Back to kitchen remodel contractors
Synerforce Construction
- Based in
- Union City
- On San Francisco permits
- Apr 2015 to Dec 2025
- Last 24 months
- 1 permit filed
94 permits since 2000: 84 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 230 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2018 | Completed final sign-off Jun 2021 | 2216 Clay St | remodel (e) floor 1 unit, new kitchen & bathrooms. lower basement slab. construct 973 sf of new conditions space in basement (sprinklers modified under sep permit)Details
remodel (e) floor 1 unit, new kitchen & bathrooms. lower basement slab. construct 973 sf of new conditions space in basement (sprinklers modified under sep permit) | $150,000 |
| Aug 31, 2017 | Completed final sign-off Sep 2018 | 227 Randolph St | comply with complaint #201794301 ord.162-16-adu of dwelling unit installed without permit. to legalize existing kitchen, all work at ground floor. provide second exit for second floor.Details
comply with complaint #201794301 ord.162-16-adu of dwelling unit installed without permit. to legalize existing kitchen, all work at ground floor. provide second exit for second floor. | $20,000 |
| Jul 20, 2017 | Completed final sign-off Sep 2019 | 144 Scott St | ground floor unit - kitchen & bathroom remodel. perform voluntary steismic upgrade in gr fl per ab094 in convormance with sfebc ch 4d in accordance in 2016 cebc app a4Details
ground floor unit - kitchen & bathroom remodel. perform voluntary steismic upgrade in gr fl per ab094 in convormance with sfebc ch 4d in accordance in 2016 cebc app a4 | $25,000 |
| Dec 21, 2016 | Completed final sign-off Apr 2017 | 853 Lombard St | 2nd flr: existing kitchen remodeling, replace cabinets, counter & fixtures, re-wire elect. lighting in kitchen area, all work at second floor.Details
2nd flr: existing kitchen remodeling, replace cabinets, counter & fixtures, re-wire elect. lighting in kitchen area, all work at second floor. | $12,000 |