- Nov 2004 to Aug 2026
166 permits since 2000 (architect on 159 permits, authorized agent-others on 10 permits, designer on 1 permit): 105 completed, 12 in progress, 23 never finaled, 26 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 166.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Aug 2026 | 1935 Webster St | Wei Li Construction | revision to pa 202507030118 rebuild 2nd/3rd floor stair within existing space. bring framing, rise/run dimensions, stair width, guardrail and handrail height up to codeDetails
revision to pa 202507030118 rebuild 2nd/3rd floor stair within existing space. bring framing, rise/run dimensions, stair width, guardrail and handrail height up to code | $15,000 |
| Jul 22, 2026 | In progress filed Jul 2026, not yet issued | 1581 Masonic Av | 1/f: remodel/relocate guest room & bathroom, one new window at rear, not visible from street. 2/f: remodel/relocate kitchen & dining room, revise window layout at rear, not visible from street. 3/f: enclose exterior deck to create new laundry closet.Details
1/f: remodel/relocate guest room & bathroom, one new window at rear, not visible from street. 2/f: remodel/relocate kitchen & dining room, revise window layout at rear, not visible from street. 3/f: enclose exterior deck to create new laundry closet. | $285,000 | |
| Jul 8, 2026 | Completed final sign-off Sep 2026 | 263 Upper Tr | Dcs Plumbing Llc | revision to 202605231820 for in kind no plans. new application shows relocated bathroomo fixtures and 1 removed non bearing wall.Details
revision to 202605231820 for in kind no plans. new application shows relocated bathroomo fixtures and 1 removed non bearing wall. | |
| May 29, 2026 | Completed final sign-off Oct 2026 | 3240 Divisadero St | Dcs Plumbing Llc | rev 202509115104: modify finish of entry landing at s/w.Details
rev 202509115104: modify finish of entry landing at s/w. | |
| Apr 9, 2026 | In progress issued Apr 2026 | 1935 Webster St | Wei Li Construction | revision to pa# 202507030118: revise foundation and 1st floor framing to support (e) bay overhang, lower garage slab, perform minor roof framing upgrades, document the retaining wall along gridline a will remain as-is and not be replaced.Details
revision to pa# 202507030118: revise foundation and 1st floor framing to support (e) bay overhang, lower garage slab, perform minor roof framing upgrades, document the retaining wall along gridline a will remain as-is and not be replaced. | $18,000 |
| Nov 20, 2025 | Completed final sign-off Mar 2026 | 215 Virginia Av | Dcs Plumbing Llc | unit #215: remodel existing bathroom and add new washer and dryer in unit.Details
unit #215: remodel existing bathroom and add new washer and dryer in unit. | $24,000 |
| Oct 23, 2025 | Completed final sign-off Oct 2026 | 3242 Divisadero St | Dcs Plumbing Llc | 3rd fl: remodel (e) kitchen, expand living room closet into stair landing to create an office. remodel hall bathroom, relocate w/d an add new bathroom at bedroom 1.Details
3rd fl: remodel (e) kitchen, expand living room closet into stair landing to create an office. remodel hall bathroom, relocate w/d an add new bathroom at bedroom 1. | $145,000 |
| Oct 23, 2025 | Completed final sign-off Feb 2026 | 474 Mangels Av | Dcs Plumbing Llc | remove and replace tile at front exterior entry stair, repair waterproofing. remove stucco at front facade & replace dry rot wood. widen garage door by 10". new stucco at front facade.Details
remove and replace tile at front exterior entry stair, repair waterproofing. remove stucco at front facade & replace dry rot wood. widen garage door by 10". new stucco at front facade. | $38,000 |
| Sep 11, 2025 | Completed final sign-off Oct 2026 | 3240 Divisadero St | Dcs Plumbing Llc | alter exterior entry stair by removing 2 terrazzo seps and replace with a landing and 2 (n) steps shifted towards street. add carage acess doorway at (n) landing.Details
alter exterior entry stair by removing 2 terrazzo seps and replace with a landing and 2 (n) steps shifted towards street. add carage acess doorway at (n) landing. | $24,000 |
| Aug 28, 2025 | Completed final sign-off Jun 2026 | 1933 Laguna St | Pjd Construction Inc | replace exterior stair "in kind"Details
replace exterior stair "in kind" | $25,000 |
| Jul 10, 2025 | In progress issued Dec 2025 | 1935 Webster St | Wei Li Construction | rear horizontal additions at lvls 1 and 2. interior remodel @ lvls 1, 2 & 3 to include reconfiguring of the floor plan layouts at all levels. (n) rear roof deck at lvl 2. new windows and siding at rear, & replacement of (e) window sashes at front and side facades.Details
rear horizontal additions at lvls 1 and 2. interior remodel @ lvls 1, 2 & 3 to include reconfiguring of the floor plan layouts at all levels. (n) rear roof deck at lvl 2. new windows and siding at rear, & replacement of (e) window sashes at front and side facades. | $750,000 |
| Jun 11, 2025 | Completed final sign-off Mar 2026 | 393 Corbett Av | Kalix Inc Dbalara Construction | unit a: remodel 2.5 bathrooms: 1st/f guest bath in kind. 2nd/f half bath relocation toilet & sink. 3rd/f primary bath reconfigurare plumbing fixturesDetails
unit a: remodel 2.5 bathrooms: 1st/f guest bath in kind. 2nd/f half bath relocation toilet & sink. 3rd/f primary bath reconfigurare plumbing fixtures | $45,000 |
| Apr 11, 2025 | In progress issued Apr 2025 | 110 21st Av | Kalix Inc Dbalara Construction | remove & revise scope of work from pa# 202302141977: no work at front elevation garage door & side walls, interior garage/hallway to remain, elec meters to remain, laundry sink not installed. w/d under stairs, storage closet added & minor revisions in kitchen layout (112b)Details
remove & revise scope of work from pa# 202302141977: no work at front elevation garage door & side walls, interior garage/hallway to remain, elec meters to remain, laundry sink not installed. w/d under stairs, storage closet added & minor revisions in kitchen layout (112b) | |
