Block 0614, lot 006
2216 Clay St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 5
- Rooms
- 5 bathrooms
- Building
- 6,223 sq ft
- Lot
- 5,491 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 20, 2024 | Completed final sign-off Feb 2025 | 2216 Clay St | Sean Rattigan Construction | remove & replace in kind (e) exterior on grade stair at the front yardDetails
remove & replace in kind (e) exterior on grade stair at the front yard | $38,000 |
| May 17, 2023 | Completed final sign-off Aug 2023 | 2216 Clay St | Sean Rattigan Construction | to comply with nov 202303892 - construct a new retaining wall & fence along rear property lineDetails
to comply with nov 202303892 - construct a new retaining wall & fence along rear property line | $6,000 |
| Mar 11, 2021 | Completed final sign-off May 2021 | 2216 Clay St | Byington Electric Corp | new conventional fire alarm panel. new wireless "rf" radio communicator will be installed for central monitoring station. new low-frequency "lf" horns will be added to the interior residential units. all other existing devices shall remain i.e. smoke detectors, pull stations, water flow/tamper swi..Details
new conventional fire alarm panel. new wireless "rf" radio communicator will be installed for central monitoring station. new low-frequency "lf" horns will be added to the interior residential units. all other existing devices shall remain i.e. smoke detectors, pull stations, water flow/tamper swi.. | $15,000 |
| Feb 21, 2020 | Completed final sign-off Jun 2021 | 2216 Clay St | Synerforce Construction | 1)revision to work currently underway per permit #201809109536 r1. replace extg forced air heating system in unit 1 with new radiant heat system. new system will serve all unit 1 conditioned space in basement and floor 1.Details
1)revision to work currently underway per permit #201809109536 r1. replace extg forced air heating system in unit 1 with new radiant heat system. new system will serve all unit 1 conditioned space in basement and floor 1. | $10,000 |
| Oct 22, 2019 | Never finaled issued Oct 2019, no final | 2216 Clay St | street spaceDetails
street space | ||
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 2216 Clay St | Lh Plumbing | revision to pa 2019-0923-2417. new fire sprinkler plan doesn't incude new installation for 1st floor, unit 1. building plan only required fire sprinkler system for the basement. ref pa 2018-0910-9536Details
revision to pa 2019-0923-2417. new fire sprinkler plan doesn't incude new installation for 1st floor, unit 1. building plan only required fire sprinkler system for the basement. ref pa 2018-0910-9536 | |
| Sep 23, 2019 | Never finaled issued Oct 2019, no final | 2216 Clay St | Lh Plumbing | unit # 1: install fire sprinkler contractor for unit 1 of 2216 clay st. ref # 201809109536Details
unit # 1: install fire sprinkler contractor for unit 1 of 2216 clay st. ref # 201809109536 | $18,000 |
| Jul 17, 2019 | Completed final sign-off Jun 2021 | 2216 Clay St | Synerforce Construction | apt 1:rev to pa201809109536,r1:furr floor at storage 1 & portion of media rm & mstr closet to match adj 1/f elev; remove door at master clos,infill with (n) ext wall to match adj;(n) furred wall & curb around fireplace masses;Details
apt 1:rev to pa201809109536,r1:furr floor at storage 1 & portion of media rm & mstr closet to match adj 1/f elev; remove door at master clos,infill with (n) ext wall to match adj;(n) furred wall & curb around fireplace masses; | $10,000 |
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 2216 Clay St | street spaceDetails
street space | ||
| Nov 9, 2018 | Never finaled issued Nov 2018, no final | 2216 Clay St | street space onlyDetails
street space only | ||
| Sep 10, 2018 | Completed final sign-off Jun 2021 | 2216 Clay St | Synerforce Construction | remodel (e) floor 1 unit, new kitchen & bathrooms. lower basement slab. construct 973 sf of new conditions space in basement (sprinklers modified under sep permit)Details
remodel (e) floor 1 unit, new kitchen & bathrooms. lower basement slab. construct 973 sf of new conditions space in basement (sprinklers modified under sep permit) | $150,000 |
| Sep 15, 2017 | Completed final sign-off Aug 2020 | 2216 Clay St | Synerforce Construction | soft story retrofit of basemeht floor meeting 2012 and 2015 iebc appendix 4 per 2016 sfebc ch 4dDetails
soft story retrofit of basemeht floor meeting 2012 and 2015 iebc appendix 4 per 2016 sfebc ch 4d | $150,000 |
| May 10, 2006 | Expired or cancelled expired Jan 2007 | 2216 Clay St | Sure Roofing Systems/R.O.Choy | reroofing.Details
reroofing. | $8,700 |