Bay Area Builders
- Based in
- San Francisco
- On San Francisco permits
- Jul 2010 to Aug 2026
- Last 24 months
- 6 permits filed
45 permits since 2000: 39 completed, 2 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | In progress issued Aug 2026 | 118 08th Av | remodeling (2) (e) baths and (2) (e) kitchens in-kind on 2nd & 3rd fl. replace (e) windows, except those on street facing elevation. add (1) bath. add wall between garage & breezeway.Details
remodeling (2) (e) baths and (2) (e) kitchens in-kind on 2nd & 3rd fl. replace (e) windows, except those on street facing elevation. add (1) bath. add wall between garage & breezeway. | $140,000 |
| Feb 11, 2026 | Completed final sign-off May 2026 | 2706 43rd Av | remodel 2nd floor bathroom w/ shower pan. all work in kind.Details
remodel 2nd floor bathroom w/ shower pan. all work in kind. | $15,000 |
| Oct 21, 2025 | Completed final sign-off May 2026 | 2026 36th Av | remodel kitchen and 2 bathroom in kind, like for like, on the 2nd level. no change to floor layout. no change to wall layout. no structural work.Details
remodel kitchen and 2 bathroom in kind, like for like, on the 2nd level. no change to floor layout. no change to wall layout. no structural work. | $75,000 |
| Sep 4, 2025 | Completed final sign-off Dec 2025 | 1449 Vallejo St | remodel hallway bathroom and laundry closet in-kind.Details
remodel hallway bathroom and laundry closet in-kind. | $20,000 |
| Mar 6, 2025 | Completed final sign-off Nov 2025 | 1463 11th Av | legalize as-built entertainment room, office, 1 bedroom, & full bath on g/f per plan.Details
legalize as-built entertainment room, office, 1 bedroom, & full bath on g/f per plan. | $8,000 |
| Dec 17, 2024 | Expired or cancelled withdrawn May 2025 | 1463 11th Av | remodel bathroom on 1st fl. street level in kindDetails
remodel bathroom on 1st fl. street level in kind | $15,000 |
| Jun 12, 2024 | In progress issued Jan 2025 | 2838 Greenwich St | replace (e) mailbox at exterior stair wall.Details
replace (e) mailbox at exterior stair wall. | $1,500 |
| Apr 1, 2024 | Completed final sign-off May 2025 | 2838 Greenwich St | remodel for 2 (e) bathrooms for apartment. wall removal.Details
remodel for 2 (e) bathrooms for apartment. wall removal. | $42,000 |
| Jan 16, 2024 | Completed final sign-off Mar 2024 | 2451 31st Av | remodel 2nd fl bathroom in kind.Details
remodel 2nd fl bathroom in kind. | $20,000 |
| Jun 23, 2023 | Expired or cancelled cancelled Jan 2024 | 1463 11th Av | partially remove wall between (e) kitchen and (e) dining for open deign on 2/f.Details
partially remove wall between (e) kitchen and (e) dining for open deign on 2/f. | $3,000 |
| Feb 28, 2023 | Completed final sign-off Oct 2023 | 730 20th Av | remodel both kitchens in (e) residential 2 unit dwelling. replace (e) boiler with (n) boiler. no other work. no structural workDetails
remodel both kitchens in (e) residential 2 unit dwelling. replace (e) boiler with (n) boiler. no other work. no structural work | $18,000 |
| Nov 5, 2021 | Completed final sign-off Jul 2022 | 2706 43rd Av | remodel kitchen on 2/f. replace window with sliding door on 2/f. replace water heater with tankless type.Details
remodel kitchen on 2/f. replace window with sliding door on 2/f. replace water heater with tankless type. | $40,000 |
| Aug 19, 2021 | Completed final sign-off Nov 2021 | 1571 31st Av | remodel 2nd fl bathroom "in kind" and remodel toilet room with sink added. add exhaust fan vent through roof and led lights.Details
remodel 2nd fl bathroom "in kind" and remodel toilet room with sink added. add exhaust fan vent through roof and led lights. | $20,000 |
| Oct 16, 2020 | Completed final sign-off Dec 2020 | 1754 20th Av | remodel bathroom in kindDetails
remodel bathroom in kind | $15,000 |
| Oct 16, 2020 | Completed final sign-off Feb 2021 | 807 29th Av | remodel kitchen in-kindDetails
remodel kitchen in-kind | $20,000 |
| Jan 24, 2020 | Never finaled issued Jan 2020, no final | 274 26th Av | replace 6 street facing windows with pella impervia and one bedroom windowDetails
replace 6 street facing windows with pella impervia and one bedroom window | $4,000 |
| Dec 26, 2019 | Completed final sign-off May 2020 | 3333 21st St | remodel kitchen in kind. no structural work. comply with cec 150.0(k)3.Details
remodel kitchen in kind. no structural work. comply with cec 150.0(k)3. | $20,000 |
| Oct 21, 2019 | Completed final sign-off Oct 2020 | 3245 Quintara St | remodel bathroom in-kind, 5'.5" x 7' sq. ft.Details
remodel bathroom in-kind, 5'.5" x 7' sq. ft. | $15,000 |