| Apr 10, 2025 | Completed final sign-off Oct 2026 | 3240 Divisadero St | Dcs Plumbing Llc | 1st/f: remove 2 post & 2 walls to allow for side by side parking, n)structural beams, posts, walls & footing. 2nd/f: remodel e) kitchen & remove bearing wall btw kitchen & dining. remodel bathroom & open up hallway to laundry. no exterior front facade work & no habitable space add. rev 202411084737Details
1st/f: remove 2 post & 2 walls to allow for side by side parking, n)structural beams, posts, walls & footing. 2nd/f: remodel e) kitchen & remove bearing wall btw kitchen & dining. remodel bathroom & open up hallway to laundry. no exterior front facade work & no habitable space add. rev 202411084737 | $78,000 |
| Mar 20, 2025 | Completed final sign-off Jul 2025 | 2687 Mcallister St | West-Tec General Engineering Inc | document and correct rear yard stairs on p. l. previously re-build/replaced beyond scope of permit #201707111590 to comply with nov #201785071. landings posts, stringers treads/risers to be removed and replaced. footings to remain.Details
document and correct rear yard stairs on p. l. previously re-build/replaced beyond scope of permit #201707111590 to comply with nov #201785071. landings posts, stringers treads/risers to be removed and replaced. footings to remain. | $8,000 |
| Feb 3, 2025 | Completed final sign-off Apr 2025 | 3337 Clement St | Dcs Plumbing Llc | install washer/dryerDetails
install washer/dryer | $1,200 |
| Jan 14, 2025 | In progress issued Jan 2025 | 342 Staples Av | Kalix Inc Dbalara Construction | revision to issued permit pa#2024-0104-3443 add foundation along west side of wallDetails
revision to issued permit pa#2024-0104-3443 add foundation along west side of wall | $2,000 |
| Sep 20, 2024 | Completed final sign-off Feb 2025 | 2216 Clay St | Sean Rattigan Construction | remove & replace in kind (e) exterior on grade stair at the front yardDetails
remove & replace in kind (e) exterior on grade stair at the front yard | $38,000 |
| Aug 13, 2024 | Completed final sign-off Aug 2025 | 944 Rivera St | Norwood Construction | revision to pa 2023-0908-6169 enlarge new patio (previously approved) including retaining walls, built in bench and steps up to gradeDetails
revision to pa 2023-0908-6169 enlarge new patio (previously approved) including retaining walls, built in bench and steps up to grade | $3,000 |
| Aug 13, 2024 | Completed final sign-off Oct 2024 | 171 Sussex St | Modern Craft Construction | revision to 202403208258. shift new deck post +/- 5' towards center of deck balconyDetails
revision to 202403208258. shift new deck post +/- 5' towards center of deck balcony | |
| Jul 30, 2024 | In progress issued Nov 2024 | 342 Staples Av | Kalix Inc Dbalara Construction | revision to pa# 202401043443. addition of approx 74sf at 2nd floor to create a new master bedroom, and addition of approx 74sf at 1st floor to create a new bedroom. 2 new rear yard sliding glass doors. new rear yard decks and stairs at 1st and 2nd floors. minor elect and mech work.Details
revision to pa# 202401043443. addition of approx 74sf at 2nd floor to create a new master bedroom, and addition of approx 74sf at 1st floor to create a new bedroom. 2 new rear yard sliding glass doors. new rear yard decks and stairs at 1st and 2nd floors. minor elect and mech work. | $85,000 |
| Jun 12, 2024 | Completed final sign-off Dec 2024 | 1163 Wisconsin St | replace and enlarge rear 2nd story deck and stairs to rear yard.Details
replace and enlarge rear 2nd story deck and stairs to rear yard. | $25,000 | |
| Jun 12, 2024 | In progress issued Jan 2025 | 2838 Greenwich St | Bay Area Builders | replace (e) mailbox at exterior stair wall.Details
replace (e) mailbox at exterior stair wall. | $1,500 |
| Apr 1, 2024 | Completed final sign-off May 2025 | 2838 Greenwich St | Bay Area Builders | remodel for 2 (e) bathrooms for apartment. wall removal.Details
remodel for 2 (e) bathrooms for apartment. wall removal. | $42,000 |
| Apr 1, 2024 | Completed final sign-off Aug 2024 | 123 Villa Tr | Dcs Plumbing Llc | 1st floor remodel of (e) master bathroom and 2nd floor remodel (e) kitchen , laundry and 1/2 bathroomDetails
1st floor remodel of (e) master bathroom and 2nd floor remodel (e) kitchen , laundry and 1/2 bathroom | $65,000 |
| Mar 20, 2024 | Completed final sign-off Oct 2024 | 171 Sussex St | Modern Craft Construction | replace rear facade windows and doors, basement level thru 3rd fl. remove and replace (e) rear yard deck at 2nd & 3rd floors, remove and replace rear facade exterior finishDetails
replace rear facade windows and doors, basement level thru 3rd fl. remove and replace (e) rear yard deck at 2nd & 3rd floors, remove and replace rear facade exterior finish | $65,000 |
| Mar 12, 2024 | Completed final sign-off Nov 2024 | 76 Getz St | Golden State Marble & Granite Inc. | remove stone fire place at 1st floor. replace 1st floor rear facade window and door, remodel 1st floor bath, expand into garage, convert closet to coffee bar. install 1 new side window not visable from street. install skylight at 2nd floor roof over stairs.Details
remove stone fire place at 1st floor. replace 1st floor rear facade window and door, remodel 1st floor bath, expand into garage, convert closet to coffee bar. install 1 new side window not visable from street. install skylight at 2nd floor roof over stairs. | $120,000 |
| Feb 7, 2024 | Completed final sign-off Jul 2025 | 944 Rivera St | Norwood Construction | revision to pa# 202309086169. relocate entry closet, and door to garage at 1st floor. relocate w/d from 2nd floor to 1st floor. rebuild extg stairs.Details
revision to pa# 202309086169. relocate entry closet, and door to garage at 1st floor. relocate w/d from 2nd floor to 1st floor. rebuild extg stairs. | $12,000 |
| Jan 4, 2024 | In progress issued May 2024 | 342 Staples Av | Kalix Inc Dbalara Construction | remodel (e) kitchen, convert mstr bed/bath to (n) family rm & convert (e) bedrm 2 and hall bath to (n) mstr suite. remove (e) stairs & build (n) stairs. convert portion of 1st flr garage to (n) bedrooms (2), baths (1), laundry & hall. (n) mech throught. upgrade elec service & lightning throughout.Details
