2016 | Completed final sign-off Mar 2018 | 4725 Irving St | soft story retrofit of (e) 3-story bldg in compliance w/mandatory ordinance per sfbc chapter 34b, 2012 iebc apendix a-4Details
soft story retrofit of (e) 3-story bldg in compliance w/mandatory ordinance per sfbc chapter 34b, 2012 iebc apendix a-4 | $70,000 |
| Jul 1, 2016 | Completed final sign-off Jan 2017 | 46 Alvarado St | ground fl soft story retrofit. sfbc 34 b 2012 iebc app a4 rational designDetails
ground fl soft story retrofit. sfbc 34 b 2012 iebc app a4 rational design | $70,000 |
| Jun 23, 2016 | Completed final sign-off Mar 2018 | 2265 Lombard St | soft story seismic retrofit per sfbc 34b, rational design per 2012 iebs appendix a4; maher n/aDetails
soft story seismic retrofit per sfbc 34b, rational design per 2012 iebs appendix a4; maher n/a | $100,000 |
| Jan 13, 2016 | Completed final sign-off Jul 2017 | 957 Fell St | seismic retrofit of soft story comply with sfbc 34b mandatory seismic retrofit iebc a4Details
seismic retrofit of soft story comply with sfbc 34b mandatory seismic retrofit iebc a4 | $65,000 |
| Oct 7, 2015 | Completed final sign-off Jan 2017 | 720 Ashbury St | soft story retrofitDetails
soft story retrofit | $30,000 |
| Aug 4, 2015 | Completed final sign-off Sep 2020 | 262 22nd Av | wood frame soft story program, seismic retrofit of 1st floor as per 2012 iebc appendix a-4Details
wood frame soft story program, seismic retrofit of 1st floor as per 2012 iebc appendix a-4 | $50,000 |
| Aug 4, 2015 | Completed final sign-off Sep 2020 | 361 12th Av | wood frame soft story retrofit per sfbc chapter 34b, seismic retrofit of 1st floor as per 2012 iebc appendix a-4Details
wood frame soft story retrofit per sfbc chapter 34b, seismic retrofit of 1st floor as per 2012 iebc appendix a-4 | $50,000 |
| Jul 10, 2015 | Completed final sign-off Jan 2017 | 1395 Masonic Av | compliance with chapter 34b of the sf bldg code for the soft story seismic retrofit program: other rational designDetails
compliance with chapter 34b of the sf bldg code for the soft story seismic retrofit program: other rational design | $55,000 |
| Jun 5, 2015 | Completed final sign-off Aug 2017 | 617 Arguello Bl | soft story seismic retrofit ground level only. other rational design. soft story ord ab-098Details
soft story seismic retrofit ground level only. other rational design. soft story ord ab-098 | $26,000 |
| Apr 22, 2015 | Completed final sign-off Jan 2020 | 820 Stanyan St | mandatory soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 of iebc.Details
mandatory soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 of iebc. | $30,000 |