Block 2936A, lot 053
225 Edgehill Way
- City’s use
- Single Family Residential
- Built
- 1948
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,346 sq ft
- Lot
- 3,985 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 11, 2025 | Completed final sign-off Feb 2025 | 225 Edgehill Wy | Next Level Construction | to obtain final inspection for work approved under permits 201912300897, 202006108354. all work is complete.Details
to obtain final inspection for work approved under permits 201912300897, 202006108354. all work is complete. | |
| May 19, 2023 | Never finaled issued May 2023, no final | 225 Edgehill Wy | At6 Design Build | replace exterior siding in-kind, structural upgrades @ exterior, new exterior plywood & ledger board installation in preparation for future decks under separate permit (202207148464)Details
replace exterior siding in-kind, structural upgrades @ exterior, new exterior plywood & ledger board installation in preparation for future decks under separate permit (202207148464) | $20,000 |
| Sep 2, 2022 | Completed final sign-off Jun 2024 | 225 Edgehill Wy | window replacement of non-original fiberglass units at front (south) and side (east) facade with new (n) metal windows same size, in-kind. max u-factor 0.30 or better. total of (3).Details
window replacement of non-original fiberglass units at front (south) and side (east) facade with new (n) metal windows same size, in-kind. max u-factor 0.30 or better. total of (3). | $5,000 | |
| Jul 14, 2022 | In progress issued Apr 2024 | 225 Edgehill Wy | At6 Design Build | new exterior rear decks @ 1st & 2nd floor. replace 1 window @ 1st floor with door for access to new deck.Details
new exterior rear decks @ 1st & 2nd floor. replace 1 window @ 1st floor with door for access to new deck. | $80,000 |
| Jun 10, 2022 | Completed final sign-off Jun 2024 | 225 Edgehill Wy | At6 Design Build | (e) hipped roof reframing and replacement. interior renovation of (e) kitchen including removal of interior walls. front door replacement. replace rear windows and doors all other work not visible from public row.Details
(e) hipped roof reframing and replacement. interior renovation of (e) kitchen including removal of interior walls. front door replacement. replace rear windows and doors all other work not visible from public row. | $187,000 |
| May 27, 2022 | Expired or cancelled withdrawn Jun 2022 | 225 Edgehill Wy | At6 Design Build | partial replacement, in kind of (e)hipped roof reframing at rear of building (north + north east elevation) front door replacement. window replacements. window replacements at rear and weat side (no impact on public right of way). interior renovation of existing kitchen including removal of interiorDetails
partial replacement, in kind of (e)hipped roof reframing at rear of building (north + north east elevation) front door replacement. window replacements. window replacements at rear and weat side (no impact on public right of way). interior renovation of existing kitchen including removal of interior | $150,000 |
| Nov 10, 2020 | Expired or cancelled withdrawn Jul 2022 | 225 Edgehill Wy | add (2)(n) ext'r decks @ 1st&3rd floor,rear yard. (n) deck primarily located @ rear(northeast facade)of the bldg w/ small portion extending to the side(northwest facade).deck(s)will be approx 185sf.rear side facade windows will be replaced or upgraded to doors for decksDetails
add (2)(n) ext'r decks @ 1st&3rd floor,rear yard. (n) deck primarily located @ rear(northeast facade)of the bldg w/ small portion extending to the side(northwest facade).deck(s)will be approx 185sf.rear side facade windows will be replaced or upgraded to doors for decks | $65,000 | |
| Jun 10, 2020 | Expired or cancelled expired Feb 2025 | 225 Edgehill Wy | Boswell Builders | convert a portion of the master bedroom into a bathroom with a shower, toilet, double sink vanity and storage. to be coordinated with other master bedroom work permited under pa201912300897. no work in other areas.Details
convert a portion of the master bedroom into a bathroom with a shower, toilet, double sink vanity and storage. to be coordinated with other master bedroom work permited under pa201912300897. no work in other areas. | $32,000 |
| Dec 30, 2019 | Expired or cancelled expired Feb 2025 | 225 Edgehill Wy | Boswell Builders | remodel extg 1st floor master bedroom including remove 2 support posts and insert a new beam, build out new closet.Details
remodel extg 1st floor master bedroom including remove 2 support posts and insert a new beam, build out new closet. | $18,000 |
| Aug 5, 2019 | Completed final sign-off Aug 2019 | 225 Edgehill Wy | New High Protection Roofing | reroofingDetails
reroofing | $4,000 |
| Mar 8, 2013 | Completed final sign-off May 2013 | 225 Edgehill Wy | H S Construction And Associates Co | remove crack driveway and pour new concrete 11 ft. x 16 ft. - 6" thick, #4 @ 16"o.c. each wayDetails
remove crack driveway and pour new concrete 11 ft. x 16 ft. - 6" thick, #4 @ 16"o.c. each way | $3,000 |
| Oct 13, 2011 | Never finaled issued Oct 2011, no final | 225 Edgehill Wy | Bay Area Overhead Door Co. | replace wood garage door with wood garage, garage door, paint to match, no structural changes, visible from the street.Details
replace wood garage door with wood garage, garage door, paint to match, no structural changes, visible from the street. | $7,498 |
| Oct 19, 2010 | Completed final sign-off Nov 2010 | 225 Edgehill Wy | Excelsior Roofing Company | reroofingDetails
reroofing | $15,435 |
| Jun 23, 2000 | Completed final sign-off Oct 2000 | 225 Edgehill Wy | kitchen remodel, replace all cabinets, new appliancesDetails
kitchen remodel, replace all cabinets, new appliances | $10,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.