remodel (e) kitchen, convert mstr bed/bath to (n) family rm & convert (e) bedrm 2 and hall bath to (n) mstr suite. remove (e) stairs & build (n) stairs. convert portion of 1st flr garage to (n) bedrooms (2), baths (1), laundry & hall. (n) mech throught. upgrade elec service & lightning throughout. | $365,000 |
| Dec 13, 2023 | Completed final sign-off Jan 2025 | 134 26th Av | Dcs Plumbing Llc | remodel (e) kitchen and bathroom. renove center line bearing wall at hallway. new skylight. no front facade workDetails
remodel (e) kitchen and bathroom. renove center line bearing wall at hallway. new skylight. no front facade work | $65,000 |
| Oct 18, 2023 | In progress issued Dec 2023 | 480 Douglass St | convert (e) 1st fl into an independent unit by modifying 2nd bath, laundry area to make a kitchen and dining. modify bedroom to create a living rm area, add 40 sf from garage to entry. modify 2nd/3rd fl to create 2nd unti w/new bedrooms at 3rd fl.Details
convert (e) 1st fl into an independent unit by modifying 2nd bath, laundry area to make a kitchen and dining. modify bedroom to create a living rm area, add 40 sf from garage to entry. modify 2nd/3rd fl to create 2nd unti w/new bedrooms at 3rd fl. | $325,000 | |
| Sep 28, 2023 | Never finaled issued Sep 2023, no final | 544 Victoria St | Kalix Inc Dbalara Construction | revision to pa# 202109228968, stack w/d and add a laundry sink, add a wall w/door btwn reading nook and hallway, remove hall closet, waterproof ext., stair, and utility sink at garage, revise deck from tile to wood.Details
revision to pa# 202109228968, stack w/d and add a laundry sink, add a wall w/door btwn reading nook and hallway, remove hall closet, waterproof ext., stair, and utility sink at garage, revise deck from tile to wood. | |
| Sep 11, 2023 | In progress issued Oct 2024 | 1046 Diamond St | Kalix Inc Dbalara Construction | create an adu at basement by converting fmy rm & laundry rm to kitchen & living and expanding into (e) garage 140sf to build sleeping area & closet. reconfigure last 5 steps of (e) stair to provide upper unit access to garage.relocate wh/boiler.(2)(n) windows on clipper. (n) rear deck & stair.Details
create an adu at basement by converting fmy rm & laundry rm to kitchen & living and expanding into (e) garage 140sf to build sleeping area & closet. reconfigure last 5 steps of (e) stair to provide upper unit access to garage.relocate wh/boiler.(2)(n) windows on clipper. (n) rear deck & stair. | $65,000 |
| Sep 8, 2023 | Completed final sign-off Aug 2025 | 944 Rivera St | Norwood Construction | convert (e) 1st fl garage/storage into 2 rooms down, 1 bathrm, engry and 1 car garage; 2nd fl remodel e) bathroom and add 1/2 bath; remodel kitchen and relocated w/d; 2 front windows to be replaced. tunnel entrance to be enclosed. new rear patioDetails
convert (e) 1st fl garage/storage into 2 rooms down, 1 bathrm, engry and 1 car garage; 2nd fl remodel e) bathroom and add 1/2 bath; remodel kitchen and relocated w/d; 2 front windows to be replaced. tunnel entrance to be enclosed. new rear patio | $285,000 |
| Aug 31, 2023 | Never finaled issued Sep 2023, no final | 366 Hill St | remodel exiting laundry area in open hallway to creat a new full bath and enclosed laundry closet @ 1st flr.Details
remodel exiting laundry area in open hallway to creat a new full bath and enclosed laundry closet @ 1st flr. | $45,000 | |
| Jul 6, 2023 | Expired or cancelled cancelled Dec 2024 | 594 Gellert Dr | Kalix Inc Dbalara Construction | replace (e) roof and gutters, vault new roof over dining & entry areas and expand entry approx 6sf at entry porch. replace & repair all interior drywall,trims, casing and electrical wiring. damaged by water infiltration, 2 new windows at side elevation. new entry door w/transome.Details
replace (e) roof and gutters, vault new roof over dining & entry areas and expand entry approx 6sf at entry porch. replace & repair all interior drywall,trims, casing and electrical wiring. damaged by water infiltration, 2 new windows at side elevation. new entry door w/transome. | $85,000 |
| Jun 12, 2023 | Completed final sign-off Oct 2024 | 345 Granada Av | Dcs Plumbing Llc | revision to pa#202207158550. structural clarification sketch on retaining wall.Details
revision to pa#202207158550. structural clarification sketch on retaining wall. | |
| May 10, 2023 | Completed final sign-off Jun 2025 | 415 Shields St | Kalix Inc Dbalara Construction | 1/f: convert (e) garage/storage into new rooms down including one bedroom, one bathroom, a family room and laundry area. relocate water heater, new electrical at remodel area and new heat at 1/f. modify rear yard shed to comply w136(c)(23)Details
1/f: convert (e) garage/storage into new rooms down including one bedroom, one bathroom, a family room and laundry area. relocate water heater, new electrical at remodel area and new heat at 1/f. modify rear yard shed to comply w136(c)(23) | $115,000 |
| May 4, 2023 | Completed final sign-off Jul 2024 | 178 Brewster St | Dcs Plumbing Llc | kitchen remodel, remove/infill (2) side windows not visible from street, remove load bearing walls.Details
kitchen remodel, remove/infill (2) side windows not visible from street, remove load bearing walls. | $45,000 |
| Apr 28, 2023 | Expired or cancelled expired Oct 2024 | 20 Valdez Av | Kalix Inc Dbalara Construction | rev to pa# 202301110035, 202209162611 & 201706098931, reconfigure rooms down, and stairs to garage and increase size of door to rear yard and add sunken patio.Details
rev to pa# 202301110035, 202209162611 & 201706098931, reconfigure rooms down, and stairs to garage and increase size of door to rear yard and add sunken patio. | |