| Oct 21, 2019 | Completed final sign-off Nov 2019 | 3719 Market St | 1/f, below street: correct code violation 201723161, inspect dryer vent. to comply w/his nov 2017023161 dated 12/8/2017Details
1/f, below street: correct code violation 201723161, inspect dryer vent. to comply w/his nov 2017023161 dated 12/8/2017 | $500 |
| Apr 23, 2019 | Completed final sign-off Sep 2019 | 395 Upper Tr | demolish and renovation of 2 bathrooms in 395 upper terrace; electrical upgrade with new electrical box move one non-bearing wall 1 foot to southDetails
demolish and renovation of 2 bathrooms in 395 upper terrace; electrical upgrade with new electrical box move one non-bearing wall 1 foot to south | $38,672 |
| Nov 21, 2017 | Completed final sign-off Apr 2019 | 3245 Quintara St | remodel kitchen relocate a window facing street close a window on 2nd flr. legalize a storage room on 1/f; maher naDetails
remodel kitchen relocate a window facing street close a window on 2nd flr. legalize a storage room on 1/f; maher na | $23,000 |
| Nov 16, 2017 | Completed final sign-off Mar 2018 | 1571 31st Av | remodel kitchen in kind. repair/replace 1 window in lightwell, not visible from street, same size, same location. nax u-factor 0.32Details
remodel kitchen in kind. repair/replace 1 window in lightwell, not visible from street, same size, same location. nax u-factor 0.32 | $20,000 |
| Dec 23, 2016 | Completed final sign-off Jun 2018 | 606 30th Av | rev to pa201007217126: change simpson strong-tie pre-fab steel frame along front wall to custom built steel frame.Details
rev to pa201007217126: change simpson strong-tie pre-fab steel frame along front wall to custom built steel frame. | |
| Sep 30, 2016 | Completed final sign-off Dec 2016 | 429 Cabrillo St | revision to 201608044242 to reconfigure bathroom fixture and door opening on 1st floor per planDetails
revision to 201608044242 to reconfigure bathroom fixture and door opening on 1st floor per plan | |
| Sep 29, 2016 | Completed final sign-off Feb 2019 | 575 42nd Av | revision to pa 2016-0608-9408 to reconfigure bathroom fixture; relocate 2 closets and add a door opening at mud room on 1st floor per planDetails
revision to pa 2016-0608-9408 to reconfigure bathroom fixture; relocate 2 closets and add a door opening at mud room on 1st floor per plan | |
| Aug 22, 2016 | Completed final sign-off Dec 2016 | 600 Cambridge St | 1) revision to app#201606018875. 2)relocation of kitchen fixtures on 2nd per plan. 3)relocation of bathroom fixtures on 3rd per plan.Details
1) revision to app#201606018875. 2)relocation of kitchen fixtures on 2nd per plan. 3)relocation of bathroom fixtures on 3rd per plan. | |
| Aug 4, 2016 | Completed final sign-off Dec 2016 | 429 Cabrillo St | 1st fl, add 1 laundry and 1 storage per plan, add 1 new bathroom on 1st floor per planDetails
1st fl, add 1 laundry and 1 storage per plan, add 1 new bathroom on 1st floor per plan | $2,000 |
| Jun 8, 2016 | Completed final sign-off Feb 2019 | 575 42nd Av | add 2 new bedrooms, one family room, one laundry room, one mud room and one new bathroom on 1st floor per planDetails
add 2 new bedrooms, one family room, one laundry room, one mud room and one new bathroom on 1st floor per plan | $20,000 |
| Jun 1, 2016 | Expired or cancelled expired Nov 2017 | 600 Cambridge St | kitchen remodel with addition of small deck on 2nd fl. remodel e master bath and relocate bath fixtures on 3rd fl per planDetails
kitchen remodel with addition of small deck on 2nd fl. remodel e master bath and relocate bath fixtures on 3rd fl per plan | $18,000 |
| May 17, 2016 | Completed final sign-off Jun 2016 | 250 King St | replace kitchen cabinets and counter top with appliances in kind. one kitchen remodel; n/a maher ord # 155-13Details
replace kitchen cabinets and counter top with appliances in kind. one kitchen remodel; n/a maher ord # 155-13 | $8,000 |
| Mar 23, 2016 | Completed final sign-off Aug 2016 | 1610 47th Av | remodel kitchen in-kind.Details
remodel kitchen in-kind. | $10,000 |
| May 18, 2015 | Completed final sign-off Nov 2015 | 1918 Lane St | remodel kitchen/bathroom "in-kind"Details
remodel kitchen/bathroom "in-kind" | $30,000 |
| Oct 16, 2014 | Completed final sign-off Sep 2015 | 575 42nd Av | revision to appl #2014.0916.6421 - add two skylights & one sink at powder room on 2nd floor per plan. replace front window in-kind. add new lighting fixtures to (e) living room.Details
revision to appl #2014.0916.6421 - add two skylights & one sink at powder room on 2nd floor per plan. replace front window in-kind. add new lighting fixtures to (e) living room. | $2,000 |
| Sep 16, 2014 | Completed final sign-off Sep 2015 | 575 42nd Av | in-fill lightwell on 1st and 2nd flrs per plan, remodel kitchen on 2nd flr, remove (e) storage, remodel (e) bath and add (n) master bathroom per plan.Details
