Synerforce Construction
- Based in
- Union City
- On San Francisco permits
- Apr 2015 to Dec 2025
- Last 24 months
- 1 permit filed
94 permits since 2000: 84 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 25 days from filing to permit and 304 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 1, 2019 | Completed final sign-off Jun 2020 | 326 21st Av | voluntary seismic retrofit of ground flr per ab-94 in compliance w/ sfbc chapter 4d & cebc appendix a4 foundation replacement. repair / replace in-kind water dry rot damaged structural wall and flr members at front stair/deck. remove beam & posts in garage & install (n) ceiling flr frame over garageDetails
voluntary seismic retrofit of ground flr per ab-94 in compliance w/ sfbc chapter 4d & cebc appendix a4 foundation replacement. repair / replace in-kind water dry rot damaged structural wall and flr members at front stair/deck. remove beam & posts in garage & install (n) ceiling flr frame over garage | $60,000 |