| Apr 18, 2023 | Completed final sign-off Nov 2024 | 1635 Bush St | Wei Li Construction | unit #8: replace 1-living room "greenhouse" window and 1-bedroom window facing fern st. replace 1-bedroom window and 1-sliding glass door facing interior courtyard.Details
unit #8: replace 1-living room "greenhouse" window and 1-bedroom window facing fern st. replace 1-bedroom window and 1-sliding glass door facing interior courtyard. | $35,000 |
| Mar 31, 2023 | Completed final sign-off Dec 2024 | 1635 Bush St | Wei Li Construction | unit 12: replace (1) greenhouse window and 1 bedroom window facing fern st and rpelce 1 window facing interior courtyardDetails
unit 12: replace (1) greenhouse window and 1 bedroom window facing fern st and rpelce 1 window facing interior courtyard | $32,000 |
| Mar 31, 2023 | Completed final sign-off Nov 2024 | 1635 Bush St | Wei Li Construction | unit 1: replace front facdae "green house" window facing bush st. existing 3-sliders to be replaced w/ a fixed middle unit and flanking double casement windows.Details
unit 1: replace front facdae "green house" window facing bush st. existing 3-sliders to be replaced w/ a fixed middle unit and flanking double casement windows. | $25,000 |
| Feb 14, 2023 | Never finaled issued Mar 2023, no final | 110 21st Av | Kalix Inc Dbalara Construction | remodel and expand 1st fl (e) housekeeping unit (112b) modify front elevation garage door & store walls, relolate electric meters, replace (e) front window at 2nd fl. and replace 6 other side/rear windowsDetails
remodel and expand 1st fl (e) housekeeping unit (112b) modify front elevation garage door & store walls, relolate electric meters, replace (e) front window at 2nd fl. and replace 6 other side/rear windows | $85,000 |
| Sep 29, 2022 | Completed final sign-off Aug 2023 | 429 Colon Av | Jason Liu Construction Company | 2/f: remodel kitchen, hall bath and master bath. modify 3 steps at hallway and 4 steps at interior main stair b/t 1/f and 2/f. electrical upgrades at remodel areas. open up wall b/t kitchen and dining room.Details
2/f: remodel kitchen, hall bath and master bath. modify 3 steps at hallway and 4 steps at interior main stair b/t 1/f and 2/f. electrical upgrades at remodel areas. open up wall b/t kitchen and dining room. | $65,000 |
| Sep 16, 2022 | Expired or cancelled expired Oct 2024 | 20 Valdez Av | Kalix Inc Dbalara Construction | revision to bpa#201706098931. revise proposed 2-br/2-bath down to new 3-br/2-bath down, include revisions to side elevation windowsDetails
revision to bpa#201706098931. revise proposed 2-br/2-bath down to new 3-br/2-bath down, include revisions to side elevation windows | $100 |
| Aug 16, 2022 | Completed final sign-off Feb 2023 | 19 Raleigh Av | Burton's Construction | revision to 202207017671 to respond to structural field inspector comments. increase opening in wall between kitchen/dining rmDetails
revision to 202207017671 to respond to structural field inspector comments. increase opening in wall between kitchen/dining rm | $800 |
| Jul 15, 2022 | Completed final sign-off Oct 2024 | 345 Granada Av | Dcs Plumbing Llc | 1st floor excavte and drop f.f. level including modify perimeter foundation, new foundation and s.o.g replace (e) stairs and build rooms down including family room, laundry, bath bedroom,. at 2nd flr, remodel kitchen, bedrooms & bathrooms, bathroom replace all windows, new floors, new elect and newDetails
1st floor excavte and drop f.f. level including modify perimeter foundation, new foundation and s.o.g replace (e) stairs and build rooms down including family room, laundry, bath bedroom,. at 2nd flr, remodel kitchen, bedrooms & bathrooms, bathroom replace all windows, new floors, new elect and new | $425,000 |
| Jul 8, 2022 | Completed final sign-off Apr 2023 | 65 San Rafael Wy | Jason Liu Construction Company | 1st fl: remodel kitchen & breakfast room. open up kitchen to dining room. remove 2 glass block windows & replace 3 other windows. add 1 window. all at side elevation. remodel 1st fl bathroom & 2 2nd fl bathrooms. update electrical lighting & refinish all hardwood floors.Details
1st fl: remodel kitchen & breakfast room. open up kitchen to dining room. remove 2 glass block windows & replace 3 other windows. add 1 window. all at side elevation. remodel 1st fl bathroom & 2 2nd fl bathrooms. update electrical lighting & refinish all hardwood floors. | $164,000 |
| Jul 1, 2022 | Completed final sign-off Aug 2023 | 429 Colon Av | Jason Liu Construction Company | remodel (e) 1st fl bathroom. divide family room space to create a (n) home office area. new lighting/ electrical & remodel areas.Details
remodel (e) 1st fl bathroom. divide family room space to create a (n) home office area. new lighting/ electrical & remodel areas. | $24,000 |
| Jun 21, 2022 | Completed final sign-off Apr 2023 | 1046 Diamond St | Kalix Inc Dbalara Construction | modify (e) 2nd floor master bedroom closet to create a walk in closet. add a w/d closet @ second floor hallway.Details
modify (e) 2nd floor master bedroom closet to create a walk in closet. add a w/d closet @ second floor hallway. | $8,000 |
| Jun 16, 2022 | Completed final sign-off Apr 2023 | 29 Belvedere St | Kalix Inc Dbalara Construction | remodel unit #29, 3rd fl: remodel (e) kitchen. add a shower to bath #1. add a sink to toilet room. add a new en-suite bathroom at bedroom #4. relocate washer/dryer. laundry porch converted into dining area. fahu & wh to be replaced/ relocated into unit #29.Details
remodel unit #29, 3rd fl: remodel (e) kitchen. add a shower to bath #1. add a sink to toilet room. add a new en-suite bathroom at bedroom #4. relocate washer/dryer. laundry porch converted into dining area. fahu & wh to be replaced/ relocated into unit #29. | $120,000 |
| Jun 16, 2022 | Completed final sign-off Jun 2024 | 619 11th Av | Wei Li Construction | remodel 2 bathrooms at 3rd fl. add a laundry closet.Details
remodel 2 bathrooms at 3rd fl. add a laundry closet. | $30,000 |