in-fill lightwell on 1st and 2nd flrs per plan, remodel kitchen on 2nd flr, remove (e) storage, remodel (e) bath and add (n) master bathroom per plan. | $25,000 |
| Jul 30, 2014 | Completed final sign-off Feb 2015 | 410 Campbell Av | remodel kitchen on 2nd fl per plan. install new recessed lights at kitchenDetails
remodel kitchen on 2nd fl per plan. install new recessed lights at kitchen | $1,000 |
| Jun 16, 2014 | Completed final sign-off Sep 2014 | 2045 Irving St | g/f shop - demolish wall, construct new wall, extend counter space. change of use from yogurt store to bakery; exhaust hood for oven under separate permit.Details
g/f shop - demolish wall, construct new wall, extend counter space. change of use from yogurt store to bakery; exhaust hood for oven under separate permit. | $10,000 |
| Sep 9, 2013 | Completed final sign-off Nov 2014 | 875 28th Av | remove and install drywall, install insulation and update electrical for back & bedrooms & closet, replace in kind.Details
remove and install drywall, install insulation and update electrical for back & bedrooms & closet, replace in kind. | $5,000 |
| Mar 9, 2012 | Completed final sign-off Jan 2013 | 2463 30th Av | comply w/nov #201290154 dated 2/22/12 - demolish un-permitted kitchen & install washer & dryer on ground floor/garage level. install interior stair case from ground floor to 2nd floor at the original place.Details
comply w/nov #201290154 dated 2/22/12 - demolish un-permitted kitchen & install washer & dryer on ground floor/garage level. install interior stair case from ground floor to 2nd floor at the original place. | $5,000 |
| Dec 7, 2011 | Completed final sign-off Feb 2012 | 5108 Geary Bl | revision of pa #201109235371. relocate toilet room, shower room and steam room.Details
revision of pa #201109235371. relocate toilet room, shower room and steam room. | |
| Oct 20, 2011 | Completed final sign-off Dec 2011 | 479 08th Av | install ceramic, fiber board siding for the west-side & south side facing rear of the building using hardie plank siding. not front replacement or installation .Details
install ceramic, fiber board siding for the west-side & south side facing rear of the building using hardie plank siding. not front replacement or installation . | $10,000 |
| Sep 23, 2011 | Completed final sign-off Feb 2012 | 5108 Geary Bl | change of use, from b-10 to b-13, add a shower room, a steam room & upgrade (e) toilet. change (e) office space to body healing office.Details
change of use, from b-10 to b-13, add a shower room, a steam room & upgrade (e) toilet. change (e) office space to body healing office. | $30,000 |
| Jun 16, 2011 | Completed final sign-off Sep 2011 | 1326 Greenwich St | front bldg - replacement of (5) rear porch windows, (2) kitchen windows at the rear & (1) bathroom window at rear in like-kind configuration & size. replacement window units to to double pane & .40 max u-value.Details
front bldg - replacement of (5) rear porch windows, (2) kitchen windows at the rear & (1) bathroom window at rear in like-kind configuration & size. replacement window units to to double pane & .40 max u-value. | $2,500 |
| May 11, 2011 | Completed final sign-off Sep 2011 | 1326 Greenwich St | repair/replace bathroom cabinets, fixtures and finishes. no structural work to be performed and no change to any structural partitions. new lighting work and new replacement exhaust fan. (approx. 5'x7' bathroom). lighting changes must comply w/ cec 150(k).Details
repair/replace bathroom cabinets, fixtures and finishes. no structural work to be performed and no change to any structural partitions. new lighting work and new replacement exhaust fan. (approx. 5'x7' bathroom). lighting changes must comply w/ cec 150(k). | $12,000 |
| May 5, 2011 | Completed final sign-off Sep 2011 | 1326 Greenwich St | replace kitchen cabinets, fixtures and finishes. no structural work to be performed and no change to any structural partitions. new lighting work.Details
replace kitchen cabinets, fixtures and finishes. no structural work to be performed and no change to any structural partitions. new lighting work. | $29,000 |
| Jul 21, 2010 | Completed final sign-off Jun 2018 | 606 30th Av | vertical addition. add a master bedroom with full bath, walk-in closet & sitting area on top of (e) 3 story building. enclose (e) exterior non-conforming stairs & add (n) rear decks &Details
vertical addition. add a master bedroom with full bath, walk-in closet & sitting area on top of (e) 3 story building. enclose (e) exterior non-conforming stairs & add (n) rear decks & | $50,000 |