| Apr 29, 2022 | Completed final sign-off Aug 2024 | 2864 Jackson St | Planart Construction Corp | revision to pa# 202103176770 per field inspector comments to revise roof framing, add 1-hr rated wall at (e) 4th fl deck & revised 4th fl framing.Details
revision to pa# 202103176770 per field inspector comments to revise roof framing, add 1-hr rated wall at (e) 4th fl deck & revised 4th fl framing. | |
| Mar 9, 2022 | Never finaled issued Mar 2022, no final | 543 Central Av | Kalix Inc Dbalara Construction | soil grouting to support work along north property line foundation under pa# 201910073766.Details
soil grouting to support work along north property line foundation under pa# 201910073766. | $6,000 |
| Dec 17, 2021 | Completed final sign-off Nov 2023 | 2527 14th Av | Norwood Construction | 2nd fl - remodel & expand kitchen into (e) lightwell, including (n) pl firewall from (n) foundation to above roof; remodel & expand hall bathroom into 2nd (e) lightwell & relocate washer/dryer; create (n) master en-suite bathroom; replace (e) rear window w/(n) door; refinishes floors, (n) elec @Details
2nd fl - remodel & expand kitchen into (e) lightwell, including (n) pl firewall from (n) foundation to above roof; remodel & expand hall bathroom into 2nd (e) lightwell & relocate washer/dryer; create (n) master en-suite bathroom; replace (e) rear window w/(n) door; refinishes floors, (n) elec @ | $285,100 |
| Nov 3, 2021 | Never finaled issued Dec 2021, no final | 543 Central Av | Kalix Inc Dbalara Construction | revision to pa 2019-1007-3766 half bath to be built as a full bath and add (n) counter w/sink in workroomDetails
revision to pa 2019-1007-3766 half bath to be built as a full bath and add (n) counter w/sink in workroom | $4,000 |
| Oct 12, 2021 | In progress issued Jul 2024 | 2027 09th Av | Cht Properties Development | horizontal expansion to enlarge existing bedroom at the rear to become a master suite. convert existing ground floor space to become a media room. new interior connecting staircase. new increase of 477sf of conditioned space.Details
horizontal expansion to enlarge existing bedroom at the rear to become a master suite. convert existing ground floor space to become a media room. new interior connecting staircase. new increase of 477sf of conditioned space. | $78,000 |
| Oct 1, 2021 | Completed final sign-off Jun 2026 | 63 Wood St | Ho Pronamic Construction Inc | convert udu into adu to address 2021001666(enf) stemming from complaint#2021726. requires construction of a new 1-hr rated property line wall @ 1st flr between new unit 63a and adjacent attached property 57-59 wood st. also requires inspection of correction of (e) kitchen & bathrm.Details
convert udu into adu to address 2021001666(enf) stemming from complaint#2021726. requires construction of a new 1-hr rated property line wall @ 1st flr between new unit 63a and adjacent attached property 57-59 wood st. also requires inspection of correction of (e) kitchen & bathrm. | $35,000 |
| Sep 22, 2021 | Never finaled issued Jul 2023, no final | 544 Victoria St | Kalix Inc Dbalara Construction | convert (e) 1st garage storage into new rooms down including 1 car garage, one bdr, bath rm, kitchenette, and family rm. (e) stair to 2nd fl to remain. remodel/addition will create 961 sqft area @ 1st fl. at 2nd fl a tile deck will installed over new area w/spiral stair to rear.Details
convert (e) 1st garage storage into new rooms down including 1 car garage, one bdr, bath rm, kitchenette, and family rm. (e) stair to 2nd fl to remain. remodel/addition will create 961 sqft area @ 1st fl. at 2nd fl a tile deck will installed over new area w/spiral stair to rear. | $265,000 |
| Sep 7, 2021 | Completed final sign-off Jul 2023 | 401 Shields St | Kalix Inc Dbalara Construction | at 1st floor/garage replace extg window with a new eero window and lightwell with ladder access to rear yard. at 2nd floor: modify extg bath and closet to create new 1/2 bath. ref to app#202012030157Details
at 1st floor/garage replace extg window with a new eero window and lightwell with ladder access to rear yard. at 2nd floor: modify extg bath and closet to create new 1/2 bath. ref to app#202012030157 | $15,000 |
| Aug 3, 2021 | Expired or cancelled withdrawn Sep 2021 | 2170 Hayes St | remodel two rear 2nd floor rooms to create a master bedroom/bath suite with walk in closet. remodel hall bath to relocate (e) shower & move door to enter from bedroom.new french doors to rear deck. replace one side window & eliminate one side window.Details
remodel two rear 2nd floor rooms to create a master bedroom/bath suite with walk in closet. remodel hall bath to relocate (e) shower & move door to enter from bedroom.new french doors to rear deck. replace one side window & eliminate one side window. | $45,000 | |
| Mar 17, 2021 | Completed final sign-off Oct 2022 | 59 Douglass St | Golden State Marble & Granite Inc. | remodel 2nd floor unit #59 to include a new washer and dryer closet, convert storage area to a new 1/2 bath, create a small office.Details
remodel 2nd floor unit #59 to include a new washer and dryer closet, convert storage area to a new 1/2 bath, create a small office. | $20,000 |
| Mar 17, 2021 | Completed final sign-off Aug 2024 | 2864 Jackson St | remodel unit 2864 jackson street: remove bearing wall btwn dining/living and other various interior walls, add skylights, replace/remove/add windows along side elevation & rear elevation at 3rd floor. install 1 new f.p. & convert extg f.p. to gas. remodel master bedroom & bath.Details
remodel unit 2864 jackson street: remove bearing wall btwn dining/living and other various interior walls, add skylights, replace/remove/add windows along side elevation & rear elevation at 3rd floor. install 1 new f.p. & convert extg f.p. to gas. remodel master bedroom & bath. | $250,000 | |
| Jan 28, 2021 | Never finaled filed Jan 2021, never issued | 2170 Hayes St | rear addition approx. 453 sq ft: new master bedroom & closet, new hallway linen closet, remodel (e) bathroom. west elevation 3rd flr: 5 (e) windows replace in-kind, 1 remove and 2 (n) added. north rear elevation, (n) sliding glass door w/ juliet balcony, (e) french door at 2nd flr rear replace w/Details
rear addition approx. 453 sq ft: new master bedroom & closet, new hallway linen closet, remodel (e) bathroom. west elevation 3rd flr: 5 (e) windows replace in-kind, 1 remove and 2 (n) added. north rear elevation, (n) sliding glass door w/ juliet balcony, (e) french door at 2nd flr rear replace w/ | $150,000 | |
| Jan 21, 2021 | Never finaled issued Apr 2021, no final | 529 Irving St | Kalix Inc Dbalara Construction | 3/f: remodel kitchen, full bathroom and 1/2 bath.replce carpeting throughout,convert portion of (e) clothes closet to a washer/dryer closet.electrical upgrades.all (e) windows to remain.Details
3/f: remodel kitchen, full bathroom and 1/2 bath.replce carpeting throughout,convert portion of (e) clothes closet to a washer/dryer closet.electrical upgrades.all (e) windows to remain. | $55,000 |
| Dec 3, 2020 | Completed final sign-off Jul 2023 | 401 Shields St | Kalix Inc Dbalara Construction | add rooms down including 1 bedroom, 1 bathroom & 1 family room. minor modification to (e) stair. (n) fahu & ductwork throughout. (n) electrical at remodeled areas only.Details
add rooms down including 1 bedroom, 1 bathroom & 1 family room. minor modification to (e) stair. (n) fahu & ductwork throughout. (n) electrical at remodeled areas only. | $75,000 |
| Nov 10, 2020 | Expired or cancelled withdrawn Jul 2022 | 225 Edgehill Wy | add (2)(n) ext'r decks @ 1st&3rd floor,rear yard. (n) deck primarily located @ rear(northeast facade)of the bldg w/ small portion extending to the side(northwest facade).deck(s)will be approx 185sf.rear side facade windows will be replaced or upgraded to doors for decksDetails
add (2)(n) ext'r decks @ 1st&3rd floor,rear yard. (n) deck primarily located @ rear(northeast facade)of the bldg w/ small portion extending to the side(northwest facade).deck(s)will be approx 185sf.rear side facade windows will be replaced or upgraded to doors for decks | $65,000 | |
| Nov 6, 2020 | Never finaled issued Mar 2021, no final | 110 21st Av | Kalix Inc Dbalara Construction | remodel (e) 3/f (unit 110): replace windows, update heating & electrical. remodel includes replacing /remodeling kitchen & bathroom. reconfigure bedrooms & hallway. add skylights. reroof.Details
remodel (e) 3/f (unit 110): replace windows, update heating & electrical. remodel includes replacing /remodeling kitchen & bathroom. reconfigure bedrooms & hallway. add skylights. reroof. | $94,000 |
| Nov 6, 2020 | Never finaled issued Jul 2021, no final | 47 Newburg St | revisions to pa# 2019.0801.7633 to replace front facade plant shelf with new painted metal railing and plant shelf. remove wood siding at 2nd flr pop-out and replace with stucco to match (e) sides of pop-out.Details
revisions to pa# 2019.0801.7633 to replace front facade plant shelf with new painted metal railing and plant shelf. remove wood siding at 2nd flr pop-out and replace with stucco to match (e) sides of pop-out. | $8,500 | |
| Nov 6, 2020 | Completed final sign-off Apr 2021 | 10 Valdez Av | Kalix Inc Dbalara Construction | remodel (e) kitchen including replace 2 side windows, open up wall between dining & kitchen. replace electrical/mech work to accommodate new kitchen layout.Details
remodel (e) kitchen including replace 2 side windows, open up wall between dining & kitchen. replace electrical/mech work to accommodate new kitchen layout. | $45,000 |
| Oct 9, 2020 | Completed final sign-off Aug 2025 | 1039 Cabrillo St | Kalix Inc Dbalara Construction | convert a portion of the existing 1st floor garage/storage area into a new accessory dwelling unit per ordinance 162-16 with 1 bedroom, 1 bathroom, kitchen and living. some structural, electrical and mechanical upgrades. new residential fire sprinkler system at 1st floor.Details
convert a portion of the existing 1st floor garage/storage area into a new accessory dwelling unit per ordinance 162-16 with 1 bedroom, 1 bathroom, kitchen and living. some structural, electrical and mechanical upgrades. new residential fire sprinkler system at 1st floor. | $120,000 |
| Sep 30, 2020 | Completed final sign-off Feb 2022 | 821 32nd Av | Jason Liu Construction Company | remodel kitchen & 2 bathrooms. replace all windows, roof. upgrade electrical. replace forced air furnace. modify exterior entry stair side walls. replace exterior stair risers/treads. install new exterior stair handrail.Details
remodel kitchen & 2 bathrooms. replace all windows, roof. upgrade electrical. replace forced air furnace. modify exterior entry stair side walls. replace exterior stair risers/treads. install new exterior stair handrail. | $280,000 |
| Sep 18, 2020 | Completed final sign-off Jun 2021 | 1744 Sanchez St | Phase 2 Builders | revision bpa#201908148814. previously submitted 1/2 bath to full baht w/shower. modify kitchen cabinetry & appliance layoutDetails
revision bpa#201908148814. previously submitted 1/2 bath to full baht w/shower. modify kitchen cabinetry & appliance layout | |
| Jul 21, 2020 | Completed final sign-off Apr 2021 | 10 Valdez Av | Kalix Inc Dbalara Construction | remodel (e) hall bathroom & convert (e) master study into a master bath and closet add 2 windows, modify 2 windows and eliminate 2 windowsDetails
remodel (e) hall bathroom & convert (e) master study into a master bath and closet add 2 windows, modify 2 windows and eliminate 2 windows | $63,000 |
| Jul 21, 2020 | Completed final sign-off Sep 2021 | 619 11th Av | Wei Li Construction | construct a deck at the rear yard approx 6'3 above grade. deck is entirely within buildable area and not encroach rear 30% of lot. deck size is approx 75 sf with stair to yardDetails
construct a deck at the rear yard approx 6'3 above grade. deck is entirely within buildable area and not encroach rear 30% of lot. deck size is approx 75 sf with stair to yard | $6,000 |
| Jun 10, 2020 | Expired or cancelled expired Feb 2025 | 225 Edgehill Wy | Boswell Builders | convert a portion of the master bedroom into a bathroom with a shower, toilet, double sink vanity and storage. to be coordinated with other master bedroom work permited under pa201912300897. no work in other areas.Details
convert a portion of the master bedroom into a bathroom with a shower, toilet, double sink vanity and storage. to be coordinated with other master bedroom work permited under pa201912300897. no work in other areas. | $32,000 |
| Feb 20, 2020 | Completed final sign-off Aug 2022 | 251 San Carlos St | Kevin Lehane Construction | rebuild extg wall along property line to be 1 hour rated fire wall at 2nd & 3rd floors & reduce 3rd floor deck size. revision to app#201801108343Details
rebuild extg wall along property line to be 1 hour rated fire wall at 2nd & 3rd floors & reduce 3rd floor deck size. revision to app#201801108343 | |
| Feb 7, 2020 | Completed final sign-off Sep 2021 | 669 Marina Bl | create a (n) legal adu per city ord #95-17. (n) 1st flr adu will include a kitchenette, living area and one bedroom; no expansion of existing footprintDetails
create a (n) legal adu per city ord #95-17. (n) 1st flr adu will include a kitchenette, living area and one bedroom; no expansion of existing footprint | $400,000 | |
| Feb 7, 2020 | Expired or cancelled withdrawn Dec 2020 | 669 Marina Bl | 1st story horizontal expansion into rear yard to create one new adu (pa #2020-0207-3897)Details
1st story horizontal expansion into rear yard to create one new adu (pa #2020-0207-3897) | $100,000 | |
| Dec 30, 2019 | Expired or cancelled expired Feb 2025 | 225 Edgehill Wy | Boswell Builders | remodel extg 1st floor master bedroom including remove 2 support posts and insert a new beam, build out new closet.Details
remodel extg 1st floor master bedroom including remove 2 support posts and insert a new beam, build out new closet. | $18,000 |
| Oct 24, 2019 | Never finaled issued Aug 2021, no final | 1615 Mason St | Sean Rattigan Construction | vertical addition of a 4th fl master bed & bath with exteriror roof deck and new connecting stairs to 3rd fl. small expansion of 3rd fl dining room area over existing deck @ center courtyard. see pa#201904016778 for related foundation work, planning #2019004528prl.Details
vertical addition of a 4th fl master bed & bath with exteriror roof deck and new connecting stairs to 3rd fl. small expansion of 3rd fl dining room area over existing deck @ center courtyard. see pa#201904016778 for related foundation work, planning #2019004528prl. | $170,000 |
| Oct 24, 2019 | Completed final sign-off May 2021 | 35 San Lorenzo Wy | Kalix Inc Dbalara Construction | 1st fl - including kitchen, laundry rm, guest bath and 1/2 bath. 2nd fl - bath 2 remodel, master bath remodel and convert (e) closet to laundry room; 3rd fl - remodel bath 4 and add skylights. minor window revisions approved by hoa, letter of approval included w/plansDetails
1st fl - including kitchen, laundry rm, guest bath and 1/2 bath. 2nd fl - bath 2 remodel, master bath remodel and convert (e) closet to laundry room; 3rd fl - remodel bath 4 and add skylights. minor window revisions approved by hoa, letter of approval included w/plans | $240,000 |
| Oct 24, 2019 | Never finaled issued Nov 2019, no final | 1650 11th Av | revision to pa 2019-0111-0203 add a wall between kitchen & living to create a officeDetails
revision to pa 2019-0111-0203 add a wall between kitchen & living to create a office | $850 | |
| Oct 7, 2019 | Never finaled issued Jun 2021, no final | 543 Central Av | Kalix Inc Dbalara Construction | convert (e) 1st fl storage room to full bath into useable rooms down w/ 1/2 bath & laundry sink per zoning admin bullitin #1. nsr restriction to be modified to allow for residential occupancy (see app #9305938)Details
convert (e) 1st fl storage room to full bath into useable rooms down w/ 1/2 bath & laundry sink per zoning admin bullitin #1. nsr restriction to be modified to allow for residential occupancy (see app #9305938) | $80,000 |
| Sep 26, 2019 | Never finaled issued Oct 2019, no final | 47 Newburg St | Jason Liu Construction Company | revision to 201908017633 to replace (e) front windows fron facade. marvin ultimate clad windowsDetails
revision to 201908017633 to replace (e) front windows fron facade. marvin ultimate clad windows | $5,000 |
| Aug 14, 2019 | Completed final sign-off Jun 2021 | 1744 Sanchez St | Phase 2 Builders | extend 1st fl interior stairs down into basement/garage & add a closet. remodel 1st fl kitchen, bathroom, hallway closet area & office. remodel 2nd fl storage closet into wash/dry room, & remodel/extend 2nd flmaster bath toward rear yard over (e) 1st flroof. minor re-route of fahu & elect work.Details
extend 1st fl interior stairs down into basement/garage & add a closet. remodel 1st fl kitchen, bathroom, hallway closet area & office. remodel 2nd fl storage closet into wash/dry room, & remodel/extend 2nd flmaster bath toward rear yard over (e) 1st flroof. minor re-route of fahu & elect work. | $225,000 |
| Aug 1, 2019 | Completed final sign-off Oct 2021 | 47 Newburg St | Jason Liu Construction Company | remodel e basement to include new bath, media room, storage. enclose e tunnel entrance and make interior hall w closet. remove 2nd fl tunnel entry walls and oor. replace 3 skylights, remodel kitchen and bath 2nd fl. add 1 powder rmDetails
remodel e basement to include new bath, media room, storage. enclose e tunnel entrance and make interior hall w closet. remove 2nd fl tunnel entry walls and oor. replace 3 skylights, remodel kitchen and bath 2nd fl. add 1 powder rm | $220,000 |
| Jul 17, 2019 | Completed final sign-off Oct 2020 | 2619 22nd St | Neng Construction, Inc. | build an (e) adu at the rear of the peroperty per sf city ord #162-16.Details
build an (e) adu at the rear of the peroperty per sf city ord #162-16. | $14,450 |
| Jul 8, 2019 | Completed final sign-off Oct 2021 | 87 Manchester St | Elliott Build Remodel Llc | remodel extg 1st floor powder room, remove hall & storage room walls to open up living room, add utility sink and cabinet at garage. replace water heater and fahu. minor structural work to prepare for new balcony under app#201809069285Details
remodel extg 1st floor powder room, remove hall & storage room walls to open up living room, add utility sink and cabinet at garage. replace water heater and fahu. minor structural work to prepare for new balcony under app#201809069285 | $32,000 |
| Jun 14, 2019 | Completed final sign-off Nov 2019 | 27 Belvedere St | Kalix Inc Dbalara Construction | expand scope of permitted kitchen & bath remodel. (permit #201809261494) to include removal of some walls, a new kitchen island & minor revision at bathroom plans. convert hall closet to laundry.Details
expand scope of permitted kitchen & bath remodel. (permit #201809261494) to include removal of some walls, a new kitchen island & minor revision at bathroom plans. convert hall closet to laundry. | $6,800 |
| Jun 14, 2019 | Completed final sign-off Aug 2019 | 163 Beaumont Av | convert (e) large walk-in closet back to a bedroom which was it original use.Details
convert (e) large walk-in closet back to a bedroom which was it original use. | $8,500 | |
| May 9, 2019 | Completed final sign-off Nov 2019 | 27 Belvedere St | Kalix Inc Dbalara Construction | enclose (e) lightwell and create a (n) full bath at 4th fl. install 1-hr wall at property line where lightwell is infilledDetails
enclose (e) lightwell and create a (n) full bath at 4th fl. install 1-hr wall at property line where lightwell is infilled | $25,000 |
| Apr 25, 2019 | Never finaled issued Nov 2019, no final | 30 Delano Av | horizontal addition. remodel 2nd fl bathroom. remove(e)stairs to 1/fl & build (n)stairs.modify closet bedrm #2.replace foundation & lower slab@1/fl to create(n)master bedrm/bathrm,laundry,family rm&closets.add 90 sqft living area @ back of bldg with property line fire wall & 2nd fl deck.Details
horizontal addition. remodel 2nd fl bathroom. remove(e)stairs to 1/fl & build (n)stairs.modify closet bedrm #2.replace foundation & lower slab@1/fl to create(n)master bedrm/bathrm,laundry,family rm&closets.add 90 sqft living area @ back of bldg with property line fire wall & 2nd fl deck. | $185,000 | |
| Apr 1, 2019 | Completed final sign-off Sep 2026 | 1615 Mason St | Hon's Construction Inc., Sean Rattigan Construction | foundation work including retaining wall replacement at garage level and framing required to widen garage door. existing garage door to be widened from 8'-0" to 10'-0", foundation work includes new drilled piers, remodel (e) 3rd fl. unit 1615, including kitchen, bathrooms & living roomDetails
foundation work including retaining wall replacement at garage level and framing required to widen garage door. existing garage door to be widened from 8'-0" to 10'-0", foundation work includes new drilled piers, remodel (e) 3rd fl. unit 1615, including kitchen, bathrooms & living room | $350,000 |
| Mar 7, 2019 | Expired or cancelled cancelled May 2020 | 669 Marina Bl | maintenance & minor upgrade of (e) 3 story facade. middle & rear portions of the house to be removed & replaced with (n) 4 story.a (n) elevator,(n) rear decks over 1st & 2nd story living spaces.(n) roof deck w/ sliding skylight access. full foundation replcament,(n) heating, ac & electrical throughtDetails
maintenance & minor upgrade of (e) 3 story facade. middle & rear portions of the house to be removed & replaced with (n) 4 story.a (n) elevator,(n) rear decks over 1st & 2nd story living spaces.(n) roof deck w/ sliding skylight access. full foundation replcament,(n) heating, ac & electrical throught | $1,200,000 | |
| Jan 25, 2019 | Never finaled issued Jan 2021, no final | 1371 Vallejo St | legalize (e) unauthorized dwelling unit per ordinance 43-14 @ 1st flr and address complaint #201887123. install fire sprinkler system @ entire 1st floor and exit passageway. no changes to front facade.Details
legalize (e) unauthorized dwelling unit per ordinance 43-14 @ 1st flr and address complaint #201887123. install fire sprinkler system @ entire 1st floor and exit passageway. no changes to front facade. | $40,000 | |
| Jan 24, 2019 | Completed final sign-off Aug 2019 | 15 Valdez Av | Kalix Inc Dbalara Construction | remodel (e) kitchen & open up to dining room. remodel master bath & hall bath, replace (e) stairs to 1st flr w/ (n) code compliant stairway, replace windows at side & rear of house. (n) heating system & electr upgrades.Details
remodel (e) kitchen & open up to dining room. remodel master bath & hall bath, replace (e) stairs to 1st flr w/ (n) code compliant stairway, replace windows at side & rear of house. (n) heating system & electr upgrades. | $95,000 |
| Jan 11, 2019 | Completed final sign-off Mar 2020 | 1650 11th Av | legalize an (e) unauthorized dwelling unit on ground floor per ordiance 43-14. entire 1st fl to be upgraded to include fire sprinkler system. all three flrs to include manual fire alarm system. verify (e) strl complies w/ lateral force resisting per 2016 sfbc sec 407 change of occupancy r3 to r2.Details
legalize an (e) unauthorized dwelling unit on ground floor per ordiance 43-14. entire 1st fl to be upgraded to include fire sprinkler system. all three flrs to include manual fire alarm system. verify (e) strl complies w/ lateral force resisting per 2016 sfbc sec 407 change of occupancy r3 to r2. | $10,500 | |
| Oct 26, 2018 | Completed final sign-off Jun 2020 | 482 Douglass St | C G Adams Construction | remodel 2/f including replace/relocate kitchen, bathrm, bedrm, living rm. new stairs to 1/f. 1/f: 2 new bedrms, 1-1/2 baths, and associated storage/closet. no work at 3rd fl except (n) fahu. new radiant heating at 1/f & 2/f.Details
remodel 2/f including replace/relocate kitchen, bathrm, bedrm, living rm. new stairs to 1/f. 1/f: 2 new bedrms, 1-1/2 baths, and associated storage/closet. no work at 3rd fl except (n) fahu. new radiant heating at 1/f & 2/f. | $285,000 |